ML112971553
ML112971553 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 10/21/2011 |
From: | Bruno Caballero Operations Branch III |
To: | Tynan T Southern Nuclear Operating Co |
References | |
50-424/12-301, 50-425/12/301 | |
Download: ML112971553 (7) | |
See also: IR 05000424/2012301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
October 21, 2011
Mr. Tom E. Tynan
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT: VOGTLE - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION
05000424/2012301 AND 05000425/2012301
Dear Mr. Tynan:
In a telephone conversation on October 12, 2011, between Mr. Greg Wainwright, Operations
Training Instructor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were made
for the administration of licensing examinations at Vogtle. The operating test is scheduled to be
administered during the weeks of March 26, 2012, April 9, 2012; and April 16, 2012. The written
examination is scheduled to be administered either the week of April 16, 2012, or the week of
April 23, 2012, depending on the need for the third week of the operating test. The on-site
preparatory week is scheduled for the week of March 5, 2012.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by December 12, 2011. Mr. Mark Bates provided the written examination outline to your
staff in June, 2011. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by January 17, 2012. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outline, examination, and test
before they are submitted to the NRC for review and approval. All materials shall be complete
and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
SNC 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on February
28, 2013. The public reporting burden for this collection of information is estimated to average
500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining
the data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Wainwright has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Michael Meeks at (404) 997-4467,
SNC 3
(Internet E-mail: Michael.Meeks@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail:
Mark.Bates@nrc.gov), or me at (404) 997-4608, (Internet E-mail: Bruno.Caballero@nrc.gov).
Sincerely,
/RA/
Bruno L. Caballero, Acting Chief
Operations Branch 1
Division of Reactor Safety
Docket No.: 50-424, 50-425
cc: See Page 4
_ML112971553______________ XG SUNSI REVIEW COMPLETE x FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS RII:DRS
NAME MEEKS BATES CABALLERO
DATE 10/ 21/2011 10/21/2011 10/21/2011
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
SNC 4
cc w/encl: B. D. McKinney, Jr.
S. Kuczynski Regulatory Response Manager
Chairman, President and CEO Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
T. D. Honeycutt
Jeffrey T. Gasser Regulatory Response Supervisor
Chief Nuclear Officer Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
L. P. Hill
N. J. Stringfellow Licensing Supervisor
Licensing Manager Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
R. L. Gladney
Paula Marino Licensing Engineer
Vice President Southern Nuclear Operating Company, Inc.
Engineering Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. L. Crumpton
Administrative Assistant, Sr.
L. Mike Stinson Southern Nuclear Operating Company, Inc.
Vice President Electronic Mail Distribution
Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc. Hickox, T. Mark
Electronic Mail Distribution Vogtle Electric Generating Plant
Electronic Mail Distribution
Dennis R. Madison
Vice President S. C. Swanson
Edwin I. Hatch Nuclear Plant Site Support Manager
Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant
Electronic Mail Distribution Electronic Mail Distribution
J. L. Pemberton Senior Resident Inspector
SVP & General Counsel-Ops & SNC U.S. Nuclear Regulatory Commission
Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant
Electronic Mail Distribution 7821 River Road
Waynesboro, GA 30830
T. E. Tynan
Site Vice President Bob Masse
Vogtle Electric Generating Plant Resident Manager
Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant
Electronic Mail Distribution Oglethorpe Power Corporation
Electronic Mail Distribution
M. J. Ajluni
Nuclear Licensing Director
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
(cc contd - See page 5)
SNC 5
(cc contd) James A. Capp
Arthur H. Domby, Esq. Program Coordination Branch Chief
Troutman Sanders Environmental Protection Division
Electronic Mail Distribution Georgia Department of Natural Resources
Electronic Mail Distribution
Sandra Threatt, Manager
Nuclear Response and Emergency James C. Hardeman
Environmental Surveillance Environmental Radiation Program Manager
Bureau of Land and Waste Management Environmental Protection Division
Department of Health and Environmental Georgia Department of Natural Resources
Control Electronic Mail Distribution
Electronic Mail Distribution
Al Frazier
Division of Radiological Health Emergency Response and Radiation
TN Dept. of Environment & Conservation Program Manager
401 Church Street Environmental Protection Division
Nashville, TN 37243-1532 Georgia Department of Natural Resources
Electronic Mail Distribution
Richard Haynes
Director, Division of Waste Management Mr. Steven M. Jackson
Bureau of Land and Waste Management Senior Engineer - Power Supply
S.C. Department of Health and Municipal Electric Authority of Georgia
Environmental Control Electronic Mail Distribution
2600 Bull Street
Columbia, SC 29201 Reece McAlister
Executive Secretary
Lee Foley Georgia Public Service Commission
Manager of Contracts Generation Electronic Mail Distribution
Oglethorpe Power Corporation
Electronic Mail Distribution Office of the Attorney General
40 Capitol Square, SW
Mark Williams Atlanta, GA 30334
Commissioner
Georgia Department of Natural Resources Office of the County Commissioner
Electronic Mail Distribution Burke County Commission
Electronic Mail Distribution
F. Allen Barnes
Director Director
Environmental Protection Division Consumers' Utility Counsel Division
Georgia Department of Natural Resources Governor's Office of Consumer Affairs
Electronic Mail Distribution 2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Cynthia A. Sanders Atlanta, GA 30334-4600
Radioactive Materials Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
(cc contd - See page 6)
SNC 6
(cc contd)
Amy Whaley
Engineer
Nuclear Generation Development and Construction
Electronic Mail Distribution
Southern Nuclear Operations Company, Inc
ATTN: Mr. Richard D. Brigdon
Plant Training and
Emergency Preparedness Manager
Vogtle Electric Generating Plant
7821 River Road
Bin 63030
Waynesboro, GA 30830-2965