ML112971553

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 50-424/12-301 and 50-425/12-301
ML112971553
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/21/2011
From: Bruno Caballero
Operations Branch III
To: Tynan T
Southern Nuclear Operating Co
References
50-424/12-301, 50-425/12/301
Download: ML112971553 (7)


See also: IR 05000424/2012301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

October 21, 2011

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION

05000424/2012301 AND 05000425/2012301

Dear Mr. Tynan:

In a telephone conversation on October 12, 2011, between Mr. Greg Wainwright, Operations

Training Instructor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were made

for the administration of licensing examinations at Vogtle. The operating test is scheduled to be

administered during the weeks of March 26, 2012, April 9, 2012; and April 16, 2012. The written

examination is scheduled to be administered either the week of April 16, 2012, or the week of

April 23, 2012, depending on the need for the third week of the operating test. The on-site

preparatory week is scheduled for the week of March 5, 2012.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by December 12, 2011. Mr. Mark Bates provided the written examination outline to your

staff in June, 2011. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by January 17, 2012. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outline, examination, and test

before they are submitted to the NRC for review and approval. All materials shall be complete

and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

SNC 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on February

28, 2013. The public reporting burden for this collection of information is estimated to average

500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining

the data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Wainwright has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Michael Meeks at (404) 997-4467,

SNC 3

(Internet E-mail: Michael.Meeks@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail:

Mark.Bates@nrc.gov), or me at (404) 997-4608, (Internet E-mail: Bruno.Caballero@nrc.gov).

Sincerely,

/RA/

Bruno L. Caballero, Acting Chief

Operations Branch 1

Division of Reactor Safety

Docket No.: 50-424, 50-425

License No.: NPF-68, NPF-81

cc: See Page 4

_ML112971553______________ XG SUNSI REVIEW COMPLETE x FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRS

SIGNATURE RA RA RA

NAME MEEKS BATES CABALLERO

DATE 10/ 21/2011 10/21/2011 10/21/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 4

cc w/encl: B. D. McKinney, Jr.

S. Kuczynski Regulatory Response Manager

Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

T. D. Honeycutt

Jeffrey T. Gasser Regulatory Response Supervisor

Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

L. P. Hill

N. J. Stringfellow Licensing Supervisor

Licensing Manager Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

R. L. Gladney

Paula Marino Licensing Engineer

Vice President Southern Nuclear Operating Company, Inc.

Engineering Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. L. Crumpton

Administrative Assistant, Sr.

L. Mike Stinson Southern Nuclear Operating Company, Inc.

Vice President Electronic Mail Distribution

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Company, Inc. Hickox, T. Mark

Electronic Mail Distribution Vogtle Electric Generating Plant

Electronic Mail Distribution

Dennis R. Madison

Vice President S. C. Swanson

Edwin I. Hatch Nuclear Plant Site Support Manager

Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant

Electronic Mail Distribution Electronic Mail Distribution

J. L. Pemberton Senior Resident Inspector

SVP & General Counsel-Ops & SNC U.S. Nuclear Regulatory Commission

Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant

Electronic Mail Distribution 7821 River Road

Waynesboro, GA 30830

T. E. Tynan

Site Vice President Bob Masse

Vogtle Electric Generating Plant Resident Manager

Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant

Electronic Mail Distribution Oglethorpe Power Corporation

Electronic Mail Distribution

M. J. Ajluni

Nuclear Licensing Director

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

(cc contd - See page 5)

SNC 5

(cc contd) James A. Capp

Arthur H. Domby, Esq. Program Coordination Branch Chief

Troutman Sanders Environmental Protection Division

Electronic Mail Distribution Georgia Department of Natural Resources

Electronic Mail Distribution

Sandra Threatt, Manager

Nuclear Response and Emergency James C. Hardeman

Environmental Surveillance Environmental Radiation Program Manager

Bureau of Land and Waste Management Environmental Protection Division

Department of Health and Environmental Georgia Department of Natural Resources

Control Electronic Mail Distribution

Electronic Mail Distribution

Al Frazier

Division of Radiological Health Emergency Response and Radiation

TN Dept. of Environment & Conservation Program Manager

401 Church Street Environmental Protection Division

Nashville, TN 37243-1532 Georgia Department of Natural Resources

Electronic Mail Distribution

Richard Haynes

Director, Division of Waste Management Mr. Steven M. Jackson

Bureau of Land and Waste Management Senior Engineer - Power Supply

S.C. Department of Health and Municipal Electric Authority of Georgia

Environmental Control Electronic Mail Distribution

2600 Bull Street

Columbia, SC 29201 Reece McAlister

Executive Secretary

Lee Foley Georgia Public Service Commission

Manager of Contracts Generation Electronic Mail Distribution

Oglethorpe Power Corporation

Electronic Mail Distribution Office of the Attorney General

40 Capitol Square, SW

Mark Williams Atlanta, GA 30334

Commissioner

Georgia Department of Natural Resources Office of the County Commissioner

Electronic Mail Distribution Burke County Commission

Electronic Mail Distribution

F. Allen Barnes

Director Director

Environmental Protection Division Consumers' Utility Counsel Division

Georgia Department of Natural Resources Governor's Office of Consumer Affairs

Electronic Mail Distribution 2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Cynthia A. Sanders Atlanta, GA 30334-4600

Radioactive Materials Program Manager

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

(cc contd - See page 6)

SNC 6

(cc contd)

Amy Whaley

Engineer

Nuclear Generation Development and Construction

Electronic Mail Distribution

Southern Nuclear Operations Company, Inc

ATTN: Mr. Richard D. Brigdon

Plant Training and

Emergency Preparedness Manager

Vogtle Electric Generating Plant

7821 River Road

Bin 63030

Waynesboro, GA 30830-2965