ML13227A102

From kanterella
Revision as of 14:41, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Facility Comments on Draft NRC-Developed Exam (Operating) (Folder 2)
ML13227A102
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/12/2013
From: Todd Fish
Operations Branch I
To:
Public Service Enterprise Group
Jackson D
Shared Package
ML13077A118 List:
References
TAC U01872
Download: ML13227A102 (1)


Text

HC Comments on NRC-Developed Operating Test Section A RO Admin A-3: changed critical task to not include check valve bypass valve.

SRO Admin A-3: changed critical task to not include check valve bypass valve.

SRO A-2: modified system lineup sheet to reflect current plant lineup SRO A-4: modified to require SRO applicants to assess tech spec implications.

Section B Sim JPM S-3: enhanced termination criteria.

Sim JPM S-4: modified RHR flow rate value in script to match sim reading Sim JPM S-4: enhanced termination criteria Sim JPM S-5: added time requirement to critical step Section C Scenario #1: added critical task to script (open additional SRV)

Scenario #1: added BPV jack failure to script Scenario #2: enhanced critical task to match recent licensee change Scenario #2: removed incorrect script actions Scenario #3: updated scenario summary to reflect script Scenario #3: updated "Restore Water Level" critical task with specific water level band Scenario #3: enhanced clarity of RPV-ED critical task description