ML13354B850

From kanterella
Revision as of 09:59, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2013, Dresden Initial License Exam, as Administered Admin JPMs
ML13354B850
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/02/2013
From: Walton R
Operations Branch III
To:
Walton R
Shared Package
ML11355A018 List:
References
Download: ML13354B850 (74)


Text

Exelon Nuclear Job Performance Measure DETERMINE GENERATOR OPERATING LIMITS JPM Number: A-N-1-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-1-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with Turbine load at 900 MW and Turbine Reactive load at 200 MVAR.

NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

DOCUMENT PREPARATION

1. Provide a clean copy of DOP 6400-08.

A-N-1-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
3. Unit 2 Generator voltage regulator in service in automatic.
4. Unit 2 Generator H 2 pressure is 59 psig.
5. TSO has requested Unit 2 raise MVARs to 350 MVAR.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOP 6400-08.

1. Maintain system parameters Verifies TSO request can within stability and operability be performed within limits curves for existing hydrogen of Figure 2 or 4.

pressure. _____ _____ _____

  • 2. Use AUTO VOLTAGE Places the AUTO ADJUST control switch to VOLTAGE ADJUST C/S to control system voltage within RAISE to raise MVAR to _____ _____ _____

the Target Voltage Schedule 350 MVAR.

& Voltage Range OR as directed by TSO.

CUE:

After MVARs adjusted, a local operator on rounds informs the control room that the pressure regulator malfunctioned and H 2 pressure is now 50 PSIG.

  • 3. Ensure loading on Unit 2 is Verifies that current within Figure 2, Dresden Unit conditions are not within 2 Generator Capability the limits of figure 2 or 4 Curves and Under Excitation and recommends lowering Limiter Settings, Regulator In MVARs to < 300 MVAR.

Service, AND/OR Figure 4, Dresden Unit 2 Generator Capability Curves (Expanded _____ _____ _____

View) Regulator In Service.

CUE:

If required, As SRO, ask the examinee where they should leave MVARs, and verify their response is within the capability curve limits (JPM COMPLETE)

4. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

_____ _____ _____

CUE:

Acknowledge report of task completion.

A-N-1-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT END JPM Stop Time:_________

A-N-1-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: Determine Generator Operating Limits Revision Number: 00 JPM Number: A-N-1-R Task Number and Title: 299L029, Conduct Shift Operations K/A Number and Importance: Generic 2.1.25 3.9/ 4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

DOP 6400-08, rev 30 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-1-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
3. Unit 2 Generator voltage regulator in service in automatic.
4. Unit 2 Generator H 2 pressure is 59 psig.
5. TSO has requested Unit 2 raise MVARs to 350 MVAR.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
2. Inform the Unit Supervisor when the task is complete.

A-N-1-R Page 8 of 8

Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 01 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.

A-N-1-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. None A-N-1-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. An event has occurred resulting in the following conditions:
  • Unit 2 is at 95% power.
  • The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.
  • Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
2. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of

  • 1. Determines the event is Determines the event is reportable per SAF 1.2 reportable per SAF 1.2, Plant Shutdown Required by Technical Specifications _____ _____ _____
  • 2. Determines the time limit to Determines the time limit report via ENS as soon as to report via ENS as practicable, and in all cases soon as practicable, and within four hour of initiating in all cases within four the shutdown that is required hour of initiating the by TS.

shutdown that is required by TS. _____ _____ _____

3. Determines if plant shutdown Determines a LER is is completed, submit a required to the NRC within Licensee Event Report to the 60 days of discovery of the NRC within 60 days of event if plant shutdown is _____ _____ _____

discovery of the event. completed.

4. Informs Shift Manager task is Examinee notifies the Shift complete. Manager.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-1-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: Reportability Determination Revision Number: 01 JPM Number: A-N-1-S Task Number and Title: 299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: Generic 2.1.10 2.7 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

Reportability Manual LS-AA-1110, rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-1-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. An event has occurred resulting in the following conditions:
  • Unit 2 is at 95% power.
  • The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.
  • Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
2. Inform the Shift Manager when the task is complete.

A-N-1-S Page 7 of 7

Exelon Nuclear Job Performance Measure DETERMINE HEAT STRESS ACTIONS JPM Number: A-N-2-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-2-R Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a clean copy of SA-AA-111 A-N-2-R Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The following conditions exist in the Drywell where work is being performed:
  • Dry Bulb Temperature is 110°F
  • Wet Bulb Globe Temperature (WBGT) is 101°F
  • Single PCs and scrubs are required
  • The work involves inspections and moderate climbing
  • The duration of the work will be 10 minutes
3. The WBGT in the area outside the Drywell bullpen is 78°F INITIATING CUE
1. The Unit Supervisor has directed you to complete attachment 4 of SA-AA-111 for the work to be performed in the Drywell.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

A-N-2-R Page 4 of 9

Job Performance Measure (JPM)

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-R Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of

1. Record the dry bulb From initial conditions, dry temperature bulb temp is 110°F.

_____ _____ _____

2. Record the Wet Bulb Globe From initial conditions, Temperature (WBGT) WBGT temp is 101°F.

_____ _____ _____

  • 3. Classify the work Determines the environment (HT, VHT, EHT) environment is HT based on an action time being calculated. _____ _____ _____
4. Record the metabolic rate Determines the metabolic (Low, Moderate, High) rate is moderate per attachment 2. _____ _____ _____
5. Record the clothing ensemble From initial conditions, Single PCs and scrubs are required. _____ _____ _____
  • 6. Record the Action Time Determines the action time is 20 minutes from per attachment 3. _____ _____ _____
7. Record Check Time Determines the check time Frequency frequency to be 5-10 min.

_____ _____ _____

8. Record the Maximum Determines Maximum Extended Action Time Extended Action Time is 30 min. _____ _____ _____
  • 9. Record the Recovery Time Calculates the Recovery time is 30 min.

_____ _____ _____

10. Record the Cool Area Determines that the area location outside the Drywell Bullpen meets the requirements for _____ _____ _____

a cool area.

A-N-2-R Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

11. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-2-R Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: Determine Heat Stress Actions Revision Number: 00 JPM Number: A-N-2-R Task Number and Title: 299l029, Conduct Shift Operations.

K/A Number and Importance: Generic.

Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

procedure, rev ##

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-R Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The following conditions exist in the Drywell where work is being performed:
  • Dry Bulb Temperature is 110°F
  • Wet Bulb Globe Temperature (WBGT) is 101°F
  • Single PCs and scrubs are required
  • The work involves inspections and moderate climbing
  • The duration of the work will be 10 minutes
3. The WBGT in the area outside the Drywell bullpen is 78°F INITIATING CUE
1. The Unit Supervisor has directed you to complete attachment 4 of SA-AA-111 for the work to be performed in the Drywell.
2. Inform the Unit Supervisor when the task is complete.

A-N-2-R Page 9 of 9

Exelon Nuclear Job Performance Measure AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A-N-2-S Revision Number: 01 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.

A-N-2-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Clean copy of LS-AA-119.

A-N-2-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 10/21/13 @ 0600
4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1300.
6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith.
9. Steve is ready and willing to work the overtime and will work until 1300.
10. Steve is NOT fatigued and IS mentally alert.
11. Steves Employee ID# is: 987654.
12. Safety-related work WILL be performed by Steve during the shift.
13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13.
14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:

Tue Wed Thu Fri Sat Sun Mon Shift 10/15/13 10/16/13 10/17/13 10/18/13 10/19/13 10/20/13 10/21/13 1 (2300-0700) 8 8 8 8 8 8 8 2 (0700-1500) 4 4 4 3 (1500-2300)

INITIATING CUE

1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
2. The Operations Director will complete sections 2 - 4 of LS-AA-119.

A-N-2-S Page 4 of 8

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-S Page 5 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of LS-AA-119.

  • 1. Reviews procedure to Determines that overtime determine what limits will be would exceed:

exceeded.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 days.

_____ _____ _____

  • 2. Properly fills out Attachment Critical areas are:

1, Section 1 - Request portion. Planned Waiver Start:

10/21/13 / 1100 Planned Waiver End:

10/21/13 / 1300 Planned Waiver Duration:

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

> 72 in any 7 days.

checked Submitted by: name, signature, date, and time. _____ _____ _____

3. Forwards paperwork to the Forwards paperwork to the Operations Director. Operations Director or designee. _____ _____ _____

END JPM Stop Time:_________

A-N-2-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS Revision Number: 01 JPM Number: A-N-2-S Task Number and Title: 299L057, Perform administrative duties to ensure overtime restrictions are not exceeded.

K/A Number and Importance: Generic.1.5 2.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

LS-AA-119, rev 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 10/21/13 @ 0600
4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1300.
6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith.
9. Steve is ready and willing to work the overtime and will work until 1300.
10. Steve is NOT fatigued and IS mentally alert.
11. Steves Employee ID# is: 987654.
12. Safety-related work WILL be performed by Steve during the shift.
13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13.
14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:

Tue Wed Thu Fri Sat Sun Mon Shift 10/15/13 10/16/13 10/17/13 10/18/13 10/19/13 10/20/13 10/21/13 1 (2300-0700) 8 8 8 8 8 8 8 2 (0700-1500) 4 4 4 3 (1500-2300)

INITIATING CUE

1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
2. The Operations Director will complete sections 2 - 4 of LS-AA-119.

A-N-2-S Page 8 of 8

Exelon Nuclear Job Performance Measure PERFORM APRM FLOW BIAS CALIBRATION CHECK JPM Number: A-N-3-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-3-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a clean copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 A-N-3-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 is at full power.
3. The plant process computer is currently unavailable.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0500-26, APRM FLOW BIAS CALIBRATION CHECK.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 CUE:

When the examinee states they will check FI 2-260-5A(B) and RBM 7/8 provide them with the appropriate supplied picture.

  • 1. IF the process computer is Determines that A and B NOT available, THEN obtain recirc pump flows are 16 recirc pump flow for each Mlbm/hr and calculated loop from 2 A(B) PP FLOW, total drive flow is 32 FI 2-260-5A(B) AND calculate Mlbm/hr.

Total Drive Flow _____ _____ _____

2. Record Rated Drive Flow Enters 32.89 Mlbm/hr from (WD RATED ) from the CRSP the CRSP Unit Status Unit Status sheet sheet. _____ _____ _____
  • 3. Calculate Drive Flow (%) Calculates drive flow percentage to be 97.29%

_____ _____ _____

4. Record the percent FLOW Determines percent FLOW

(%) indicated on RBM CH 7 on RBM CH 7 RPS CH A RPS CH A, at Panel 902(3)- is 97%

37 _____ _____ _____

5. Record the percent FLOW Determines percent FLOW

(%) indicated on RBM CH 8 on RBM CH 8 RPS CH B RPS CH B, at Panel 902(3)- is 97%

37 _____ _____ _____

  • 6. Verify the values recorded in Using Operator aid, Steps 4 AND 5 are LESS Determines values are THAN OR EQUAL TO the greater than Desired Desired Setting per Operator Settings.

Aid Unit 2(3) APRM/RBM Flow Converter Setting vs. Acceptance criteria not Total Drive Flow, for WD% met.

value calculated in Step 3 _____ _____ _____

A-N-3-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

7. Contact the QNE AND IMD to States that the QNE AND perform DIS 0700-02, IMD would be contacted to APRM/RBM Flow perform APRM/RBM Flow Instrumentation Total Drive Instrumentation Total Drive Flow Adjustment Flow Adjustment

_____ _____ _____

8. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: APRM Flow Bias Calibration Check Revision Number: 00 JPM Number: A-N-3-R Task Number and Title: 215L0007, Perform Unit 2(3) power range monitoring system surveillance K/A Number and Importance: Generic 2.2.14 3.9 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

DOS 0500-26, rev 00; Operator Aid #74, rev 09 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 is at full power.
3. The plant process computer is currently unavailable.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0500-26, APRM FLOW BIAS CALIBRATION CHECK.
2. Inform the Unit Supervisor when the task is complete.

A-N-3-R Page 8 of 8

Exelon Nuclear Job Performance Measure DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number: A-N-3-S Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-3-S Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-01 A-N-3-S Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-S Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOS 6600-01 NOTE:

Other unidentified errors exist. Only items marked as critical are required.

  • 1. Verify D/G has operated for Recognizes that the diesel

> 60 minutes with a load of ran for less than 60 2340 to 2600 kW minutes. Acceptance criteria not met. _____ _____ _____

  • 2. Diesel fuel oil day tank level > Recognizes that Diesel 29.5 inches (for U2 or U3 fuel oil day tank level is EDG) less than 29.5 inches Acceptance criteria not _____ _____ _____

met.

  • 3. Verify D/G START AIR A1/A2 Recognizes that A1/A2 RECEIVER TANK pressure in RECEIVER TANK Step 3.a.(16) is greater than pressure is not greater D/G START AIR B1/B2 than B1/B2 RECEIVER RECEIVER TANK in Step TANK pressure.

3.a.(16) Acceptance criteria not _____ _____ _____

met.

4. IF air pressure between Recognizes that an issue banks has equalized, THEN report needs to be initiate an Issue Report to generated to repair the repair check valve. check valve. _____ _____ _____
5. Verify A compressor stops Recognizes that the A between 245 and 260 psig. compressor stopped > 260 psig. _____ _____ _____
6. IF Compressor A OR "B" Recognizes that stop pressures are NOT compressor A did not stop within expected range (224 to within the expected range 260 psig), THEN contact the (265 psig), the System Plant Engineering System Engineer needs to be Manager AND initiate an contacted. _____ _____ _____

Issue Report.

A-N-3-S Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

7. Notify System Engineer that Notifies System Engineer A compressor did not stop at that A compressor did not the expected band. start at the expected band. _____ _____ _____
  • 8. Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and _____ _____ _____

determines the EDG is inoperable.

9. Informs Shift Manager task is Examinee notifies the Shift complete. Manager.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-S Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 00 JPM Number: A-N-3-S Task Number and Title: 264L009, Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOS 6600-01, rev 123 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-S Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG.

INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

A-N-3-S Page 8 of 8

Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 00 Date: 08/13 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-4-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a copy of DOA 0010-10 and DOA 0010-S1 A-N-4-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. Hazmat and rescue response are not required.
4. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
5. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOA 0010-10.

Provide the examinee with the supplied copy of DOA 0010-S1 when requested.

  • 1. Notify Coal City Fire From DOA 0010-S1 Protection District. (Refer to determines that 815-942-DOA 0010-S1, Key Phone 0336 is the number Numbers for DOA 0010 Block needed to contact the _____ _____ _____

Procedures.) CCFPD.

  • 2. Dial 815-942-0336 and Dials 815-942-0336 and communicate the details of communicates the location the fire. of the fire. _____ _____ _____

CUE:

If requested by the examinee, the TSO can not contact the Coal City Fire Department because they are currently dealing with grid instabilities.

3. Notifies TSO via direct line for Notifies the TSO from a major fire. control room phone using the TSO direct line button and provides call back _____ _____ _____

phone number.

4. Notify Security Shift Notifies the Security Shift Supervisor that outside fire Supervisor that the department will be CCFPD will be responding responding AND request to the Lift Station.

assistance in providing access to affected area if _____ _____ _____

necessary.

5. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-4-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job Title: RO JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 00 JPM Number: A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic 2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: minutes Actual Time Used: minutes

References:

DOA 0010-10, rev 18; DOA 0010-S1, rev 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. Hazmat and rescue response are not required.
4. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
5. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION.
2. Inform the Unit Supervisor when the task is complete.

A-N-4-R Page 7 of 7

Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 00 Date: 08/13 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified JPM for ILT 12-1 (2013-301) NRC Exam.

A-N-4-S Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
2. Markup a survey map for the Unit 3 RWCU Pump Room.
3. Clean copy of RP-AA-203.

A-N-4-S Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 4 of 10

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-S Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP-AA-203.

The following steps may be performed in any order.

1. Reviews Survey Maps to Reviews the survey maps determine area dose rates. and determines area dose rates to be 50 mr/hr for the first group of 2 valves and _____ _____ _____

160 mr/hr for the remaining valve.

NOTE:

The following calculations should be made:

2 valve clearance projected dose = 0.75 hr x 40 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem

  • 2. Calculates that the projected Determines the NLOs will dose that will be received for receive 30 mrem on the the task is 65 mrem. first 2 valves and 35 on the next valve. _____ _____ _____

CUE:

IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: None of the Non Licensed Operators have received permission to exceed any limits.

NOTE:

The following steps may be performed in any order.

  • 3. Determines that ALEX Alexs total daily dose on CAN NOT perform the job RWP 10004555 would be because he would exceed the 105 mrem.

80 mrem dose alarm on RWP _____ _____ _____

10004555.

A-N-4-S Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Determines that Dan Dans total Annual dose CAN NOT perform the job would be 2015 mrem.

because he would exceed the 2000 mrem Exelon Annual _____ _____ _____

limit.

  • 5. Determines that Mike CAN Mikes total RWP daily perform the job because no dose and Annual dose will

_____ _____ _____

limits will be exceeded. remain below the limits.

  • 6. Determines that Sue Alexs total daily dose on CAN NOT perform the job RWP 10004555 would be

_____ _____ _____

because she would exceed 110 mrem.

the 80 mrem dose alarm on RWP 10004555.

  • 7. Determines that Tom CAN Toms total RWP daily perform the job because no dose and Annual dose will limits will be exceeded. remain below the limits.

_____ _____ _____

END JPM Stop Time:_________

A-N-4-S Page 7 of 10

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: SELECT PERSONEL FOR RADIATION WORK Revision Number: 00 JPM Number: A-N-4-S Task Number and Title: 29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.4 3.2 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

RP-AA-203, rev 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-S Page 8 of 10

Job Performance Measure (JPM)

KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 10004555, and total Annual TEDE dose for each Operator.

Calculation:

2 valves clearance (at RWCU Aux Pump) projected dose = 0.75 hr x 40 mr/hr =

30mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr =

35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging DDE dose Annual TEDE Projected dose on Projected Annual TEDE Name received on RWP dose as of RWP 10004555 (including all dose from 10004555 today Midnight To Date for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

(40 + 65 =) (1550 + 65 =)

Alex 40 mrem 1550 mrem 105 mrem 1615 mrem (5 + 65 =) (1950 + 65 =)

Dan 5 mrem 1950 mrem 70 mrem 2015 mrem (0 + 65 =) (1920 + 65 =)

Mike 0 mrem 1920 mrem 65 mrem 1985 mrem (45 + 65 =) (1850 + 65 =)

Sue 45 mrem 1850 mrem 110 mrem 1915 mrem (10 + 65 =) (1750 + 65 =)

Tom 10 mrem 1750 mrem 75 mrem 1815 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.

A-N-4-S Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem

4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:
  • 45 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room.

DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 10 of 10

Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 02 Date: 08/13 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for ILT 12-1 (2013-301) NRC Exam.

A-N-5-S Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Two (2) marked up copies of EP-AA-113-F-02.
2. Blank copy of EP-AA-113.
3. Blank copy of EP-AA-113-F-03.

A-N-5-S Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

A-N-5-S Page 4 of 9

Job Performance Measure (JPM)

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-5-S Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee the provided copies of:

EP-AA-113-F-02, and EP-AA-113.

1. Applicant determines need for Emergency action is emergency action. needed per initiating cue.

_____ _____ _____

CUE:

If asked, Clay and Jax do NOT have any adverse reactions to KI.

2. Applicant recognizes per the Recognizes that initiating cue that authorization to take KI authorization to take KI must must also be completed.

also be completed prior to the _____ _____ _____

emergency workers entering the space.

  • 3. Determines there is or has Determines KI must be been a Loss of Fuel Clad issued.

Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected _____ _____ _____

to have a high iodine concentration. Determines KI must be issued.

CUE:

When applicant determines KI must be issued, provide EP-AA-113-F-03 form and instruct applicant to complete form.

A-N-5-S Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Documents the decision to BOTH individuals being issue KI using THYROID authorized for KI and BLOCKING AGENT entering the space must be AUTHORIZATION Form listed with their correct (EP-AA-113-F-03). names and employee ID numbers:
  • Clay Morrow _____ _____ _____

123456

  • Jax Teller 891011 NOTE:

If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.

5. Notifies Occupational Health Examinee states that (Medical) Services he/she would notify OHS.

_____ _____ _____

Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.

NOTE:

JPM is complete when applicant notifies OHS of KI use.

END JPM Stop Time:_________

A-N-5-S Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job Title: SRO JPM Title: AUTHORIZE USE OF KI Revision Number: 02 JPM Number: A-N-5-S Task Number and Title: 29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.

K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

EP-AA-113-F-02, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 11 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-5-S Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

A-N-5-S Page 9 of 9