MONTHYEARML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000027/20242022024-09-13013 September 2024 Washington State University - U.S. NRC Security Inspection Report No.05000027/2024202 - Cover Letter IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 ML24150A3122024-08-29029 August 2024 Examination Report Letter No. 50-027/OL-24-01 Washington State University ML24150A3142024-08-29029 August 2024 Examination Result Letter No. 50-027/OL-24-01 Washington State University ML24242A2872024-08-29029 August 2024 Washington State University - 2024 Annual Report for the Wsu Nuclear Science Center IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000395/20240112024-06-26026 June 2024 – Comprehensive Engineering Team Inspection Report 05000395/2024011 ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24150A3812024-05-31031 May 2024 Examination Confirmation Letter No. 50-027 OL-24-01 Wsu 24-01 ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 IR 05000027/20242012024-05-0808 May 2024 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2024201 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 2024-09-26
[Table view] |
Text
Ronald A. Jones Vice President New Nuclear Operations July 9, 2014 NND-14-0393 ATTN: Document Control Desk 10 CFR 50.90 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Virgil C. Summer Nuclear Station (VCSNS) Units 2 & 3 Combined License Nos. NPF-93 and NPF-94 Docket Nos.52-027 & 52-028
Subject:
VCSNS Units 2&3 LAR 14-03S1: Supplement 1 to Request for License Amendment: Tier 2* Editorial and Consistency Changes
References:
- 1. LAR 14-03 Request for License Amendment: Tier 2* Editorial and Consistency Changes, Dated June 12, 2014 (Accession Number ML14164A098)
In accordance with 10 CFR 50.90, South Carolina Electric & Gas Company (SCE&G),
the Licensee for Virgil C. Summer Nuclear Station Units 2&3, requested an amendment to combined operating license (COL) numbers NPF-93 and NPF-94 for VCSNS Units 2&3, respectively, in Reference 1. The requested amendment proposed editorial and consistency changes within Tier 2* information contained in the Updated Final Safety Analysis Report (UFSAR).
On July 3, 2014 SCE&G became aware that Reference 1 misquoted the UFSAR in Licensing Basis Proposed Changes - Public (LAR 14-03) of Reference 1 by omitting a small portion of the text. This misquote occurred on page 3 of Enclosure 2 in the section titled UFSAR Subsection 3H.3.1, Governing Codes and Standards: in which the title of American Concrete Institute standard ACI 349-01 was being corrected in the UFSAR to align with the actual title of the standard.
To correct this issue, SCE&G submits Enclosure 4 of this letter which revises page 3 of to include the UFSAR text that was omitted in Reference 1.
The information provided in Enclosure 4 of this letter does not change the scope of, nor affect the Technical Evaluation or the conclusions of the Significant Hazards Consideration determination of the LAR provided in Reference 1. In addition, it does not alter the initial requested approval date.
SCE&G New Nuclear Deployment P. O. Box 88 MC 800 Jenkinsville, South Carolina 29065 www.sceg.com
Document Control Desk NND-14-0393 Page 2 of 3 In accordance with 10 CFR 50.91, SCE&G is notifying the State of South Carolina of this LAR supplement by transmitting a copy of this letter and its enclosure to the designated state official.
Should you have any questions about this letter, please contact April R. Rice, Manager, Nuclear Licensing, by telephone at (803) 941-9858, or by email at arice@scana.com.
This letter contains no regulatory commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on this ~~ay of -)IiiM!I~__ ' 2014.
DKiRAJ/dk : Supplemental Information Regarding Request for License Amendment 14-03: Tier 2* Editorial and Consistency Changes (LAR 14-03S1) c: Victor McCree Denise McGovern Ravindra Joshi David Jaffe Rahsean Jackson Jim Reece Stephen A. Byrne Jeffrey B. Archie Ronald A. Jones Justin Bouknight April Rice Dean Kersey Matt Kunkle Neil Haggerty Amy G. Aughtman
Document Control Desk NND-14-0393 Page 3 of 3 Margaret Felkel Cynthia Lanier Rhonda OBanion Christopher Levesque Joel Hjelseth Daniel Churchman Brian McIntyre William Hutchins Brian Bedford Tom Geer Michael Frankle Ken Hollenbach Alvis J. Bynum Marion Cherry Kathryn M. Sutton Curtis Castell Chuck Baucom AJ Marciano Sean Burk Susan E. Jenkins VCSummer2&3ProjectMail@cbi.com vcsummer2&3project@westinghouse.com DCRM-EDMS@SCANA.COM VCSNNDCorrespondence@scana.com
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Units 2&3 NND-14-0393 Enclosure 4 (Enclosures 1-3 provided previously in Reference 1)
Supplemental Information Regarding Request for License Amendment 14-03:
Tier 2* Editorial and Consistency Changes (LAR 14-03S1)
NND-14-0393 Licensing Basis Proposed Changes - Public (LAR 14-03S1) hatch, and the access opening to the annex building. The electrical penetration area, trip switchgears, and other electrical equipment motor control centers occupy most of the floor at elevation 117-6. The floor at elevation 135-3 is used for the storage of main control room air cylinders and provides access to the annex building. The roof for these areas is at elevation 160-6.
Areas 5 and 6 include facilities for storage and handling of new and spent fuel. The spent fuel pool, fuel transfer canal, and cask loading and cask washdown pits have concrete walls and floors. They are lined on the inside surface with stainless steel plate for leak prevention.
The Interior structural walls and major floors are constructed using concrete filled steel plate modules, steel form modules, or reinforced concrete. The new fuel storage area is a separate reinforced concrete pit providing temporary dry storage for the new fuel assemblies. A 150-ton cask handling crane travels in the east-west direction. The location and travel of this crane prevents the crane from carrying loads over the spent fuel pool to preclude them from falling into the spent fuel pool. Mechanical equipment is also located in this area for spent fuel cooling, residual heat removal, and liquid waste processing. This equipment is generally nonsafety-related.]*
UFSAR Subsection 3H.3.1, Governing Codes and Standards:
Revise Tier 2* information, as shown below:
- ACI 349-01, "Code Requirements for Nuclear Safety- Related Concrete Structures Structure Steel" (refer to subsection 3.8.4.5 for supplementary requirements and subsection 3.8.4.4.1 for alternative requirements).
UFSAR Subsection 3H.5.2, Composite Structures (Floors and Roof):
Revise Tier 2* information, as shown below:
- The concrete slab and the steel reinforcement of the composite section are evaluated for normal and extreme environmental conditions. The slab concrete and the reinforcement is designed to meet the requirements of American Concrete Institute standard ACI 349-01 "Code Requirements for Nuclear Safety- Related Concrete Structures."
Page 2 of 2