|
---|
Category:Memoranda
MONTHYEARML17013A1462018-08-29029 August 2018 Audit Summary to Review KHNP APR1400 Non-LOCA Chapter 15, Transient and Accident Analyses - Memo ML18158A3422018-08-15015 August 2018 KHNP Environmental Assessment: APR1400 Design Certification (Rin 3150-AJ67; NRC-2015-0225 ML18150A6472018-06-11011 June 2018 APR1400, Supplementary Information for Safety Evaluation with No Open Items for Chapter 14.3, Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) - Memorandum ML18156A0462018-06-0505 June 2018 APR1400 Topical Report Safety Evaluation, Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 - Memorandum to ACRS ML18149A5502018-05-31031 May 2018 APR1400 Chapter 14.3.2, Structural and Systems Engineering - ITAAC, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18147A0032018-05-31031 May 2018 APR1400 Chapter 13, Conduct of Operations, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML17188A3032018-05-21021 May 2018 APR1400 Chapter 6, Engineered Safety Features, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18054A6862018-05-20020 May 2018 APR1400 Chapter 14.3, Verification Programs, Safety Evaluation Report with Open Items - Memorandum to ACRS Memo ML18128A2992018-05-0808 May 2018 APR1400 Chapter 17, Quality Assurance and Reliability Assurance, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18128A1112018-05-0808 May 2018 APR1400 Chapter 19, Section 19.0 and Section 19.1, Probabilistic Risk Assessment and Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18122A2242018-05-0808 May 2018 APR1400 Chapter 19, Section 19.2, Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18073A2552018-03-26026 March 2018 Summary of March 14, 2018 Public Meeting with KHNP to Discuss Human Factors Engineering ML18068A1292018-03-26026 March 2018 March 7, 2018 Summary of Public Meeting with KHNP to Discuss Proposed ITAAC for the APR1400 ML17265A2692018-03-23023 March 2018 Transmittal Memo to ACRS of the LBLOCA Safety Evaluation for KHNP Topical Report APR1400-F-A-TR-1200A-P, Realistic Evaluation Methodology for Large-Break Loss of Coolant Accident of the APR1400. ML18017A2422018-03-20020 March 2018 Chapter_3_Phase_4_Memorandum ML18074A0322018-03-19019 March 2018 APR1400 P4 Chapter 7 ACRS ML17269A3152018-03-19019 March 2018 Transmittal Memo to ACRS of the Chapter 15 Phase 4 Safety Evaluation Report Transient and Accident Analyses, APR1400 Design Certification ML17166A1142018-02-23023 February 2018 APR1400 Chapter 2 Phase 4 - Section 2.5 - Memo to ACRS ML18012A6282018-01-26026 January 2018 Chapter_9_Phase_4_Memorandum ML17243A2462018-01-26026 January 2018 Memo Advanced Power Reactor 1400 Design Certification Application - Safety Evaluation with No Open Items for Section 19.4, Loss of Large Areas of the Plant Due to Explosions or Fire ML17271A0982018-01-26026 January 2018 APR1400 P4 Chapter 19.3 ACRS Memo ML17276A0342018-01-26026 January 2018 Memo for Transmittal to ACRS the Phase 4 Chapter 19.5, Aircraft Impact Assessment Safety Evacuation Report for the APR1400 Design Certification ML17276B5182017-12-28028 December 2017 APR1400 P4 Chapter 18 ACRS Memo ML17188A3152017-12-28028 December 2017 APR1400 Chapter 16 Phase 4 ACRS Memorandum ML17324B2882017-12-28028 December 2017 APR1400 P4 Chapter 14.1-14.2 ACRS Memo ML17334A1042017-12-27027 December 2017 APR1400 Chapter 4 Phase 4 Memorandum ML17132A2862017-12-26026 December 2017 Audit Report of Structural and Seismic Design Supporting Chapter 3, Design of Structures, Systems, Components, and Equipment, of the Advanced Power Reactor 1400 Design Control Document ML17058A3932017-03-17017 March 2017 APR1400 Chapter 14, Phase 3, ACRS Memo ML16300A1842016-12-0707 December 2016 Memorandum - Audit Summary for the Korea Hydro and Nuclear Power Co. Ltd Advanced Power Reactor 1400 Electric Power System ML16211A3512016-08-0404 August 2016 Supplemental Safety Evaluation Report for Topical Report APR1400-K-Q-TR-11005-NP, Revision 5, Knhp Quality Assurance Program Description for the APR1400 Design Certification. 2018-08-29
[Table view] |
Text
June 11, 2018 MEMORANDUM TO: Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Anna H. Bradford, Deputy Director /RA/
Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SUPPLEMENTARY INFORMATION FOR SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 14.3, INSPECTIONS, TESTS, ANALYSES AND ACCEPTANCE CRITERIA (ITAAC)
By letter dated December 23, 2014, Korea Electric Power Corporation and Korea Hydro &
Nuclear Power Co. (KHNP), Ltd., submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted Revision 1 to the APR1400 design certification application. On March 8, 2018, KHNP submitted a subsequent letter transmitting Revision 2 to the APR1400 design certification application.
Based on our review of the application, the staff provided the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items (OIs) for Section 14.3, Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC), in Chapter 14, Verification Programs, (Agencywide Documents Access and Management System (ADAMS) Accession Numbers ML18054A687 and ML18149A547). The SE with no OIs for Chapter 14, Section 14.3 contains references to other SER chapters for the ITAAC evaluations. The attached ITAAC Evaluation Cross Reference Table lists for each ITAAC table, the SER section(s) containing the evaluation of the ITAAC. For those SER sections not in Section 14.3, this table also includes the text in the referenced SER section. The text in these referenced sections have been updated from the Phase 4 versions of these chapters previously provided to the ACRS.
Therefore, this table is being provided to the ACRS as additional supplementary information to support the review of SER Section 14.3 on June 19, 2018.
The staff concludes that the table does not contain any information exempt from public disclosure. However, the U.S. Nuclear Regulatory Commission will withhold the table from public disclosure for ten business days to allow KHNP the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the table from public disclosure until the information has been released publicly in ADAMS.
CONTACTS: Cayetano Santos, NRO/DLSE 301-415-7270 William R. Ward, NRO/DLSE 301-415-7038
A. Veil The staff will inform the ACRS immediately if KHNP requests that any of the information in the table be withheld from public disclosure.
Docket No.: 52-046
Pkg: ML18150A645 Memo: ML18150A647 Ltr: ML18150A648 Table: ML18150A650 *via email NRO-002 OFFICE DLSE/LB2: PM DLSE/LB2: LA DLSE/LB2: PM DLES/LB2: BC DLSE: DD NAME CSantos (CLauron CSmith
- WWard MMcCoppin ABradford For)
DATE 06/07/2018 05/31/2018 06/07/2018 06/07/2018 06/11/2018