ML18150A647

From kanterella
Jump to navigation Jump to search
APR1400, Supplementary Information for Safety Evaluation with No Open Items for Chapter 14.3, Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) - Memorandum
ML18150A647
Person / Time
Site: 05200046
Issue date: 06/11/2018
From: Anna Bradford
NRC/NRO/DNRL
To: Andrea Veil
Advisory Committee on Reactor Safeguards
Santos C / 415-7270
Shared Package
ML18150A645 List:
References
Download: ML18150A647 (3)


Text

June 11, 2018 MEMORANDUM TO: Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Anna H. Bradford, Deputy Director /RA/

Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SUPPLEMENTARY INFORMATION FOR SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 14.3, INSPECTIONS, TESTS, ANALYSES AND ACCEPTANCE CRITERIA (ITAAC)

By letter dated December 23, 2014, Korea Electric Power Corporation and Korea Hydro &

Nuclear Power Co. (KHNP), Ltd., submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted Revision 1 to the APR1400 design certification application. On March 8, 2018, KHNP submitted a subsequent letter transmitting Revision 2 to the APR1400 design certification application.

Based on our review of the application, the staff provided the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items (OIs) for Section 14.3, Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC), in Chapter 14, Verification Programs, (Agencywide Documents Access and Management System (ADAMS) Accession Numbers ML18054A687 and ML18149A547). The SE with no OIs for Chapter 14, Section 14.3 contains references to other SER chapters for the ITAAC evaluations. The attached ITAAC Evaluation Cross Reference Table lists for each ITAAC table, the SER section(s) containing the evaluation of the ITAAC. For those SER sections not in Section 14.3, this table also includes the text in the referenced SER section. The text in these referenced sections have been updated from the Phase 4 versions of these chapters previously provided to the ACRS.

Therefore, this table is being provided to the ACRS as additional supplementary information to support the review of SER Section 14.3 on June 19, 2018.

The staff concludes that the table does not contain any information exempt from public disclosure. However, the U.S. Nuclear Regulatory Commission will withhold the table from public disclosure for ten business days to allow KHNP the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the table from public disclosure until the information has been released publicly in ADAMS.

CONTACTS: Cayetano Santos, NRO/DLSE 301-415-7270 William R. Ward, NRO/DLSE 301-415-7038

A. Veil The staff will inform the ACRS immediately if KHNP requests that any of the information in the table be withheld from public disclosure.

Docket No.: 52-046

Pkg: ML18150A645 Memo: ML18150A647 Ltr: ML18150A648 Table: ML18150A650 *via email NRO-002 OFFICE DLSE/LB2: PM DLSE/LB2: LA DLSE/LB2: PM DLES/LB2: BC DLSE: DD NAME CSantos (CLauron CSmith

  • WWard MMcCoppin ABradford For)

DATE 06/07/2018 05/31/2018 06/07/2018 06/07/2018 06/11/2018