Letter Sequence Approval |
---|
EPID:L-2017-LLA-0387, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24295A3742024-10-23023 October 2024 Project Manager Assignment ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection LR-N24-0048, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement 2024-09-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22194A8172022-08-10010 August 2022 Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System ML21348A7132022-03-14014 March 2022 Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink ML22056A0102022-03-0404 March 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Correction Letter of Amendment Nos. 230, 342, and 323 Deletion of Specified Definitions and Figures ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML21341B4262021-12-0808 December 2021 Correction Letter of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part 21 Safety Communication SC05-03 ML21181A0562021-08-17017 August 2021 Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary) ML21098A0872021-04-26026 April 2021 Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19289A8862019-11-0707 November 2019 Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance Requirement ML19218A3052019-09-19019 September 2019 Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPR ML19205A3062019-09-0606 September 2019 Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19073A0732019-04-30030 April 2019 Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel Generator ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML18260A2032018-10-30030 October 2018 Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) ML18081A0442018-04-11011 April 2018 Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio Change ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17324A8402017-12-14014 December 2017 Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204) ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17291A2092017-11-0808 November 2017 Issuance of Amendment Technical Specification Change for Permanent Extension to Type a and Type C Containment Leak Rate Test Frequencies (CAC No. MF8462; EPID L-2016-JLD-0011) ML17216A0222017-08-0404 August 2017 Nonproprietary Issuance of Amendment Regarding Digital Power Range Neutron Monitoring System Upgrade ML17164A3552017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML15286A0912015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler-522 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML14323A9742014-12-23023 December 2014 and Salem Nuclear Generating Station, Units 1 and 2, Issuance of Amendments Revision to Cyber Security Plan Implemenation Schedule and Conditions ML14108A3992014-12-18018 December 2014 Issuance of Amendment Request to Relocate Flood Protection Technical Specification to the Technical Requirements Manual ML14108A3122014-07-29029 July 2014 Issuance of Amendment Request to Relocate Safety Relief Valve Position Instrumentation to Technical Requirements Manual ML13114A0782013-06-26026 June 2013 Issuance of Amendment Request for Technical Specification Change to Average Power Range Monitoring System Operability Requirements in Operating Condition 5 ML12335A2212012-12-10010 December 2012 and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security Plan LR-N12-0107, License Amendment Request - APRM Operability Requirements in Opcon 52012-06-0606 June 2012 License Amendment Request - APRM Operability Requirements in Opcon 5 ML1201800782012-02-0808 February 2012 Issuance of Amendment 191 Control Room Emergency Filtration System and Control Room Air Conditioning System ML1123806182011-09-14014 September 2011 Issuance of Amendment Operation with Final Feedwater Temperature Reduction and Feedwater Heaters Out of Service 2024-07-15
[Table view] Category:Safety Evaluation
MONTHYEARML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22194A8172022-08-10010 August 2022 Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System ML22194A8402022-07-15015 July 2022 Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML22181A1252022-07-0505 July 2022 Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML21348A7132022-03-14014 March 2022 Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21181A0562021-08-17017 August 2021 Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary) ML21098A0872021-04-26026 April 2021 Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20091L9992020-04-13013 April 2020 Issuance of Relief Request HC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19289A8862019-11-0707 November 2019 Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance Requirement ML19218A3052019-09-19019 September 2019 Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPR ML19220A1022019-09-0606 September 2019 Alternative Request VR-03 to Use ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valve for the Fourth 10-Year Inservice Test Interval ML19205A3062019-09-0606 September 2019 Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19136A0262019-07-11011 July 2019 Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME Code ML19073A0732019-04-30030 April 2019 Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel Generator ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML18290A8762018-12-0606 December 2018 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4458; EPID No. L-2014-JLD-0040) ML18260A2032018-10-30030 October 2018 Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) ML18081A0442018-04-11011 April 2018 Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio Change ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17324A8402017-12-14014 December 2017 Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204) ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17321B1062017-11-28028 November 2017 Request to Use Later Edition of American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC No. MG0124; EPID L-2017-LLR-0087) ML17291A2092017-11-0808 November 2017 Issuance of Amendment Technical Specification Change for Permanent Extension to Type a and Type C Containment Leak Rate Test Frequencies (CAC No. MF8462; EPID L-2016-JLD-0011) ML17223A4832017-08-17017 August 2017 Relief from the Requirements of the ASME Code for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations ML17216A0222017-08-0404 August 2017 Nonproprietary Issuance of Amendment Regarding Digital Power Range Neutron Monitoring System Upgrade ML17125A2662017-06-30030 June 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17164A3552017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16343A0572016-12-20020 December 2016 Requests for Relief GR-01, PR-01, PR-02, VR-01, and VR-02, for the Fourth Inservice Testing Interval ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML16256A6552016-09-30030 September 2016 Hope Creek Generating Station - Request for Relaxation of the Release Point Height Requirement of NRC Order EA-13-109,Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML16259A2042016-09-20020 September 2016 Hope Creek Generating Station - Safety Evaluation - Request to revise technical specifications - safety limit minimum critical power ratio.(TAC NO. MF7793) 2024-07-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC -N09 Hope Creek Generating Station P.O. Box236 Hancocks Bridge, NJ 08038 April 11, 2018
SUBJECT:
HOPE CREEK GENERATING STATION -ISSUANCE OF AMENDMENT NO. 211 REGARDING SAFETY LIMIT MINIMUM CRITICAL POWER RATIO CHANGE (EPID L-2017-LLA-0387)
Dear Mr. Sena:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 211 to Renewed Facility Operating License No. NPF-57 for the Hope Creek Generating Station (HCGS). This amendment consists of changes to the Technical Specifications in response to your application dated November 9, 2017, as supplemented by letter dated January 22, 2018. The amendment incorporates a revised safety limit minimum critical power ratio for single recirculation loop operation and two recirculation loop operation.
The change results from a cycle-specific analysis performed to support the operation of HCGS in the upcoming Cycle 22. A copy of our related safety evaluation is also enclosed.
A Notice of Issuance will be included in the Commission's biweekly Federal Register notice. I\ Sincere! , Docket No. 50-354
Enclosures:
- 1. Amendment No. 211 to Renewed License No. NPF-57 2. Safety Evaluation cc: Listserv [ DI. Lisa M. Regner, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 PSEG NUCLEAR LLC DOCKET NO. 50-354 HOPE CREEK GENERATING STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 211 Renewed License No. NPF-57 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment filed by PSEG Nuclear LLC dated November 9, 2017, as supplemented by letter dated January 22, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-57 is hereby amended to read as follows: Enclosure 1 (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 211, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. 3. The license amendment is effective as of its date of issuance and shall be implemented prior to startup following the spring 2018 refueling outage.
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance:
April 11, 2018 FOR THE NUCLEAR REGULATORY COMMISSION Sl:: .. e.~ Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ATTACHMENT TO LICENSE AMENDMENT NO. 211 HOPE CREEK GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354 Replace the following page of the Renewed Facility Operating License with the revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change. Remove 3 Insert 3 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove 2-1 Insert 2-1 reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation.
(7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) (2) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 211, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Renewed License No. NPF-57 Amendment No. 211 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS THERMAL POWER, Low Pressure or Low Flow 2.1.1 THERMAL POWER shall not exceed 24% of RATED THERMAL POWER with the reactor vessel steam dome pressure less than 785 psig or core flow less than 10% of rated flow. APPLICABILITY:
OPERATIONAL CONDITIONS 1 and 2. ACTION: With THERMAL POWER exceeding 24% of RATED THERMAL POWER and the reactor vessel steam dome pressure less than 785 psig or core flow less than 10% of rated flow, be in at least HOT SHUTDOWN within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and comply with the requirements of Specification 6.7.1. THERMAL POWER, High Pressure and High Flow 2.1.2 With reactor steam dome pressure greater than 785 psig and core flow greater than 10% of rated flow: The MINIMUM CRITICAL POWER RATIO (MCPR) shall be~ 1.09 for two recirculation loop operation and shall be~ 1.12 for single recirculation loop operation.
APPLICABILITY:
OPERATIONAL CONDITIONS 1 and 2. ACTION: With reactor steam dome pressure greater than 785 psig and core flow greater than 10% of rated flow and the MCPR below the values for the fuel stated in LCO 2.1.2, be in at least HOT SHUTDOWN within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and comply with the requirements of Specification 6.7.1. REACTOR COOLANT SYSTEM PRESSURE 2.1.3 The reactor coolant system pressure, as measured in the reactor vessel steam dome, shall not exceed 1325 psig. APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, 3 and 4. ACTION: With the reactor coolant system pressure, as measured in the reactor vessel steam dome, above 1325 psig, be in at least HOT SHUTDOWN with reactor coolant system pressure less than or equal to 1325 psig within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and comply with the requirements of Specification 6.7.1. HOPE CREEK 2-1 Amendment No. 211 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 211 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-57 PSEG NUCLEAR LLC
1.0 INTRODUCTION
HOPE CREEK GENERATING STATION DOCKET NO. 50-354 By letter dated November 9, 2017, as supplemented by letter dated January 22, 2018 (Agencywide Document Access and Management System (ADAMS) Accession Nos. ML173176320 and ML18022A374, respectively), PSEG Nuclear LLC (PSEG, or the licensee) requested changes to the Hope Creek Generating Station (HCGS) Technical Specifications (TSs ). The requested changes would revise the safety limit minimum critical power ratio (SLMCPR) for single recirculation loop operation (SLO) and two recirculation loop operation (TLO). The proposed change results from a cycle-specific analysis performed to support the operation of HCGS in upcoming Cycle 22. The supplement dated January 22, 2018, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards determination as published in the Federal Register on February 6, 2018 (83 FR 5281).
2.0 REGULATORY EVALUATION
The U.S. Nuclear Regulatory Commission (NRC or the Commission) staff reviewed the proposed TS changes against the regulatory requirements and guidance listed below to ensure that there is reasonable assurance that the systems and components affected by the proposed TS changes will perform their safety functions.
2.1 Regulatory Requirements The NRC staff identified the following regulatory requirements as applicable to the proposed amendment.
2.1.1 Applicable TS Regulations The Commission's regulatory requirements related to the content of the TSs are set forth in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36, "Technical specifications." This regulation requires that the TSs include items in the following five specific categories:
Enclosure 2 (1) safety limits (Sls), limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls.
The regulation does not specify the particular requirements to be included in the plant TSs. As discussed in 10 CFR 50.36(c)(1
), Sls for nuclear reactors are limits upon important process variables that protect the integrity of certain physical barriers that guard against the uncontrolled release of radioactivity.
The fuel cladding is one of the physical barriers that separate radioactive materials from the environment.
The SLMCPR is included in the TSs to ensure that fuel design limits are not exceeded.
The SLMCPR limit is contained in HCGS TS 2.1.2, and the parameter on which it is based can vary from cycle to cycle. 2.1.2 General Design Criteria General Design Criterion (GDC) 10, "Reactor design," of Appendix A to 10 CFR Part 50 states that "[t]he reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences." The purpose of the SLMCPR is to ensure that specified acceptable fuel design limits (SAFDLs) are not exceeded during steady state operation and analyzed transients.
2.2 Regulatory Guidance Guidance for reviewers on the acceptability of the reactivity control systems, the reactor core, and the fuel system design is provided in NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP)." The SRP, Section 4.2, "Fuel System Design," Revision 3, March 2007 (ADAMS Accession No. ML070740002), specifies all fuel damage criteria for evaluation of whether fuel designs meet the SAFDLs. The SRP, Section 4.4, "Thermal and Hydraulic Design," Revision 2, March 2007 (ADAMS Accession No. ML070550060) provides guidance on the review of thermal-hydraulic design in meeting the requirement of GDC 10 and the fuel design criteria established in SRP Section 4.2. It states that the critical power ratio (CPR) is to be established such that at least 99.9 percent of fuel rods in the core would not be expected to experience departure from nucleate boiling or boiling transition during normal operation or anticipated operational occurrences.
2.3 Proposed Changes For Operating Cycle 22, the HCGS calculated SLMCPR would change from greater than or equal to (~) 1.11 to 1.12 for SLO and from 1.08 to 1.09 for TLO. Accordingly, the licensee proposes to revise HCGS TS 2.1.2 to read as follows (changes in bold): 2.1.2 With reactor steam dome pressure greater than 785 psig and core flow greater than 10% of rated flow: The MINIMUM CRITICAL POWER RATIO (MCPR) shall be~ 1.09 for two recirculation loop operation and shall be 1.12 for single recirculation loop operation. Proposed changes to the HCGS TS Bases were provided for information only. The TS Bases are controlled by TS Bases Control Program (HCGS TS 6.15), and any changes to the TS Bases will be made in accordance with the program. 3.0 3.1 TECHNICAL EVALUATION Background Fuel design limits can be exceeded if the core exceeds critical power. Critical power is a term used for the power at which the fuel departs from nucleate boiling and enters a transition to film boiling. For boiling-water reactors, the critical power is predicted using a correlation known as the General Electric (GE) critical quality boiling length correlation, better known as the GEXL correlation.
Due to core-wide and operational variations, the margin to boiling transition is most easily described in terms of a CPR, which is defined as the rod critical power, as calculated by GEXL, divided by the actual rod power. The greater a CPR value exceeds 1.0, the greater the margin is to boiling transition.
The SLMCPR is calculated using a statistical process that takes into account operating parameters and uncertainties.
The operating limit minimum critical power ratio (OLMCPR) is equal to the SLMCPR plus a CPR margin for transients.
At the OLMCPR, at least 99.9 percent of the rods avoid boiling transition during steady-state operation and transients caused by a single operator error or equipment malfunction.
The OLMCPR is required to be established and documented in the core operating limits report for each reload cycle. 3.2 Cycle 22 Core The absolute value of SLMCPR tends to vary cycle-to-cycle, typically due to the introduction of improved fuel bundle types, changes in fuel vendors or applicable computer codes, and changes in core loading pattern. Fresh fuel bundles generally dominate the SLMCPR calculation.
Following the determination of the cycle-specific SLMCPR values, the OLMCPR values are derived. This license amendment request supports the core design for the upcoming HCGS Cycle 22, which will start after the spring 2018 refueling outage. 3.3 Methodology Global Nuclear Fuel (GNF) performed the HCGS Cycle 22 SLMCPR calculation using the following NRG-approved methodologies and uncertainties:
- NED0-24011-A, Revision 24, "General Electric Standard Application for Reactor Fuel (GESTAR 11)," March 2017 (ADAMS Accession Nos. ML17075A322 and ML17075A323).
- NED0-32601-A, Revision 0, "Methodology and Uncertainties for Safety Limit MCPR Evaluations," August 1999 (ADAMS Accession No. ML14093A216).
- NEDC-32694-A, "Power Distribution Uncertainties for Safety Limit MCPR Evaluations," August 1999 ("Acceptance for Referencing of Licensing Topical Reports NEDC-32601 P, Methodology and Uncertainties for Safety Limit MCPR Evaluations; NEDC-32694P, Power Distribution Uncertainties for Safety Limit MCPR Evaluation; and Amendment 25 to NEDE-24011-P-A on Cycle-Specific Safety Limit MCPR," dated March 11, 1999 (ADAMS Accession No. ML993140059)).
- NED0-32505-A, Revision 1, "R-Factor Calculation Method for GE11, GE12 and GE13 Fuel," July 1999 (ADAMS Accession No. ML060520636).
These methodologies were used for the HCGS Cycle 21 and the Cycle 22 SLMCPR calculations.
The NRC staff reviewed the proposed change to ensure that the generic methods were appropriately applied to HCGS. The HCGS Cycle 22 core consists of 412 GNF2 and 352 GE14 legacy fuel assemblies.
No plant hardware or operational changes are required with this proposed change. The R-Factor is an input into the GEXL correlation used to describe the local pin-by-pin power distribution and the fuel assembly and channel geometry on the fuel assembly critical power. The R-Factor uncertainty analysis includes an allowance for power peaking modeling uncertainty, manufacturing uncertainty, and channel bow uncertainty.
The NED0-32505-A report is the generic R-Factor methodology report that describes the changed methodology that was adopted after part length rods were introduced.
The NRC staff's safety evaluation for NEDC-32505P-A (the proprietary version of NED0-32505-A) has a requirement that the applicability of the R-Factor methodology is confirmed when a new fuel type is introduced.
By letter dated March 14, 2017, GNF submitted FLN-2007-011, "GNF2 Advantage Generic Compliance with NEDE-24011 P-A (GESTAR II), NEDC-33270P, March 2007, and GEXL 17 Correlation for GNF2 Fuel, NEDC-33292P, March 2007" (ADAMS Accession No. ML070780335).
This letter confirmed that the R-factor methodology of NEDC-32505P-A is applicable to GNF2, and that all of the criteria defined in NEDE-24011-P-A have been met for the GNF2 fuel design. As part of an NRC audit related to this report, the GNF2 fuel design was verified to have been evaluated in accordance with the NRG-approved methodologies listed above. This was documented in an audit report dated September 25, 2008 (ADAMS Accession No. ML082690382).
The current cycle core design has produced similar results to the previous cycle core design. The change in the calculated SLMCPR can be attributed to cycle-to-cycle variation.
A key component of this variation is both the bundle-by-bundle MCPR distribution as well as the pin-by-pin power/R-Factor distribution.
The only effect the increase in power level has is a difference in the flow uncertainty, which decreases due to the increase in the minimum core flow. For the limiting TLO case, the current fresh fuel pin-by-pin power/R-Factor distribution is flatter than the previous cycle fresh fuel pin-by-pin power/R-Factor distribution while the core bundle-by-bundle MCPR distribution is slightly more peaked than the previous cycle. While the current cycle core bundle-by-bundle MCPR distribution is slightly more peaked, the change in the fresh fuel pin-by-pin power/R-Factor is more significant, thus the combination of the two distributions produces a flatter core power distribution.
The overall core power distribution flatness along with the cycle-to-cycle variation in the core loading tends to produce an increase in the calculated SLMCPR. The current cycle's change in the Monte Carlo SLO SLMCPR from the previous cycle is consistent with the Monte Carlo TLO SLMCPR change between the two cycles. The SLO values are greater than the TLO values as expected due to the increase in uncertainties used for the SLO case. On the basis of the analysis performed by GNF using the NRG-approved methodologies described above, the licensee has proposed to amend the HCGS TS Section 2.1.2 to revise the SLMCPR for the Operating Cycle 22. The information regarding requested changes to the HCGS TS SLMCPR is based on the core rated power of 3,902 megawatt, and at minimum core flow of 97.1 percent at rated power. For Cycle 22, the minimum core flow SLMCPR calculation performed at 97.1 percent core flow and rated core power condition was limiting as compared to the rated core flow and rated core power condition.
The current required SLMCPR values in HCGS TS are~ 1.08 for TLO and 1.11 for SLO. Calculations performed by GNF for HCGS Cycle 22 resulted in a minimum calculated value of SLMCPR to be~ 1.09 for TLO and 1.12 for SLO. GNF's calculation of the revised specific SLMCPR numeric values for HCGS Cycle 22 was performed as part of the reload licensing analysis for HCGS Cycle 22, and is based upon NRG-approved methods, therefore it is acceptable.
No departures from NRG-approved methodologies, or deviations from NRG-approved calculational uncertainties, were identified in the HCGS, Cycle 22, SLMCPR calculations.
All calculated uncertainties for HCGS, Cycle 22, SLMCPR calculations were conservative relative to NRG-approved values. The license amendment request dated November 9, 2017, was supplemented by letter dated January 22, 2018, in which the licensee stated that GE Hitachi Nuclear Energy determined that the GESAM02 engineering computer program used to calculate the SLMCPR contained an error in its pseudo-random number generator.
No change to the proposed HCGS Cycle 22 SLMCPR values were required due to this error. However, PSEG submitted a revised GNF Report as part of the January 22, 2018, letter. The NRC staff reviewed the revised calculation and the results provided in the supplement, and verified that the proposed SLMCPR values remain unchanged.
3.4 Technical Conclusion Based on the finding above, The NRC staff concludes that the proposed changes will continue to meet the applicable regulatory requirements and guidance, and that the analysis performed to calculate the HCGS Cycle 22 SLMCPR numeric values was based upon NRG-approved methodologies.
The NRC staff concludes that the new SLMCPR values for SLO and TLO will continue to provide assurance that 99.9 percent of the fuel rods in the core will not exceed the CPR, and that fuel cladding integrity will be maintained under conditions of normal operation and with appropriate margin for anticipated operational occurrences.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Jersey State Official was notified of the proposed issuance of the amendment on February 27, 2018. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 1 O CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (83 FR 5281). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:
Muhammad Razzaque, NRR Date: April 11, 2018.
SUBJECT:
HOPE CREEK GENERATING STATION -ISSUANCE OF AMENDMENT NO. 211 RE: SAFETY LIMIT MINIMUM CRITICAL POWER RATIO CHANGE (EPID L-2017-LLA-0387)
DATED APRIL 11, 2018. DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource PM File Copy RidsNrrDorlLpl1 Resource RidsRgn1 MailCenter Resource RidsNrrDssSrxb Resource RidsNrrPMHopeCreek Resource RidsNrrLAIBetts Resource MRazzaque, NRR ADAMS Accession No.: ML18081A044 OFFICE NRR/DORL/LPL 1/PM NAME LRegner DATE 4/6/2018 OFFICE OGC-NLO NAME JGillespie DATE 4/6/2018 NRR/DORL/LPL 1/LA I Betts 3/28/2018 NRR/DORL/LPL 1/BC JDanna 4/10/2018 OFFICIAL RECORD COPY NRR/DSS/SRXB/BC(A)
JWhitman 2/26/2018 NRR/DORL/LPL 1/PM LRegner 4/11/2018