05000440/FIN-2009003-02

From kanterella
Revision as of 20:37, 20 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
02
Site: Perry FirstEnergy icon.png
Report IR 05000440/2009003 Section 1R15
Date counted Jun 30, 2009 (2009Q2)
Type: Finding: Green
cornerstone Barrier Integrity
Identified by: Self-revealing
Inspection Procedure: IP 71111.15
Inspectors (proximate) M Wilk
M Marshfield
M Phalen
D Jones
M Franke
J Bashore
R Leidy
J Cameron
R Murray
C Tilton
J Coroju-Sandin
CCA H.5, Work Management
INPO aspect WP.1
'