Memo Ico Staff Review of Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 20 (Ns113989) for Verification of ASM Order EA-14-044 Implementation (Cac# L25130)
ML16252A204
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/09/2016
From: Tim Mossman
Division of Security Policy
To: Patricia Silva
NRC/NMSS/DSFM/IOB
Doug, Garner
References
CAC L25130, EA-14-044
Download: ML16252A204 (2)


Text

September 09, 2016

MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief

/RA/ Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM (EA-14-044) IMPLEMENTATION CAC NO. L25130)

The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016.

Based on our review, we find the submitted PSP to be acceptable and the Watts Bar Nuclear Plant has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the Additional Security Measures (ASMs) imposed by NRC Order EA-14-044.

A physical security inspection (IRs 05000390, 391/2016403 and 07201048/2016401) (ADAMS Accession No. ML16223A870) was completed on July 14, 2016 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staff's review, the Watts Bar PSP (Rev.20) has met the performance objectives and general requirements outlined in

10 CFR , Section 73.55 and the ASMs imposed by the NRC.

Docket Nos. 50-390, 72-1048 If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov

CONTACT: Doug Garner, NSIR/DSP 301-287-0929

September 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards

FROM: Timothy Mossman, Chief

/RA/ Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM (EA-14-044) IMPLEMENTATION CAC NO. L25130)

The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016.

Based on our review, we find the submitted PSP to be acceptable and the Watts Bar Nuclear Plant has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the Additional Security Measures (ASMs) imposed by NRC Order EA-14-044.

A physical security inspection (IRs 05000390, 391/2016403 and 07201048/2016401) (ADAMS

Accession No. ML16223A870) was completed on July 14, 2016 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staff's review, the Watts Bar PSP (Rev.20) has met the performance objectives and general requirements outlined in

10 CFR , Section 73.55 and the ASMs imposed by the NRC.

Docket Nos. 50-390, 72-1048

If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov

CONTACT: Doug Garner, NSIR/DSP

301-287-0929

DISTRIBUTION:

DSP r/f

ADAMS Accession No. ML16252A204 OFFICE DSP/MWSB MWSB/BC NAME D. Garner T. Mossman DATE 09/08/16 09/09/16