Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER One Cook Place Bridgman, MI 49106 A unit of American Electric Power India naMichiga nPower.com September 13, 2013 AEP-NRC-2013-80 10 CFR 26.719 Docket No. 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C 20555-0001 Donald C. Cook Nuclear Plant Unit 1 and Unit 2 REPORT OF DRUG AND ALCOHOL TESTING ERRORS IN ACCORDANCE WITH 10 CFR 26.719(C)(1)
In accordance with the criteria established by 10 CFR 26.719(c)(1), Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant Units 1 and 2, is submitting the following report regarding a rejection of a test results report provided by I&M's contracted vendor, South Bend Medical Foundation (SBMF).On August 14, 2013, SBMF received a urine specimen, Identification Number L868944, from I&M for testing. The individual who received and opened the leak-resistant bag containing the specimen failed to document in real time the condition of the specimen bottle seals (i.e. at the time of receipt)as required by SBMF protocol and the National Laboratory Certification Program (NLCP). Although scientifically valid test results were obtained and negative, failure to document the condition of the tamper seals requires the certifying laboratory to report the specimen as "Specimen Rejected: Tamper-evident seals were not verified as intact at time of receipt of specimen." Upon notification of the rejected specimen, I&M began an investigation and conducted a re-test (Specimen Identification Number L868958) of the same donor on August 16, 2013. The test results were negative.
SBMF Technical Director of Toxicology conducted an internal investigation with their toxicology staff confirming the rejected specimen and notified I&M of the results on August 19, 2013. By letter dated August 23, 2013, SBMF's Technical Director of Toxicology notified I&M of the summarized actions to be taken by SBMF Toxicology staff to prevent recurrence.
This letter from SBMF is included as the enclosure to this submittal.
This event was entered into I&M's Corrective Action Program. There are no commitments contained in this submittal.
A U.S. Nuclear Regulatory Commission AEP-NRC-2013-80 Page 2 Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely, Joel P. Gebbie Site Vice President RAW/amp Enclosure c: J. T. King -MPSC, w/o enclosure S. M. Krawec -AEP Ft. Wayne, w/o enclosure MDEQ -RMD/RPS, w/o enclosure NRC Resident Inspector C.D. Pederson -NRC Region III T.J. Wengart -NRC Washington DC Enclosure to AEP-NRC-2013-80 Letter dated August 23, 2013 RE: Corrective Actions Pursuant to the Matter of Specimen ID No.: L868944 1V I DEPARTMENT OF AW "FORENSIC TOXICOLOGY PRENTISS JONES, JR., Ph.D., D-ABFT 2Tox(coIgOlCO Chemist (NRCC)Techniral Direcicr SOUTH BEND MEDICAL FOUNDATION PAUL F. MOORMAN Technicai Manager 53(W North Li.rsyv~u lih tiCV;r1 SOIll1l BOW. I N 466111 10('N (574) 23,-1-176i
-(S011) 5.W-.9i.2.
August 23, 2013 Tammy Bond Cook Nuclear Plant One Cook Place Bridgman, MI 49106 RE: Corrective Actions Pursuant to the Matter of Specimen ID No.: L868944
Dear Ms. Bond:
In response to your email of Wednesday August 21, 2013 9:29, we are providing a summary of the corrective actions taken to prevent recurrence of the type of error that resulted in the rejection of Specimen ID No.: L868944.The following was communicated to South Bend Medical Foundation (SBMF) Toxicology staff: 1 It is the responsibility of the individual that opens the leak-proof specimen bag to contemporaneously annotate the condition of the tamper-evident seals when signing for receipt of a forensic specimen.2. (NEW) Prior to creating an aliquot from an unopened specimen bottle or specimen tube (includes blood ethanol specimens), the individual that breaks the tamper-evident seal MUST verify that the condition of the tamper-evident seal on the specimen(s) has. been annotated on the CCF.3. (NEW) The person breaking the tamper-evident seal is culpable (i.e., at fault or to be blamed) if at some later point it is determined that the condition of the tamper-evident seal was not recorded.4. NOTE: This protocol does not remove the responsibility or fault from the person that received the specimen; rather, the fault is shared between the receiving individual and the person that breaks the tamper-evident seal.5. If it is determined that the condition of the tamper-evident has not been recorded on the CCF prior to breaking the tamper-evident seal, have the individual that received the specimen verify the condition of the tamper-evident seal and ask that person to annotate the condition of the tamper-evident seals on the CCF.
- 6. If it is determined that the condition of the specimen bottles seals has not been recorded on the CCF prior to breaking the tamper-evident seal and the individual that received the specimen is unavailable, use Ancillary Chain of Custody form 950114 and the"Tamper-evident seal" stamp to record the condition of the tamper-evident seal.7. The SOP that corresponds to receiving specimens is being revised to reflect the aforementioned changes.Ms. Bond, we believe mandating a verification of the tamper-evident seals subsequent to the verification check performed during the initial receipt of the specimen minimizes the potential that a specimen will be handled in a manner as was the case for Specimen ID No.: L868944.If you have questions regarding what is herein contained please contact us.Prentiss Jones Jr., Ph.D., D-ABFT Toxicological Chemist (NRCC)Technical Director of Toxicology