Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] Category:License-Operator Examination Report (Non-Power Reactors Only)
MONTHYEARIR 05000315/20073012007-04-20020 April 2007 Er 05000315-07-301(DRS), 05000316-07-301(DRS); 03/19/06 - 03/26/06; Donald C. Cook Nuclear Power Plant; Initial License Examination Report 2007-04-20
[Table view] |
Text
April 20, 2007Mr. Mano K. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106SUBJECT:DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2NRC INITIAL LICENSE EXAMINATION REPORT 05000315/2007301(DRS);
05000316/2007301(DRS)
Dear Mr. Nazar:
On March 26, 2007, Nuclear Regulatory Commission (NRC) examiners completed initialoperator licensing examinations at your Donald C. Cook Nuclear Power Plant, Units 1 and 2.
The enclosed report documents the results of the examination which were discussed on March 23, 2007, with Mr. J. Jensen and other members of your staff. An exit meeting was conducted by telephone on March 28, 2007, between Mr. I. D. Fleedwood of your staff and Mr. D. McNeil, Senior Operations Engineer, to review the proposed final grading of the written examination for the license applicants. There were no post examination comments submitted for the examination by the station's staff.The NRC examiners administered an initial license examination operating test during the weekof March 19, 2007. The written examination was administered by plant training department personnel on March 26, 2007. Four Senior Reactor Operator and five Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on April 18, 2007. All nine applicants passed all sections of their respective examinations and were issued applicable operator licenses.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom, or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Nazar-2-We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/Hironori Peterson, ChiefOperations Branch Division of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74
Enclosures:
1.Operator Licensing Examination Report 05000315/2007301(DRS); 05000316/2007301(DRS)
w/Attachment: Supplemental Information2.Simulation Facility Report 3.Written Examinations and Answer Keys
REGION IIIDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74Report No:05000315/2007301(DRS); 05000316/2007301(DRS)
Licensee:Indiana Michigan Power Company Facility:Donald C. Cook Nuclear Power Plant Location:Bridgman, MI Dates:March 19 through March 26, 2007 Examiners:D. McNeil, Chief ExaminerC. Moore, Examiner C. Zoia, ExaminerApproved by:Hironori Peterson, ChiefOperations Branch Division of Reactor Safety Enclosure 1 1
SUMMARY OF FINDINGS
ER 05000315/2007301(DRS), 05000316/2007301(DRS); 03/19/06 - 03/26/06;Donald C. Cook Nuclear Power Plant; Initial License Examination Report.The announced initial operator licensing examination was conducted by regional NuclearRegulatory Commission examiners in accordance with the guidance of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 9.Examination Summary
- Nine applicants passed all sections of their respective examinations. Four applicantswere issued senior operator licenses and five applicants were issued operator licenses.
(Section 4OA5.1).
2
REPORT DETAILS
4.OTHER ACTIVITIES (OA)4OA5Other.1Initial Licensing Examinations
a. Examination Scope
The Donald C. Cook Plant Training Department trainers prepared the examinationoutline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of February 26, 2007, at the Donald C. Cook Nuclear Power Plant training building with the assistance of members of the licensee training staff. The examiners also audited at least 10 percent of the license applications for accuracy. The NRC examiners conducted the operating portion of the initial license examination during the week of March 19, 2007. The Donald C. Cook Plant training department staff administered the written examination on March 26, 2007. The NRC examiners and plant training staff used the guidance established in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, to prepare, validate, revise, administer, and grade the examination.
b. Findings
Written ExaminationDuring the validation of the written examination several questions were modified orreplaced. Changes made to the written examination were documented on Form ES-401-9, "Written Examination Review Worksheet" which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The licensee had no post-examination comments.
The NRC examiners graded the written examination on April 2, 2007, and conducted a review of each question missed by 50 percent or more of the applicants to determine the accuracy and validity of the examination questions.Operating TestDuring the validation of the operating test, minor modifications were made to the JobPerformance Measures (JPMs) and to the dynamic simulator scenarios. Changes made to the operating test were documented in a document titled, "Operating Test Comments," which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The NRC examiners completed grading the operating test on April 9, 2007.
3Examination ResultsFour applicants at the Senior Reactor Operator (SRO) level and five applicants at theReactor Operator (RO) level were administered written and operating tests. Two of the SRO applicants were previously licensed as ROs at the Donald C. Cook Nuclear Power Plant. All nine applicants passed all portions of their examinations and were issued applicable operating licenses..2Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation ofexamination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, "Integrity of Examinations and Tests." The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors" to determine acceptability of the licensee's examination security activities.
b. Findings
No findings of significance were identified.4OA6MeetingsDebriefThe chief examiner presented the examination team's preliminary observations andfindings on March 23, 2007, to J. Jensen and other members of the Donald C. Cook Nuclear Power Plant staff. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.Exit MeetingThe chief examiner conducted an exit meeting on March 28, 2007, with Mr. I. Fleetwood,Donald C. Cook Plant Initial License Training Supervisor by telephone. Receipt of the written examination materials was acknowledged by the chief examiner and Mr. Fleetwood stated that the licensee had no post examination comments.ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- J. Jensen, Site Vice-President
- S. Adkins, Legal
- L. Bush, Operations
- R. Crane, Regulatory Affairs
- I. Fleetwood, ILT Supervisor
- R. Harrah, Training - Operations
- J. Newmiller, Compliance
- S. Simpson, Manager, Regulatory Affairs
- L. Weber, Plant Manager
NRC
- D. McNeil, Examiner
- B. Kemker, Senior Resident Inspector, Donald C. Cook Plant
- C. Moore, Examiner
- C. Zoia, Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and
Discussed
None
LIST OF DOCUMENTS REVIEWED