|
---|
Category:Memoranda
MONTHYEARML17013A1462018-08-29029 August 2018 Audit Summary to Review KHNP APR1400 Non-LOCA Chapter 15, Transient and Accident Analyses - Memo ML18158A3422018-08-15015 August 2018 KHNP Environmental Assessment: APR1400 Design Certification (Rin 3150-AJ67; NRC-2015-0225 ML18150A6472018-06-11011 June 2018 APR1400, Supplementary Information for Safety Evaluation with No Open Items for Chapter 14.3, Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) - Memorandum ML18156A0462018-06-0505 June 2018 APR1400 Topical Report Safety Evaluation, Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 - Memorandum to ACRS ML18149A5502018-05-31031 May 2018 APR1400 Chapter 14.3.2, Structural and Systems Engineering - ITAAC, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18147A0032018-05-31031 May 2018 APR1400 Chapter 13, Conduct of Operations, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML17188A3032018-05-21021 May 2018 APR1400 Chapter 6, Engineered Safety Features, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18054A6862018-05-20020 May 2018 APR1400 Chapter 14.3, Verification Programs, Safety Evaluation Report with Open Items - Memorandum to ACRS Memo ML18128A2992018-05-0808 May 2018 APR1400 Chapter 17, Quality Assurance and Reliability Assurance, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18128A1112018-05-0808 May 2018 APR1400 Chapter 19, Section 19.0 and Section 19.1, Probabilistic Risk Assessment and Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18122A2242018-05-0808 May 2018 APR1400 Chapter 19, Section 19.2, Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18073A2552018-03-26026 March 2018 Summary of March 14, 2018 Public Meeting with KHNP to Discuss Human Factors Engineering ML18068A1292018-03-26026 March 2018 March 7, 2018 Summary of Public Meeting with KHNP to Discuss Proposed ITAAC for the APR1400 ML17265A2692018-03-23023 March 2018 Transmittal Memo to ACRS of the LBLOCA Safety Evaluation for KHNP Topical Report APR1400-F-A-TR-1200A-P, Realistic Evaluation Methodology for Large-Break Loss of Coolant Accident of the APR1400. ML18017A2422018-03-20020 March 2018 Chapter_3_Phase_4_Memorandum ML18074A0322018-03-19019 March 2018 APR1400 P4 Chapter 7 ACRS ML17269A3152018-03-19019 March 2018 Transmittal Memo to ACRS of the Chapter 15 Phase 4 Safety Evaluation Report Transient and Accident Analyses, APR1400 Design Certification ML17166A1142018-02-23023 February 2018 APR1400 Chapter 2 Phase 4 - Section 2.5 - Memo to ACRS ML18012A6282018-01-26026 January 2018 Chapter_9_Phase_4_Memorandum ML17243A2462018-01-26026 January 2018 Memo Advanced Power Reactor 1400 Design Certification Application - Safety Evaluation with No Open Items for Section 19.4, Loss of Large Areas of the Plant Due to Explosions or Fire ML17271A0982018-01-26026 January 2018 APR1400 P4 Chapter 19.3 ACRS Memo ML17276A0342018-01-26026 January 2018 Memo for Transmittal to ACRS the Phase 4 Chapter 19.5, Aircraft Impact Assessment Safety Evacuation Report for the APR1400 Design Certification ML17276B5182017-12-28028 December 2017 APR1400 P4 Chapter 18 ACRS Memo ML17188A3152017-12-28028 December 2017 APR1400 Chapter 16 Phase 4 ACRS Memorandum ML17324B2882017-12-28028 December 2017 APR1400 P4 Chapter 14.1-14.2 ACRS Memo ML17334A1042017-12-27027 December 2017 APR1400 Chapter 4 Phase 4 Memorandum ML17132A2862017-12-26026 December 2017 Audit Report of Structural and Seismic Design Supporting Chapter 3, Design of Structures, Systems, Components, and Equipment, of the Advanced Power Reactor 1400 Design Control Document ML17058A3932017-03-17017 March 2017 APR1400 Chapter 14, Phase 3, ACRS Memo ML16300A1842016-12-0707 December 2016 Memorandum - Audit Summary for the Korea Hydro and Nuclear Power Co. Ltd Advanced Power Reactor 1400 Electric Power System ML16211A3512016-08-0404 August 2016 Supplemental Safety Evaluation Report for Topical Report APR1400-K-Q-TR-11005-NP, Revision 5, Knhp Quality Assurance Program Description for the APR1400 Design Certification. 2018-08-29
[Table view] Category:Safety Evaluation Report
MONTHYEARML17023A2582017-03-17017 March 2017 APR1400 Chapter 14, Verification Programs, (Section 14.2 - ITP) Phase 2 Safety Evaluation with Open Items ML16211A3512016-08-0404 August 2016 Supplemental Safety Evaluation Report for Topical Report APR1400-K-Q-TR-11005-NP, Revision 5, Knhp Quality Assurance Program Description for the APR1400 Design Certification. 2017-03-17
[Table view] |
Text
August 4, 2016
MEMORANDUM TO: Jeff Ciocco, Senior Project Manager Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors
FROM: Kerri A. Kavanagh, Chief
/RA/ (VHall for)
Quality Assurance Vendor Inspection Branch-3 Division of Construction Inspection and Operational Programs Office of New Reactors
SUBJECT:
SUPPLEMENTAL SAFETY EVALUATION REPORT FOR TOPICAL REPORT APR1400-K-Q-TR-11005-NP, REVISION 5, "KHNP QUALITY ASSURANCE PROGRAM DESCRIPTION FOR THE APR1400 DESIGN CERTIFICATION"
By letter dated May 2, 2016, Korea Hydro and Nuclear Power Co. Ltd (KHNP) submitted Revision 5 of Topical Report (TR) APR1400-K-Q-TR-11005-NP to the U.S. Nuclear Regulatory Commission (NRC) staff for review and approval. APR1400-K-Q-TR-11005-NP, Revision 5 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16123A404) contained minor revisions to reflect organizational changes within KHNP to support APR1400 Design Certification (DC) project efficiency.
By letter dated October 28, 2013 (ADAMS Accession No. ML13302A142), KHNP submitted TR APR1400-K-Q-TR-11005-NP entitled, "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification," Revision 3, to the NRC staff. By letter dated January 6, 2014, the NRC staff requested additional information on the KHNP TR, Revision 3 (ADAMS Accession No. ML14083A610). KNHP responded to the NRC's request for additional information with letter dated March 26, 2014 (ADAMS Accession No. ML14085A096) and submitted TR APR1400-K-Q-TR-11005-NP, "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification," Revision 4, to the NRC staff for review. The NRC staff reviewed and approved TR APR1400-K-Q-TR-11005-NP, Revision 4 in letter dated April 30, 2014 (ADAMS Accession No. ML14114A464).
CONTACT: Aaron Armstrong, NRO/DCIP/QVIB 301-415-8396
J.Ciocco The NRC staff has reviewed APR1400-K-Q-TR-11005-NP, Revision 5 and has found that it is acceptable for use by KHNP for the AP1400 DC activities. The NRC staff confirmed that the changes incorporated into PR1400-K-Q-TR-11005-NP, Revision 5 were administrative in nature and do not constitute a reduction in commitment from the previous NRC-approved version of APR1400-K-Q-TR-11005-NP. Our acceptance applies only to material provided in the subject TR, and not the APR1400 DC submittal. The NRC staff requires that KHNP update the reference revision number in the Design Control Document (DCD), Chapter 17.5, "Quality Assurance and Reliability Assurance" in the future revision of the DCD.
Docket No: 52-046
ML16211A351 NRO-002 OFC NRO/DCIP/QVIB-1 NRO/DCIP/QVIB-3 NAME AArmstrong KKavanagh (VHall for) DATE 08/04/16 08/04/16