Pages that link to "IR 05000528/1992041"
Jump to navigation
Jump to search
The following pages link to IR 05000528/1992041:
Displayed 50 items.
- IR 05000528/1992014 (← links)
- IR 05000529/1986033 (← links)
- PNO-V-85-068, on 851003,while Operating at 50% Power,Reactor Trip Occurred After Loss of Electric Power.Three Reactor Coolant Pumps Restarted by Resetting Pump Circuit Breaker Lockout Relays.Cause Under Investigation (← links)
- IR 05000528/1985041 (← links)
- IR 05000528/1985037 (← links)
- IR 05000528/1985040 (← links)
- IR 05000528/1985026 (← links)
- IR 05000530/1985020 (← links)
- IR 05000528/1985027 (← links)
- IR 05000528/1985023 (← links)
- PNO-V-86-003, on 860109,during Full Power Turbine Trip Test Following Turbine Trip/Reactor Trip,Electrical Buses Which Supply Power to Reactor Coolant Pumps Failed to Transfer to Alternate Source.Restart Plans Unknown (← links)
- IR 05000528/1985021 (← links)
- IR 05000603/2007031 (← links)
- IR 05000528/1985020 (← links)
- ML20137A895 (← links)
- IR 05000528/1985025 (← links)
- PNO-V-85-076, on 851108,licensee Reported That Studs in RCS Line Stops a & B Did Not Meet Hardness Requirements.Relief from 10CFR50,App A,Gdc 4 Requested to Preclude Retorquing Studs (← links)
- PNO-V-85-058, on 850912,unusual Event Declared After Main Turbine Tripped During Load Rejection Test.Low Voltage Tripped Reactor Coolant Pumps.Overcooling RCS Caused Decrease in Safety Injection Setpoint (← links)
- IR 05000528/1985029 (← links)
- ML20135A869 (← links)
- ML20135A856 (← links)
- ML20135A834 (← links)
- ML20147G159 (← links)
- ML20147E670 (← links)
- IR 05000528/1996020 (← links)
- PNO-V-85-088, on 851216,ventilation Fan in Train a balance- of-plant ESFAS Auxiliary Relay Cabinet Tripped Off & Caused Cabinet to Overheat.Trip Resulted in Logic Cards Malfunctioning.Licensee Actions Under Review (← links)
- PNO-V-85-073, on 851029,13.8 Kv Bus SO3 Feeder Breaker to 13.8 Kv Bus SO1 Tripped Open on Generation of Electrical Fault,Damaging Portion of Bus Bar.Cause Unknown.Plant Entered Cold Shutdown.Investigation Continuing (← links)
- IR 05000529/1985032 (← links)
- IR 05000528/1985033 (← links)
- IR 05000529/1985029 (← links)
- IR 05000528/1985034 (← links)
- IR 05000528/1997008 (← links)
- ML20138C107 (← links)
- IR 05000801/2009008 (← links)
- ML20138B566 (← links)
- PNO-V-85-052, on 850805 & 08,breaker Power Switches on Control Element Drive Mechanism Panels Found Closed.Two 13.8 Kv Electrical Breaker Incidents Under Licensee Review to Determine If Tampering Involved (← links)
- ML20134C991 (← links)
- PNO-V-85-072, on 851024,reactor Tripped from 80% Power During Scheduled Loss of Load Test.Cause Undetermined.Util Requested Assistance from C-E to Determine Cause of Trip & Cooldown of RCS (← links)
- IR 05000428/2006029 (← links)
- IR 05000528/1985035 (← links)
- IR 05000528/1985028 (← links)
- PNO-V-85-069, on 851003 & 08,loss of Normal Electric Power Resulted in Reactor Trip.Caused by Switchyard Electrical Distribution Malfunction.Licensee Proceeding W/Design Change to hard-wire Control for Feeder Breakers (← links)
- ML20133F313 (← links)
- IR 05000528/1985018 (← links)
- IR 05000529/1985025 (← links)
- PNO-V-85-050, on 850726,while Preparing to Cool Down from 55-day Hot Functional Test Run,Alarm Received That Breaker Control Switch Operated W/O Authorization from Remote to Local Position.Cause Under Investigation (← links)
- PNO-V-85-059, updating PNO-V-85-058:on 850912,reactor Trip & Safety Injection Occurred.Caused by Open Atmospheric Dump Valve,Open Main Steam Line Low Point Drain Valves & Use of Auxiliary Feedwater Pump (← links)
- PNO-V-85-048, on 850724,licensee Determined That Plant Outage of Greater than 7 Days Expected to Repair Main Condenser. Caused by Damage to Two Condenser Tubes & Heater Drain Tank Inlet Shroud Due to Broken Condenser Baffle (← links)
- IR 05000528/1985019 (← links)
- IR 05000429/2006002 (← links)