Pages that link to "ML20154J986"
Jump to navigation
Jump to search
The following pages link to ML20154J986:
Displayed 50 items.
- ML20214U555 (← links)
- ML20211L549 (← links)
- CY-98-108, Provides Supplemental Info in Support of 970530 Proposed License Amend Request,Reflecting Permanently Defueled Condition of HNP (← links)
- CY-98-104, Provides Addl Info on HNP Defueled Emergency Plan.Util Will Continue to Discuss & Obtain Agreement W/State of CT & Town of Haddam on Emergency Action Levels,Per 10CFR50,App E, Section Iv.B (← links)
- CY-98-088, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-01 on 980113-0413.Corrective Actions:Proposed LAR Submitted for Approval to Declare New Seismic Monitoring Sys Operable Per TS Manual (← links)
- B13364, Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a)) (← links)
- B13375, Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk (← links)
- B13374, Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const (← links)
- B13321, Informs of Inability to Submit plant-specific Analyses for Util as Planned,Due to Delays Encountered in Completing Sensitivity & Break Spectrum Analysis.Meeting Between NRC & Util Representatives Arranged for 890810 (← links)
- B13251, Forwards Bimonthly Progress Rept 16 for New Switchgear Bldg Const.Const on New Switchgear Continued to Progress,Per Revised Milestone Schedule Provided to NRC in Sept 1988.No Delay in Meeting Any Milestone Expected (← links)
- B13265, Requests That NRC Process 890331 Amend to License DPR-61 Re Containment Integrity During Containment Air Recirculation Fan Motor HX Cleaning Activities as Exigent Change (← links)
- A07040, Submits Results of long-term Analysis Per Commitment in 880324 Response to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes (← links)
- B13186, Provides Addl Info Re Dedication of commerical-grade Items, 10CFR21 Requirements & Westinghouse Technical Bulletin NSD-TB-83-02,in Response to Insp Rept 50-213/89-200 (← links)
- A07780, Comments on NRC 890123 SER Approving Inservice Insp Program, Third 10-yr Interval,Rev 1.Util Will Upgrade Classification of Svc Water Supply & Return Lines to Containment Air Recirculation Fan Coolers to ASME Class 2 (← links)
- B13225, Reiterates Util Position on 10CFR50.44(c)(3)(ii) & Provides Addl Info & Clarification Re Combustible Gas Control Issue. Calculations of Combustible Gas Generation Updated Following LOCA to Address Plans for Conversion to Zircaloy Cladding (← links)
- B13236, Draft Ltr Forwarding Comparison Between Util 880829 Proposed Tech Specs & Westinghouse STS & Justification for Any Deviations,Per 890330 Meeting W/Nrc (← links)
- B13188, Lists Amounts of Property Insurance Currently in Force for Facility (← links)
- B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl (← links)
- CY-98-071, Provides Supplemental Info in Support of 970530 Proposed License Amend,Reflecting Permanently Defueled Condition of HNP (← links)
- CY-98-079, Notifies NRC of Cancellation of Licenses for Listed Individuals,Per 10CFR50.74 (← links)
- B13184, Documents Util Intention to Address Open Item Re Draft Emergency Exercise Scenario Package,In Response to NRC Questions Raised in Insp Rept 50-213/88-20 (← links)
- CY-98-064, Forwards Annual Radiological Environ Operating Rept, for Haddam Neck Station for Period of Jan-Dec 1997.Rept Submitted IAW Plant TS 6.9.1.6 & Radiological Effluent Monitoring & ODCM (← links)
- CY-98-074, Provides Response to NRC Comments on Plant Proposed Defueled Physical Security Plan.Response Withheld (← links)
- B13346, Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A (← links)
- B13351, Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced (← links)
- B13235, Forwards Addl Info to Support Completion of NRC Review of Reactor Protection Sys Upgrade Project.Rev 0 to IC-CALC-88-001, Connecticut Yankee Instrument & Controls Calculations:Dynamic Response of Low Pressurizer... Encl (← links)
- B13282, Forwards Response to 890501 Request for Addl Info Re Util Const of New Switchgear Bldg at Plant (← links)
- B13211, Forwards Rev to Nusco 164, Large Break LOCA Analysis Sys Evaluation Model (NULAP5-LB). Rev Corrects Description of Blowdown Heat Transfer Models in RELAP/MOD2 (Parent Code of NULAP5-LB) (← links)
- B13341, Forwards WCAP-12196, Svc Water Sys Design Basis Temp Increase to 95 F for Connecticut Yankee & Haddam Neck Plant, Per Request in Amend 112 to License DPR-61.Northeast Utils Svc Co Suppl to Rept Also Encl (← links)
- B13340, Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis (← links)
- B13339, Forwards Addl Info Re Util 881026 & 890306 Revised Tech Specs Requests,Per NRC Request.Existing 8 H Shift Frequency Does Not Provide Enough Latitude within 8 H Shift Whereas 12 H Shift Would (← links)
- B13224, Forwards Request for Schedular Exemption from Requirements of 10CFR50,App J,Sections III.A.6.(b),III.D.2(a) & III.D.3. Exemptions Will Provide Relief from Requirements for Penalty Type a Test Intervals During 1989 Refueling Outage (← links)
- B13223, Provides Results of ECCS Single Failure Analysis of Electrical & Air Sys.Two single-failure Vulnerabilities Re Boundary Valve Between QA Category 1 & non-QA Piping & Failure of Svc Water Pumps During LOCA Discovered (← links)
- B13257, Informs That Util Will Not Be Able to Implement RCS Level Indication Mod Until End of Second Refueling Outage,Per Generic Ltr 88-17 (← links)
- B13283, Confirms That Independent Walkthroughs Conducted on Software of Seven Listed Foxboro Spec 200 Micro Configurable Block Types,Per Recent Telcons W/Nrc (← links)
- B13222, Forwards Fire Hazard Analysis & 10CFR50,App R,Compliance Review (← links)
- B13137, Requests Exemption from Certain Requirements of 10CFR50, App J,Sections III.C.1 & III.C.2 Re Type C Testing Requirements.Diagrams for Each Penetration Included in Attachment I (← links)
- A07863, Forwards Addl Info Supporting NRC Review of Atws/Auxiliary Feedwater Sys in Compliance w/10CFR50.62(c) & Westinghouse Generic Package Described in WCAP-10858P-A,Rev 1,Section 2-3,per 890302 Request (← links)
- A08061, Responds to NRC Re Violations Noted in Insp Rept 50-213/89-05.Corrective Actions:Valve PW-V-600 Placed in Locked Close Position & Labeled as Containment Isolation Valve & Procedures Re Containment Integrity to Be Reviewed (← links)
- B13179, Responds to NRC Station Blackout Rule Re Capability of Plant to Maintain Core Cooling & Containment Integrity. Procedure Changes Identified in Part B of Attachment 1 Will Be Completed in 1 Yr After Notification Provided by NRR (← links)
- B13194, Forwards New Switchgear Bldg Const Bimonthly Progress Rept 15,per 860930 Commitment (← links)
- B12623, Forwards Rev 15 to Plant Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(a)) (← links)
- B12779, Informs That Due to Delays in Plant Const That Necessitated Temporary Changes to Protected Area Boundary,Original Protected Area Boundary Design Will Not Be Met by 871231. Extension of Change Until 880415 Acceptable Per 10CFR50.54 (← links)
- B12761, Forwards Proprietary Rev 16 to Physical Security Plan.Rev Does Not Decrease Physical Security Plan Effectiveness.Rev Withheld (Ref 10CFR73.21(b) & 2.790(a)) (← links)
- B12662, Forwards Response to Listed Question Re Nusco 151, Haddam Neck Plant Reanalysis of Non-LOCA DBA, Per 870727 Telcon. Addl Info,Inadvertently Missing from ,Also Encl (← links)
- B12647, Forwards Relief Request 3.0 Requesting Relief from Performing Sys Hydrostatic Test of Svc Water Sys at Pressure in Conformance W/Requirements of IWA-5265(b).Fee Paid (← links)
- B12610, Responds to Questions Posed During 870701 & 21 Telcon Re Fluence Calculations & Util Intentions Re Evaluation of PTS Upon Conversion from Stainless Steel to Zircaloy Clad Fuel. NRC Should Approve Rt PTS Evaluation Per 10CFR50.61 (← links)
- B12502, Advises That Since Re Nuclear Engineering & Operations (Neo) Procedures Upgrades,Further Improvements & Refinements of Neo Procedures Made (← links)
- B12640, Confirms That Piping Stress Analysis Considered Eccentric Mass of New Valves & Operators Being Installed as Part of ECCS Mods,Per NRC 870811 Telcon Request (← links)
- A05805, Forwards Response to NRC Request for Addl Info Re Plant Crdr Implementation Plan,Per Suppl 1 to NUREG-0737.CRDR Summary Rept Will Be Provided by 880225 (← links)