Pages that link to "CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc"
Jump to navigation
Jump to search
The following pages link to CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc:
Displayed 50 items.
- 0CAN081402, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) (← links)
- 0CAN021406, Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) (← links)
- 0CAN021405, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) (← links)
- CNRO-2007-00033, Request ISI-2007-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non-Destructive Examination Activities (← links)
- CNRO-2007-00014, Request for Alternative ANO1-R&R-010 Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs (← links)
- CNRO-2007-00007, Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds (← links)
- CNRO-2006-00038, Request ISI-2006-1, Use of Later ASME Section XI Code Edition and Addenda for Qualification of Thermal Removal Processes in Accordance with IWA-4461.4 (← links)
- W3F1-2017-0031, Entergy Operations, Inc. Second Six Month Status Notification in Response to Confirmatory Order EA-15-100 (← links)
- W3F1-2016-0062, Waterlord, Unit 3, First Six Month Status Notification in Response to Confirmatory Order EA-15-100 (← links)
- W3F1-2016-0021, Resubmittal of Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- W3F1-2016-0009, Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- W3F1-2015-0068, Fifth Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- W3F1-2015-0067, Fifth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- W3F1-2015-0003, Fourth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- W3F1-2014-0049, Third Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- W3F1-2014-0015, Second Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- W3F1-2014-0014, Second Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- W3F1-2012-0092, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- W3F1-2005-0051, Status of the Real Time Contingency Monitoring Program (← links)
- CNRO-2005-00041, Request for Alternative ANO1-R&R-009 Request to Use Wire-Type Penetrameters as an Alternative to 1992 Edition of ASME Section III, Tables NB-5111-1 and NC-5111-1 (← links)
- CNRO-2005-00019, Response to Request for Additional Information Concerning ANO2-R&R-003-Proposed Alternative to ASME Requirements for Weld Repairs (← links)
- CNRO-2005-00016, Request for Alternative ANO2-R&R-003 Proposed Alternative to ASME Requirements for Weld Repairs (← links)
- CNRO-2005-00002, Request for Alternative ANO2-R&R-008 - Use of Mechanical Nozzle Seal Assemblies (← links)
- CNRO-2005-00005, Request for Alternative ANO2-R&R-008 Use of Mechanical Nozzle Seal Assemblies (← links)
- CNRO-2005-00004, Request for Alternative ANO2-R&R-008 - Use of Mechanical Nozzle Seal Assemblies (← links)
- ML050450583 (← links)
- CNRO-2004-00061, Request for Alternative ANO2-R&R-008 - Use of Mechanical Nozzle Seal Assemblies (← links)
- CNRO-2004-00070, Response to NRC Request for Additional Information Pertaining to Request for Alternative ANO2-R&R-002, Rev. 1 (← links)
- CNRO-2004-00068, Requests for Alternative R&R-005 and R&R-006 - Review of NRC Safety Evaluation for Proprietary Information (← links)
- CNRO-2004-00060, Arkansas, Unit 1 - Relief Requests ANO1-ISI-001 and ANO1-ISI-003 - Response to Request for Additional Information (← links)
- CNRO-2004-00063, Relief Request ANO1-R&R-005 - Response to the Nrc'S Request for Additional Information (← links)
- CNRO-2004-00029, Requests for Alternatives ANO1-R&R-005 and ANO1-R&R-006 - Proposed Alternatives to ASME Weld Repair and Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- CNRO-2004-00026, Request for Alternative ANO1-R&R-006 - Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- CNRO-2004-00028, Request for Alternatives ANO1-R&R-005 - Proposed Alternative to ASME Weld Repair Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- CNRO-2004-00023, Request for Alternatives ANO1-R&R-005 and ANO1-R&R-006 - Proposed Alternatives to ASME Weld Repair and Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- CNRO-2004-00022, Arkansas Unit 1, Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- CNRO-2004-00016, Request for Alternative ANO2-R&R-002, Rev. 1 - Use of Mechanical Nozzle Seal Assemblies (← links)
- CNRO-2004-00017, Arkansas, Unit 1 - Request for Alternative ANO1-R&R-005, Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations (← links)
- CNRO-2004-00014, Arkansas, Unit 1 - Request for Alternative ANO1-R&R-006, Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- CNRO-2004-00006, Arkansas, Unit 1 - Request for Alternatives ANO1-R&R-005 and ANO1-R&R-006, Proposed Alternatives to ASME Weld Repair and Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles (← links)
- CNRO-2004-00010, Arkansas, Unit 1 - Pre-Application Review, ASME Request for Alternative ANO1-R&R-007, Use of Mechanical Nozzle Seal Assemblies on Reactor Vessel Bottom Mounted Instrumentation Nozzles (← links)
- CNRO-2002-00054, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations (← links)
- CNRO-2003-00063, Arkansas, Unit 1 - Requests for Relief from ASME Section XI Volumetric Examination Requirements (← links)
- CNRO-2003-00051, Supplemental Information Pertaining to Relaxation Requests to NRC Order EA-03-009 (← links)
- CNRO-2003-00047, Arkansas, Unit 2 - Relaxation Request to NRC Order EA-03-009 for Control Element Drive Mechanism Nozzles (← links)
- CNRO-2003-00046, Arkansas, Unit 2, Relaxation Request to NRC Order EA-03-009 for in-Core Instrumentation Nozzles (← links)
- CNRO-2003-00035, Arkansas, Unit 2 - Response to Request for Additional Information Pertaining to Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles (← links)
- CNRO-2003-00040, Entergy Operations, Inc. - Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles (← links)