CNRO-2003-00040, Entergy Operations, Inc. - Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles

From kanterella
Jump to navigation Jump to search
Entergy Operations, Inc. - Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles
ML032660016
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/12/2003
From: Krupa M
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2003-00040, EA-03-009
Download: ML032660016 (2)


Text

Entergy Operations, Inc.

1340 Echelon Parkway

~Entergy Jackson, MS 39213-8298 Tel 601 368 5758 Michael A. Krupa Director Nuclear Safety &Licensing CNRO-2003-00040 September 12, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

-Entergy Operations.nc _-

Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles -

Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6

REFERENCE:

Entergy Operations, Inc. letter CNRO-2003-00035 to the NRC, "Response to Request for Additional Information Pertaining to Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles," dated September 3, 2003

Dear Sir or Madam:

In the referenced letter, Entergy Operations, Inc. (Entergy) requested relaxation from Section IV.C(1)(b) of NRC Order EA-03-009 for Arkansas Nuclear One, Unit 2 (ANO-2) via Relaxation Request #3 pertaining to the In-Core Instrumentation (ICI) nozzles located in the reactor pressure vessel (RPV) head. The request proposed a three-step alternative based on ultrasonic testing, stress analysis, and augmented inspections utilizing a sampling plan.

-In a telephone-conference hekldon-September9, 2003,-representatives of the NRC staff and Entergy discussed the use of a sampling plan to determine the number of nozzles to be inspected. As a result of that discussion and by this letter, Entergy amends Relaxation Request #3. Specifically, Entergy will not utilize a sampling plan and proposes to perform augmented inspections of the eight (8) ICI nozzles as described in the request.

This letter contains no new commitments.

%7 0ID

CNRO-2003-00040 Page 2 of 2 If you have any questions or require additional information, please contact Guy Davant at (601) 368-5756.

Sincerely, MAKIGHD/bal cc: Mr. C. G. Anderson (ANO)

Mr. W. A. Eaton (ECH)

Mr. G. A. Williams (ECH)

Mr. T. -A. Alexionm-NRR Project Manager (AN-) - v Mr. R. L. Bywater, NRC Senior Resident Inspector (ANO)

Mr. T. P. Gwynn, NRC Region IV Regional Administrator