MONTHYEARCNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00023, Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities2016-12-0101 December 2016 Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2013-00004, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2013-03-25025 March 2013 Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc CNRO-2012-00004, Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications2012-05-21021 May 2012 Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications CNRO-2011-00007, 2011 Recertification of Foreign Ownership Control or Interest2011-10-0606 October 2011 2011 Recertification of Foreign Ownership Control or Interest CNRO-2011-00005, Response to Request for Additional Information on 2011 Decommissioning Fund Status Report2011-07-0505 July 2011 Response to Request for Additional Information on 2011 Decommissioning Fund Status Report CNRO-2011-00004, Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2011-04-29029 April 2011 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2011-03-31031 March 2011 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2010-00002, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2010-04-29029 April 2010 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G 2021-10-06
[Table view] |
Text
Entergy Operations, Inc.
_- 1340 Echelon Parkway En tU XvJackson. Mississippi 39213-8298 Tel 601-368-5758 F. G. Burford Acting Director Nuclear Safety & Licensing CNRO-2005-00041 August 2, 2005 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Request for Alternative ANO1-R&R-009 Request to Use Wire-Type Penetrameters as an Alternative to the 1992 Edition of ASME Section 1II,Tables NB-51i1-1 and NC-51i1-1 Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a(a)(3)(i) Entergy Operations, Inc., (Entergy) proposes alternatives to the nondestructive examination requirements applicable to ASME Class 1 and 2 welds and weld repairs as required by ASME Section Xl Code Case N-416-2. Specifically, Entergy requests NRC approval to use "wire-type" penetrameters for performing radiographic examinations in accordance with Tables NB-51i1-1 and NC-511 -1 of ASME Section III, 1992 Edition with 1993 Addenda as an alternative to the "hole-type" penetrameters permitted in the 1992 Edition of Section 1II.This request, contained in the enclosure as Request for Alternative ANO1-R&R-009, applies to Arkansas Nuclear One, Unit 1 (ANO-1).
The NRC staff has approved similar requests for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (TAC Nos. MB3073 and MB3074), and Indian Point Energy Center, Unit 2 (TAC No.
M1B0032).
Entergy requests that the staff approve the use of ANO1-R&R-009 on or before August 2, 2006. Should you have any questions regarding this submittal, please contact Guy Davant at (601) 368-5756.
This letter contains no commitments.
Very truly yours, FGB/GHD/ghd
Enclosure:
Request for Alternative ANO1-R&R-009
CNRO-2005-00041 Page 2 of 2 cc: Mr. W. A. Eaton (ECH)
Mr. J. P. DeRoy (ECH)
Mr. J. S. Forbes (ANO)
Dr. Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. M. C. Thadani (ANO-1)
MS O-7D1 Washington, DC 20555-0001
ENCLOSURE CNRO-2005-00041 REQUEST FOR ALTERNATIVE ANO1-R&R-009
ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNIT 1 3 RD 10-YEAR INTERVAL REQUEST NO. ANO1-R&R-009 COMPONENTS Component/Number: Various ASME Class 1 and 2 Items
Description:
ASME Code Class 1 and 2 items with welds or repair welds requiring radiography Code Class: 1 and 2
References:
- 1. ASME Section Xl, 1992 Edition with portions of the 1993 Addenda as listed in Reference 5
- 2. ASME Section Xl Code Case N-416-2, Alternate Pressure Test Requirements for Welded Repairs, Fabrication Welds for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding
- 3. ASME Section III, Subsection NB, 1992 Edition
- 4. ASME Section III, Subsection NB, 1992 Edition, 1993 Addenda
- 5. CEP-ISI-002, Arkansas Nuclear One Unit 1Inservice Inspection Plan
- 6. NRC Regulatory Guide 1.147, Inservice Inspection Code Case Acceptability, ASME Section Xl, Division 1 Unit: Arkansas Nuclear One, Unit 1 (ANO-1)
Inspection Interval: Third (3rd) 10-Year Interval
- 11. CODE REQUIREMENTS Subarticle IWA-4170(b) of ASME Section Xl, 1992 Edition states, "Repairs and installation of replacement items shall be performed in accordance with the Owner's Design Specification and the original Construction Code of the component or system.
Later editions and addenda of the Construction Code or of Section III, either in their entirety or portions thereof, and Code Cases may be used."
IWA-4710(a) of ASME Section Xl, 1992 Edition states, uAfter a welded repair on a pressure retaining boundary or the installation of a replacement by welding, a system hydrostatic test shall be performed in accordance with IWA-5000."
As an alternative to the hydrostatic test of IWA-471 0(a), a system leakage test can be performed in accordance with ASME Section Xl Code Case N-416-2. Code Case N-416-2 has been conditionally approved by the NRC in Regulatory Guide 1.147.
Page 2 of 5
(Regarding Code Case N-416-2, Table 2, Conditionally Acceptable Section Xl Code Cases, of Regulatory Guide 1.147 states, 'The provisions of IWA-5213, 'Test Condition Holding Times,' 1989 Edition, are to be used." Entergy will meet this condition.)
Paragraph (a) of Code Case N-416-2 states, "NDE shall be performed on welded repairs and fabrication and installation joints in accordance with the methods and acceptance criteria of the applicable Subsection of the 1992 Edition of Section III."
Paragraphs NB-5111 (ASME Class 1) and NC-5111 (ASME Class 2) of ASME Section Ill, 1992 Edition contain the following requirements regarding the use of penetrameters (image quality indicators):
NB-5111 states in part, 'Radiographic examination shall be in accordance with Section V, Article 2, except that fluorescent screens are not permitted, the geometric unsharpness shall not exceed the limits of T-285, and the penetrameters of Table NB-51 11 -1 shall be used in lieu of those shown in Table T-276."
NC-5111 states in part, "Radiographic examination shall be in accordance with Section V, Article 2, except that fluorescent screens are not permitted, the geometric unsharpness shall not exceed the limits of T-285, and the penetrameters of Table NC-5 11-1 shall be used in lieu of those shown in Table T-276."
Tables NB-5111 -1 and NC-5111-1 of the 1992 Edition of Section IlIl permit the use of "hole-type" penetrameters only; "wire-type" penetrameters are not permitted.
111. PROPOSED ALTERNATIVE A. Background ANO-1 utilizes the alternative pressure testing provisions of Code Case N-416-2 when performing repair/replacement activities involving welding. When invoking Code Case N-416-2, the NDE of all welded joints and repairs must be performed in accordance with the applicable Subsection (i.e., NB, NC, or ND) of the 1992 Edition of ASME Section IlIl.
Tables NB-511 -1 (ASME Class 1) and NC-5111-1 (ASME Class 2) of ASME Section 111, 1992 Edition specify penetrameter requirements for performing radiography. Based on these tables, only "hole-type" (plaque-type) penetrameters can be used. The use of "wire-type" penetrameters is not permitted by the 1992 Edition of Section 1I1.However, Tables NB-511l-1 and NC-5111-1 were revised to include wire-type penetrameter requirements in the 1992 Edition, 1993 Addenda of ASME Section 1II.Therefore, as of the 1993 Addenda of Section IlIl, wire type penetrameters are acceptable for use when performing radiography.
In addition, the 1992 Edition of ASME Section IlIl, Subsection ND permits the use of both hole-type and wire-type penetrameters for ASME Class 3 applications.
According to paragraph ND-51 11 (a), "Radiographic examination shall be in accordance with Section V, Article 2, except that the geometric unsharpness shall not exceed the limits of T-285." ASME Section V has permitted the use of wire-type penetrameters since the 1986 Edition, 1987 Addenda. Therefore, by reference to Article 2 of ASME Section V, paragraph ND-51 11 (a) has simply invoked the penetrameter requirements of Section V.
Page 3 of 5
B. Proposed Alternative Pursuant to the provisions of 10 CFR 50.55a(a)(3)(i), Entergy proposes an alternative to the NDE requirements of ASME Section Xl Code Case N-416-2, paragraph (a) when performing radiographic examination of ASME Class 1 and 2 welds and repair welds associated with the performance of ASME Section XI repair/replacement activities. More specifically, as an alternative to the penetrameter requirements of Tables NB-51 11-1 (ASME Class 1) and NC-51 11-1 (ASME Class 2) in the 1992 Edition of Section III for the performance of radiographic examinations, Entergy proposes to use wire-type penetrameters in accordance with Tables NB-51 11-1 and NC-511 1-1 of ASME Section III, 1992 Edition with 1993 Addenda.
This proposed alternative does not apply to ASME Class 3 items.
IV. BASIS FOR PROPOSED ALTERNATIVE Hole-type penetrameters are difficult to use due to placement and shim requirements.
Specifically, the use of hole-type penetrameters can be difficult because the essential T' hole is often obscured or distorted due to specimen anomalies, part geometry, or film artifacts outside the area of interest. This creates a re-shoot condition that has a negative ALARA impact due to the additional radiation exposure to the radiography crew. These characteristics make hole-type penetrameters better suited for use on flat plate and objects with a geometry such that the penetrameter hole image is not distorted. Unfortunately, these simple configurations are not typical with many nuclear piping components.
For more complex configurations, the wire-type penetrameter is superior in that it is placed directly across the area of interest, thus encompassing the object's range of density and geometry. The one-inch minimum length of the essential penetrameter wire eliminates this problem. The wire-type penetrameter provides the same function as the hole-type penetrameter by indicating a change in thickness and spatial resolution of the image without the use of shim blocks and pipe standards.
Wire-type penetrameters have been shown to provide quality and sensitivity equivalent to hole-type penetrameters as documented in Table 4 of ASME Section V, Article 22, Standard SE-747. Because of the equivalent sensitivity, the wire-type penetrameter provides equivalent results to currently required hole-type penetrameter. Therefore, the quality of the examination and resulting safety of the plant based on examination results are not impacted by this proposed alternative.
The 1992 Edition with 1993 Addenda of ASME Section 1II, which includes the provision for use of equivalent wire-type penetrameters, has been endorsed by the NRC in 10 CFR 50.55a. Furthermore, the NRC staff has approved the use of wire-type penetrameters for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, and Indian Point Energy Center, Unit 2.
In its approval of the use of wire-type penetrameters for Calvert Cliffs, the NRC staff compared performance of wire-type penetrameters to hole-type penetrameters. In its safety evaluation, the staff stated in part, "Based on the above comparison [performed by the staff] of commonly used industry references and the widespread use of wire penetrameters in industry, the staff believes that the wire penetrameters listed in Table Page 4 of 5
NB-51 11-1 (NC-5i 11-1) to the 1992 Edition with 1993 Addenda of the ASME Code will provide an acceptable level of quality and safety."
V. CONCLUSION 10 CFR 50.55a(a)(3) states:
'Proposed alternatives to the requirements of (c), (d), (e), (f), (g), and (h) of this section or portions thereof may be used when authorized by the Director of the Office of Nuclear Reactor Regulation. The applicant shall demonstrate that:
(i) The proposed alternatives would provide an acceptable level of quality and safety, or (ii) Compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety."
Entergy believes that the proposed alternative identified in Section lll.B and discussed in Section IV above provides an acceptable level of quality and safety to the repair rules as stated in References 1 and 2 and as described in Section II of this request.
Therefore, we request that the proposed alternative be authorized pursuant to 10 CFR 50.55a(a)(3)(i).
Page 5 of 5