Pages that link to "RA-23-0139, Registration for Use of General License Spent Fuel Casks"
Jump to navigation
Jump to search
The following pages link to RA-23-0139, Registration for Use of General License Spent Fuel Casks:
Displayed 50 items.
- RA-16-0009, Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 2 (← links)
- RA-15-0050, Implementation of a Duke Energy Common Quality Assurance Topical Report (← links)
- RA-16-0004, Duke Energy - Transmittal of Fleet Emergency Plan Implementing Procedure AD-EP-ALL-0202, Revision 1, Emergency Response Offsite Dose Assessment (← links)
- RA-15-0049, Duke Energy Carolinas, LLC - Commitment to Maintain Severe Accident Management Guidelines (← links)
- RA-15-0034, Duke Energy Provides NRC Correspondence Distribution List Update (← links)
- RA-15-0015, Onsite Property Insurance Coverage (← links)
- RA-15-0014, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums (← links)
- RA-15-0002, NRC Correspondence Distribution List Update (← links)
- RA-15-0005, Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees (← links)
- RA-14-0018, Request for Renewal of Quality Assurance Program Approval for Radioactive Material Packages (← links)
- RA-14-0016, Regulatory Commitments Associated with Generic Letter 2008-1, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (← links)
- RA-14-0007, Duke Energy - Onsite Property Insurance Coverage (← links)
- RA-14-0006, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums (← links)
- RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results (← links)
- RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces (← links)
- RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process (← links)
- RA-13-018, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site (← links)
- RA-13-016, Duke Energy Progress, Inc., First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RA-13-009, Duke Energy Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RA-12-039, Carolina Power & Light Company & Florida Power Corporation'S Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Eve (← links)
- RA-11-028, Withdrawal of Request for Withholding of Information in RAI Response Application for NRC Consent to Indirect License Transfer for the Proposed Merger of Duke Energy Corporation and Progress Energy Inc (← links)
- RA-18-0134, Registration for Use of General License Spent Fuel Cask Numbers 151 and 152 (← links)
- RA-18-0077, Registration for Use of General License Spent Fuel Cask Numbers 149 and 150 (← links)
- RA-18-0073, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D (← links)
- RA-10-010, Submittal of Biennial Decommissioning Funding Status Report Correction (← links)
- RA-18-0202, Transmittal for NRC Confirmatory Calculations (← links)
- RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (← links)
- RA-18-0135, Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System (← links)
- RA-18-0084, Independent Spent Fuel Storage Installation - Request Registration for Use of General License Spent Fuel Casks (← links)
- RA-18-0024, Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (← links)
- RA-18-0027, Supplement to Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material (← links)
- RA-18-0178, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ... (← links)
- RA-18-0170, Unit 1 Cycle 22 and Unit 2 Cycle 23 Core Operating Limits Reports (← links)
- RA-18-0144, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report (← links)
- RA-18-0079, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (← links)
- RA-18-0110, Request for One-Time Allowance to Submit License Amendment Request Referencing Topical Report Draft Safety Evaluation (← links)
- RA-18-0101, Unit 1 Cycle 22 and Unit 2 Cycle 23 Reload Safety Analysis Reports (← links)
- RA-18-0067, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 22 (← links)
- RA-15-0036, Annual Report of Changes Pursuant to 10 CFR 50.46 (← links)
- RA-12-015, Carolina Power & Light Company'S Answer to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) (← links)
- RA-11-009, Independent Spent Fuel Storage Installation, Crystal River, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2, Independent Spent Fuel Storage Installation - NRC Correspondence Distribution List Update (← links)
- RA-09-016, Request for Exemptions from Physical Security Requirements (← links)
- RA-09-020, NRC Correspondence Distribution List Update (← links)
- RA-19-2019, Brunswick 2019-301 Post-Exam Comments (← links)
- RA-19-0083, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation (← links)
- RA-19-0029, Revision to Radiological Emergency Response Plan Implementing Procedure (← links)
- RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature .. (← links)
- RA-18-0241, Update to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0015, Request for License Amendment: Surveillance Requirements for Safety Relief Valves (← links)