RA-15-0015, Onsite Property Insurance Coverage

From kanterella
Jump to navigation Jump to search
Onsite Property Insurance Coverage
ML15090A199
Person / Time
Site: Oconee, Mcguire, Catawba, Harris, Point Beach, Brunswick, Robinson  Duke Energy icon.png
Issue date: 03/31/2015
From: Nolan M
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-15-0015
Download: ML15090A199 (5)


Text

(~ DUKE ENERGY. M. Chri.ftilllher Nolan 526 South Church Street Charlotte, NC 28202 Mailing Atltlre.u :

Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201 -/006 704-382-7426 March 31, 2015 RA-15-0015 10 CFR 50.54(w)(3)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Catawba Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-413 and 50-414 I Renewed License Nos. NPF-35 and NPF-52 McGuire Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-369 and 50-370 I Renewed License Nos. NPF-9 and NPF-17 Oconee Nuclear Station, Unit Nos. 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 I Renewed License Nos. DPR-38, DPR-47, And DPR-55 Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400 I Renewed License No. NPF-63 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 And 50-324 I Renewed License Nos. DPR-71 and DPR-62 H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 I Renewed License No. DPR-23 Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302/ License No. DPR-72

Subject:

Onsite Property Insurance Coverage Pursuant to 10 CFR 50.54(w)(3) regarding onsite property damage insurance, Duke Energy Carolinas, Duke Energy Progress, and Duke Energy Florida hereby submit information regarding the present level and source of onsite property damage insurance for the Catawba Nuclear Station (CNS), McGuire Nuclear Station (MNS), Oconee Nuclear Station (ONS),

Shearon Harris Nuclear Power Plant (SHNPP), Brunswick Steam Electric Plant (BSEP), H.B.

Robinson Steam Electric Plant (HBRSEP), and Crystal River Unit 3 Nuclear Generating Plant.

This information is required to be submitted to the United States Nuclear Regulatory Commission by April 1 of each year.

U.S. Nuclear Regulatory Commission March 31, 2015 Page 2 Insured Site- Brunswick Company: Nuclear Electric Insurance Limited Policy No.: P15-003 (renewal date April1, 2015)

Limits: $1,500,000,000 (Primary)

Insured Site - Catawba Company: Nuclear Electric Insurance Limited Policy No.: P15-044 (renewal date April 1, 2015)

Limits: $1 ,500,000,000 (Primary)

Company: Nuclear Electric Insurance Limited Policy No.: X15-057 (renewal date April1, 2015)

Limits: $1,250,000,000 (Excess)

Insured Site - Crvstal River Company: Nuclear Electric Insurance Limited Policy No.: P15-081 (renewal date April1, 2015)

Limits: $1,060,000,000 (Primary)

Insured Site - Shearon Harris Company: Nuclear Electric Insurance Limited Policy No.: P15-004 (renewal date April1, 2015)

Limits: $1 ,500,000,000 (Primary)

Insured Site - McGuire Company: Nuclear Electric Insurance Limited Policy No.: P15-018 (renewal date April1, 2015)

Limits: $1,500,000,000 (Primary)

Insured Site -Oconee Company: Nuclear Electric Insurance Limited Policy No.: P15-019 (renewal date April1, 2015)

Limits: $1,500,000,000 (Primary)

Insured Site - Robinson Company: Nuclear Electric Insurance Limited Policy No.: P15-005 (renewal date April1, 2015)

Limits: $1,500,000,000 (Primary)

Insured Sites - Brunswick. Harris. McGuire. Oconee. Robinson Company: Nuclear Electric Insurance Limited Policy No.: BX15-013 (renewal date April 1, 2015)

Limits: $1,250,000,000 (Blanket Excess)

U.S. Nuclear Regulatory Commission March 31, 2015 Page 3 Please address any comments or questions regarding this matter to Art Zaremba at (980) 373-2062.

Sincerely,

  • ~, t#~A-W~

M. Christopher Nolan Director Nuclear Regulatory Affairs

U.S. Nuclear Regulatory Commission March 31, 2014 Page 4 xc:

V. M. McCree, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 Daniel Dorman, Region I Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia PA 19406-2713 James A. Hall, Project Manager (ONS)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 G. E. Miller, Project Manager (CNS and MNS)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Martha Barillas, NRR Project Manager (SHNPP & HBRSEP)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Michael Orenak, NRR Project Manager (Crystal River Unit 3 Nuclear Generating Plant)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 A. Hon, NRR Project Manager (BSEP)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Michelle P. Catts USNRC Resident Inspector- BSEP Joe D. Austin USNRC Resident Inspector- SHNPP James Hickey USNRC Resident Inspector - HBRSEP George Hutto USNRC Resident Inspector- CNS John Zeiler USNRC Resident Inspector- MNS

U.S. Nuclear Regulatory Commission March 31, 2014 Page 5 Eddy L. Crowe US NRC Resident Inspector- ONS