Pages that link to "PNO-II-89-067, on 890921,alert Declared Due to Loss of Audible Annunciators to Control Board.Caused by Short in Annunciator Reset Circuitry in safety-related Control Panel. Short Removed & Annunciator Operability Verified"
Jump to navigation
Jump to search
The following pages link to PNO-II-89-067, on 890921,alert Declared Due to Loss of Audible Annunciators to Control Board.Caused by Short in Annunciator Reset Circuitry in safety-related Control Panel. Short Removed & Annunciator Operability Verified:
Displayed 18 items.
- PNO-II-86-017A, on 860223,some Contamination Found on Protective Clothing & Stretcher Used to Transfer Const Worker Who Fell in Drywell.Surveys Show Contamination Confined to Single Spot (← links)
- PNO-II-88-043C, Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies (← links)
- PNO-II-88-043B, on 880722,augmented Insp Team at Brunswick Departs.Team Completed Review of Events & Associated Corrective Actions for Equipment Failures Encountered During Shutdown & DC Motor Problems (← links)
- PNO-II-88-043, on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve (← links)
- PNO-II-88-043A, on 880715,augmented Insp Team Reviewed Events & Associated Corrective Actions for Equipment Failures.All Repairs Completed on 880716 Except Testing.Request for HPCI Limiting Condition for Operation Extension Granted (← links)
- PNO-II-85-070A, on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed (← links)
- PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm (← links)
- PNO-II-80-047A, on 800326,addl Offsite Environ Samples Found No Cs-137 Radioactivity Above Reporting Levels.Contaminated Boiler Removed from Svc.Corrective Actions Confirmed by Immediate Action Ltr from Region 2 (← links)
- PNO-II-82-088, on 820728,licensee Reported Updated Info Re Failure of shaft-driven Cooling Pump on Emergency Diesel Generator 2.Caused by Sheared Cap Screws & Broken Dowel Pins in Pump Coupling.Cap Screws & Dowel Pins Replaced (← links)
- PNO-II-90-047B, on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items (← links)
- PNO-II-90-047A, provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves (← links)
- PNO-II-93-067, on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 1993 (← links)
- PNO-II-82-085, on 820628,unit Shut Down After Determining That Required Surveillance Test Not Be Performed Prior to Exceeding Limiting Condition for Operation.Shutdown of 10 Days Anticipated (← links)
- PNO-II-93-060, on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated (← links)
- PNO-II-93-050, on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed (← links)
- PNO-II-93-042, on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity (← links)
- ML20054F582 (← links)
- PNO-II-82-060, on 820527,during Inservice Insp,Pinhole Leak Discovered in 6-inch RWCU Sys Suction Piping.Reactor Defueled.Southwest Research Inst Evaluating Defective Pipe Section (← links)