Pages that link to "PNO-II-88-043, on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve"
Jump to navigation
Jump to search
The following pages link to PNO-II-88-043, on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve:
Displayed 19 items.
- PNO-II-84-069A, update to PNO-II-84-069,issued on 841010. Region II Continues to Monitor Hurricane Josephine,Centered Near Latitude 29.4 North & Longitude 72.5 West (← links)
- PNO-II-86-017A, on 860223,some Contamination Found on Protective Clothing & Stretcher Used to Transfer Const Worker Who Fell in Drywell.Surveys Show Contamination Confined to Single Spot (← links)
- PNO-II-88-043C, Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies (← links)
- PNO-II-88-043B, on 880722,augmented Insp Team at Brunswick Departs.Team Completed Review of Events & Associated Corrective Actions for Equipment Failures Encountered During Shutdown & DC Motor Problems (← links)
- ML20151H968 (redirect page) (← links)
- PNO-II-88-043A, on 880715,augmented Insp Team Reviewed Events & Associated Corrective Actions for Equipment Failures.All Repairs Completed on 880716 Except Testing.Request for HPCI Limiting Condition for Operation Extension Granted (← links)
- PNO-II-85-070A, on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed (← links)
- PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm (← links)
- PNO-II-80-047A, on 800326,addl Offsite Environ Samples Found No Cs-137 Radioactivity Above Reporting Levels.Contaminated Boiler Removed from Svc.Corrective Actions Confirmed by Immediate Action Ltr from Region 2 (← links)
- PNO-II-82-088, on 820728,licensee Reported Updated Info Re Failure of shaft-driven Cooling Pump on Emergency Diesel Generator 2.Caused by Sheared Cap Screws & Broken Dowel Pins in Pump Coupling.Cap Screws & Dowel Pins Replaced (← links)
- PNO-II-90-047B, on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items (← links)
- PNO-II-90-047A, provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves (← links)
- PNO-II-93-067, on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 1993 (← links)
- PNO-II-82-085, on 820628,unit Shut Down After Determining That Required Surveillance Test Not Be Performed Prior to Exceeding Limiting Condition for Operation.Shutdown of 10 Days Anticipated (← links)
- PNO-II-93-060, on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated (← links)
- PNO-II-93-050, on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed (← links)
- PNO-II-93-042, on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity (← links)
- ML20054F582 (← links)
- PNO-II-82-060, on 820527,during Inservice Insp,Pinhole Leak Discovered in 6-inch RWCU Sys Suction Piping.Reactor Defueled.Southwest Research Inst Evaluating Defective Pipe Section (← links)