Pages that link to "PNO-I-89-027, on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched"
Jump to navigation
Jump to search
The following pages link to PNO-I-89-027, on 890412,RCIC Injection Valves Unexpectedly Opened During Testing of Sys Logic.Discharge Check Valve Failure Also Allowed Feedwater Backleakage,Contaminating Five Workers Slightly.Augmented Insp Team Dispatched:
Displayed 21 items.
- ML20236F419 (← links)
- PNO-I-87-068, on 870727,contractor Worker Found to Be Radioactively Contaminated W/Radium.Caused by Worker Attempt to Remove Radium from Watch Dial.Licensee Decontaminated Worker & Furnished Other Health Physics Assistance (← links)
- ML20236E926 (← links)
- PNO-I-87-095, on 871015,State of Ma Atty General Jm Shannon Filed Petition Requesting Order to Show Cause Why Plant Should Not Remain Closed Until Full Adjudicatory Hearing Resolves Issues Re GE Mark I Containment & Evacuation Plans (← links)
- PNO-I-89-016, on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated (← links)
- PNO-I-89-010, on 890221,startup Transformer Tripped & Locked Out on Ground Differential Relay Actuation.Licensee Investigating Cause.Decay Heat Minimal & Reactor Water Temp Decreased About 1 F in First 3 H After Loss of Power (← links)
- PNO-I-87-090, on 870926-27,util Scheduled to Start Reloading Fuel Into Core of Plant.Plant Shutdown Since Apr 1986 for Maint & Program Improvements.Licensee Required to Obtain NRC Approval Before Restart of Reactor (← links)
- PNO-I-87-105B, on 871112,offsite Power Reestablished to Vital & Nonvital Buses Via Backfeeding Through Main & Auxiliary Transformers After Loss of Power.Loss of Power Possibly Caused by Icing in Switchyard.Switchyard Sprayed (← links)
- PNO-I-87-105A, as of 871112,offsite Power Remained Unavailable to Site.Personnel Shutdown Emergency Diesel Generator B Due to Problem W/Transformer C,Resulting in Another Shutdown Cooling Isolation.Switchyards Sprayed (← links)
- PNO-I-87-105, on 871112,plant Experienced Complete Loss of Offsite Power.Cause Associated W/Switchyard Icing Due to Adverse Weather Conditions.Licensee Continuing to Determine Cause of Loss of Offsite Power.Ice & Salt Being Removed (← links)
- PNO-I-87-104A, on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant (← links)
- PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR (← links)
- PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation (← links)
- PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release (← links)
- PNO-I-86-038A, on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days (← links)
- PNO-I-86-038, on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred (← links)
- PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage (← links)
- PNO-I-85-037A, on 850523,reactor Shutdown Initiated Due to Lubricating Oil Circulation Pump Motor Tripping on Diesel Generator B.Generator Declared Inoperable.Shutdown Will Be Terminated After Oil Circulation Pump Motor Replaced (← links)
- PNO-I-85-037, on 850516,reactor Shut Down After One of Two Diesel Generators & One of Four LPCI Pumps Found Inoperable. Cause Not Stated.Diesel Generator B Returned to Svc & LPCI Pipe Supports Repaired (← links)
- PNO-I-93-066A, demonstration to Protest Inadequacy of Plant Emergency Plan Ended About 2:00 Pm.Three Stink Bombs Introduced Into Media Center Ventilation Sys,But Did Not Interrupt Activities.No Other Untoward Occurrences Reported (← links)
- PNO-I-93-066, on 931207,licensee Security Representative in Technical Support Ctr Notified NRC Region I That Actual Demonstration Taking Place in Downtown Plymonth.No Other Interference W/Exercise Activities Identified (← links)