ML110330498: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257                 February 2, 2011  Mr. Dennis R. Madison Vice President  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513   
                February 2, 2011  
SUBJECT:  EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2011301 AND 05000366/2011301  Dear Mr. Madison:   
  Mr. Dennis R. Madison Vice President  
Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513  
   
SUBJECT:  EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2011301 AND 05000366/2011301  
  Dear Mr. Madison:  
   
In a telephone conversation on January 31, 2011, between Mr. J. Derwood Tootle - Operations Training Supervisor, Anthony Ball - Exam Developer, Charlie Edmunds - Exam Developer, and Mr. Phillip Capehart - Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Edwin I. Hatch Nuclear Plant.  The operating test is scheduled to be administered during the two weeks of June 6 and June 13, 2011.  The written examination is scheduled to be administered the week of June 20, 2011.  The on-site preparatory week is scheduled for the week of May 16, 2011.  
In a telephone conversation on January 31, 2011, between Mr. J. Derwood Tootle - Operations Training Supervisor, Anthony Ball - Exam Developer, Charlie Edmunds - Exam Developer, and Mr. Phillip Capehart - Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Edwin I. Hatch Nuclear Plant.  The operating test is scheduled to be administered during the two weeks of June 6 and June 13, 2011.  The written examination is scheduled to be administered the week of June 20, 2011.  The on-site preparatory week is scheduled for the week of May 16, 2011.  
  As agreed during the telephone conversation, your staff will prepare both the operating test, and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be  
  As agreed during the telephone conversation, your staff will prepare both the operating test, and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be  
necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by March 28, 2011.  Mr. Phillip Capehart provided the written examination outline to your  
necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
  To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by March 28, 2011.  Mr. Phillip Capehart provided the written examination outline to your  
staff on November 29, 2010.  The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201, will be due by April 20, 2011.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval.  All  
staff on November 29, 2010.  The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201, will be due by April 20, 2011.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval.  All  
materials shall be complete and ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or  
materials shall be complete and ready-to-use.  
incomplete materials, may cause the examinations to be rescheduled.   
  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or  
SNC 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  Appendix E, of NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
incomplete materials, may cause the examinations to be rescheduled.  
  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests, (if any)(OMB approval number 3150-0090), at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including  
    
SNC 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
  Appendix E, of NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
 
  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests, (if any)(OMB approval number 3150-0090), at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  This letter contains information collections that are subject to the Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including  
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  
  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).   
  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  
    
SNC 3  Thank you for your cooperation in this matter.  Mr. Derwood Tootle - Operations Training Supervisor, Anthony Ball - Exam Developer and Charlie Edmunds - Exam Developer have been advised of the policies and guidelines referenced in this letter.  If you have any questions  
SNC 3  Thank you for your cooperation in this matter.  Mr. Derwood Tootle - Operations Training Supervisor, Anthony Ball - Exam Developer and Charlie Edmunds - Exam Developer have been advised of the policies and guidelines referenced in this letter.  If you have any questions  
regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).  Sincerely,              /RA/        Malcolm T. Widmann, Chief      Operations Branch      Division of Reactor Safety   
regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).  
Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5  cc w/encl:  (See page 4)   
  Sincerely,              /RA/        Malcolm T. Widmann, Chief      Operations Branch      Division of Reactor Safety  
   
Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5  
  cc w/encl:  (See page 4)  
   
    
    
SNC 4  cc: w/encl B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
SNC 4  cc: w/encl B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
  Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
  Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
  M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  T. D. Honeycutt  
 
Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  L. Mike Stinson  
  M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution   
  T. D. Honeycutt  
R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution   
Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
E. G. Anners Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution   
  L. Mike Stinson  
Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  R. E. Varnadore  
Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution  Moanica Caston  
   
Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution   
R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
   
E. G. Anners Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
   
Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
  R. E. Varnadore  
Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution  
  Moanica Caston  
Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
  Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution  
   
Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution  
Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution  
  Chris Clark Commissioner Georgia Department of Natural Resources Electronic Mail Distribution  Lee Foley  
 
Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution  Senior Resident Inspector  
  Chris Clark Commissioner Georgia Department of Natural Resources Electronic Mail Distribution  
  Lee Foley  
Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution  
  Senior Resident Inspector  
U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA  30334  
U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA  30334  
  Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution   
 
  Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution  
   
James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution  
James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution  
  Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution  
  Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution  
  F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources  
  F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources  
Electronic Mail Distribution  (cc w/encl: continued on page 5)  
Electronic Mail Distribution  
  (cc w/encl: continued on page 5)  
SNC 5  Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources  
SNC 5  Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources  
Electronic Mail Distribution  James A. Sommerville Program Coordination Branch Chief Environmental Protection Division  
Electronic Mail Distribution  
Georgia Department of Natural Resources Electronic Mail Distribution  Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution  
  James A. Sommerville Program Coordination Branch Chief Environmental Protection Division  
Georgia Department of Natural Resources Electronic Mail Distribution  
  Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution  
 
  Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution  
  Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution  
  Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201  
  Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201  
Baxley, GA  31513  Southern Nuclear Operating Company, Inc ATTN:  Mr. Steve Grantham Training Manager  
Baxley, GA  31513  
Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513   
  Southern Nuclear Operating Company, Inc ATTN:  Mr. Steve Grantham Training Manager  
Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513  
    
    
    
SNC  3  Thank you for your cooperation in this matter.  Mr. Derwood Tootle - Operations Training Supervisor, Anthony Ball - Exam Developer and Charlie Edmunds - Exam Developer have been advised of the policies and guidelines referenced in this letter.  If you have any questions
regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).  Sincerely,       
      /RA/        Malcolm T. Widmann, Chief      Operations Branch      Division of Reactor Safety 
Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5  cc w/encl:  (See page 4) 
Distribution w/encl: C. Evans, RII EICS (Part 72 Only) L. Douglas, RII EICS (Linda Douglas) OE Mail (email address if applicable) RIDSNRRDIRS
PUBLIC RidsNrrPMHatch Resource   
X  PUBLICLY AVAILABLE G  NON-PUBLICLY AVAILABLE G  SENSITIVE        X  NON-SENSITIVE ADAMS:  X Yes ACCESSION NUMBER:  ML 110330498  X  SUNSI REVIEW COMPLETE OFFICE RII: DRS/OL RII:DRS/OL RII: DRP/BR2    SIGNATURE RA RA RA    NAME CAPEHART WIDMANN SCHAEFFER    DATE 02/02/2011 02/02/2011 02/02/2011    E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO OFFICIAL RECORD COPY          DOCUMENT NAME:  O:\HATCH EXAMINATIONS\INITIAL EXAM 2011-301\CORRESPONDENCE\HATCH 2011-301 CORPORATE NOTIFICATION LETTER REV1.DOC     


  ML 110330498  X  SUNSI REVIEW COMPLETE OFFICE RII: DRS/OL RII:DRS/OL RII: DRP/BR2    SIGNATURE
R A R A R A    NAME CAPEHART WIDMANN SCHAEFFER    DATE 02/02/2011 02/02/2011 02/02/2011
    E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO
}}
}}

Revision as of 22:02, 14 August 2018

Edwin Hatch - Notification of Licensed Operator Initial Examination 05000321-11-301 and 05000366-11-301
ML110330498
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/02/2011
From: Widmann M T
NRC/RGN-II/DRS/OLB
To: Madison D R
Southern Nuclear Operating Co
References
Download: ML110330498 (6)


See also: IR 05000321/2011301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

February 2, 2011

Mr. Dennis R. Madison Vice President

Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2011301 AND 05000366/2011301

Dear Mr. Madison:

In a telephone conversation on January 31, 2011, between Mr. J. Derwood Tootle - Operations Training Supervisor, Anthony Ball - Exam Developer, Charlie Edmunds - Exam Developer, and Mr. Phillip Capehart - Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Edwin I. Hatch Nuclear Plant. The operating test is scheduled to be administered during the two weeks of June 6 and June 13, 2011. The written examination is scheduled to be administered the week of June 20, 2011. The on-site preparatory week is scheduled for the week of May 16, 2011.

As agreed during the telephone conversation, your staff will prepare both the operating test, and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by March 28, 2011. Mr. Phillip Capehart provided the written examination outline to your

staff on November 29, 2010. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201, will be due by April 20, 2011. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

SNC 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E, of NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests, (if any)(OMB approval number 3150-0090), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

SNC 3 Thank you for your cooperation in this matter. Mr. Derwood Tootle - Operations Training Supervisor, Anthony Ball - Exam Developer and Charlie Edmunds - Exam Developer have been advised of the policies and guidelines referenced in this letter. If you have any questions

regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).

Sincerely, /RA/ Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety

Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5

cc w/encl: (See page 4)

SNC 4 cc: w/encl B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

T. D. Honeycutt

Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

L. Mike Stinson

Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

E. G. Anners Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

R. E. Varnadore

Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution

Moanica Caston

Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution

Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution

Chris Clark Commissioner Georgia Department of Natural Resources Electronic Mail Distribution

Lee Foley

Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 30334

Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution

James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources

Electronic Mail Distribution

(cc w/encl: continued on page 5)

SNC 5 Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources

Electronic Mail Distribution

James A. Sommerville Program Coordination Branch Chief Environmental Protection Division

Georgia Department of Natural Resources Electronic Mail Distribution

Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution

Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution

Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201

Baxley, GA 31513

Southern Nuclear Operating Company, Inc ATTN: Mr. Steve Grantham Training Manager

Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

ML 110330498 X SUNSI REVIEW COMPLETE OFFICE RII: DRS/OL RII:DRS/OL RII: DRP/BR2 SIGNATURE

R A R A R A NAME CAPEHART WIDMANN SCHAEFFER DATE 02/02/2011 02/02/2011 02/02/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO