{{#Wiki_filter: UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511       March 20, 2013   
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
        March 20, 2013  
    
   
   
Mr. Edward D. Halpin  
Mr. Edward D. Halpin  
Senior Vice President and  Chief Nuclear Officer Pacific Gas and Electric Company  
Senior Vice President and  
   Chief Nuclear Officer Pacific Gas and Electric Company  
 
Diablo Canyon Power Plant  
Diablo Canyon Power Plant  
P.O. Box 56, Mail Code 104/6  
P.O. Box 56, Mail Code 104/6  
Avila Beach, CA  93424   
 
SUBJECT: DIABLO CANYON POWER PLANT UNITS 1 AND 2 - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000275/2013003,  
Avila Beach, CA  93424  
05000323/2013003) AND REQUEST FOR INFORMATION  Dear Mr. Halpin:   
    
SUBJECT: DIABLO CANYON POWER PLANT UNITS 1 AND 2 - NOTIFICATION OF  
INSPECTION (NRC INSPECTION REPORT 05000275/2013003,  
05000323/2013003) AND REQUEST FOR INFORMATION  
  Dear Mr. Halpin:  
   
From May 20-24, 2013, inspectors from the U.S. Nuclear Regulatory Commission's (NRC)  
From May 20-24, 2013, inspectors from the U.S. Nuclear Regulatory Commission's (NRC)  
Region IV office will perform the baseline biennial requalification inspection at Diablo Canyon  
Region IV office will perform the baseline biennial requalification inspection at Diablo Canyon  
Power Plant Units 1 and 2, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program."  Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for  
 
Power Plant Units 1 and 2, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program."  Experience has shown that this inspection is a resource intensive  
inspection both for the NRC inspectors and your sta
ff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for  
documents needed for this inspection.  These documents have been divided into three groups.   
documents needed for this inspection.  These documents have been divided into three groups.   
The first group (Section A of the enclosure) identifies information to be provided prior to the  
The first group (Section A of the enclosure) identifies information to be provided prior to the  
inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.  The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site.  It is important that  
inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.  The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site.  It is important that  
all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.   
all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
   
We have discussed the schedule for these inspection activities with your staff and understand  
We have discussed the schedule for these inspection activities with your staff and understand  
that our regulatory contact for this inspection will be Mr. John Becerra of your training  
that our regulatory contact for this inspection will be Mr. John Becerra of your training  
organization.  Our inspection dates are subject to change based on your updated schedule of examination activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector Thomas Farina at 817-200-1117  
organization.  Our inspection dates are subject to change based on your updated schedule of examination activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector Thomas Farina at 817-200-1117  
(thomas.farina@nrc.gov) or Brian Larson at (817) 200-1172 (brian.larson@nrc.gov).   
 
(thomas.farina@nrc.gov) or Brian Larson at (817) 200-1172 (brian.larson@nrc.gov
).   
    
    
E. Halpin - 2 -   
E. Halpin - 2 -  
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018.  The NRC may not conduct or sponsor, and a person is not required to  
   
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Offi
ce of Management and Budget, control number 3150-0018.  The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget control number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
requesting document displays a currently valid Office of Management and Budget control  
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document  
number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).   
 
enclosure will be available electr
onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document  
 
system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).  
   
  Sincerely,  
  Sincerely,  
   
   
Line 49: Line 72:
  Operations Branch   
  Operations Branch   
  Division of Reactor Safety  
  Division of Reactor Safety  
Docket:  05000275; 05000323 License:  DPR-80; DPR-82
   
   
Docket:  05000275; 05000323 License:  DPR-80; DPR-82 
Enclosure:  
Enclosure:  
Biennial Requalification Inspection Document Request  
Biennial Requalification Inspection Document Request  
    
    
E. Halpin - 3 -   
E. Halpin - 3 -  
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov)  Deputy Regional Administrator (Robert.Lewis@nrc.gov)  DRP Director (Kriss.Kennedy@nrc.gov)  Acting DRP Deputy Director (Michael.Scott@nrc.gov)  DRS Director (Tom.Blount@nrc.gov)  Acting DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Thomas.Hipschman@nrc.gov)    Resident Inspector (Laura.Micewski@nrc.gov)  Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)  Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)  Project Engineer, DRP/B (David.You@nrc.gov)  DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)  Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)  Project Manager (Joseph.Sebrosky@nrc.gov)  Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)  RITS Coordinator (Marisa.Herrera@nrc.gov)  Regional Counsel (Karla.Fuller@nrc.gov)  Technical Support Assistant (Loretta.Williams@nrc.gov)  Congressional Affairs Officer (Jenny.Weil@nrc.gov)   
   
Electronic distribution by RIV:  
Regional Administrator (Elmo.Collins@nrc.gov)  Deputy Regional Administrator (Robert.Lewis@nrc.gov)  DRP Director (Kriss.Kennedy@nrc.gov)  Acting DRP Deputy Director (Michael.Scott@nrc.gov)  DRS Director (Tom.Blount@nrc.gov)  Acting DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Thomas.Hipschman@nrc.gov)    Resident Inspector (Laura.Micewski@nrc.gov)  Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)  Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)  Project Engineer, DRP/B (David.You@nrc.gov)  DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)  Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)  Project Manager (Joseph.Sebrosky@nrc.gov)  Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)  RITS Coordinator (Marisa.Herrera@nrc.gov)  Regional Counsel (Karla.Fuller@nrc.gov)  Technical Support Assistant (Loretta.Williams@nrc.gov)  Congressional Affairs Officer (Jenny.Weil@nrc.gov)   
    
    
   
   
Line 65: Line 93:
    
    
   
   
SUNSI Review Completed:  ___Y___ ADAMS:  Yes  No        Initials: VGG_     Publicly Available        Non-Publicly Available        Sensitive    Non-Sensitive  ML13080A408    SOE:OB C:OB    TFarina VGaddy    /RA/ /RA/    3/20/13 3/20/13    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax  S:\DRS\REPORTS\Reports Drafts\DC 2013 BRQ RFI Letter.docx   
SUNSI Review Completed:  ___Y___ ADAMS:  Yes  No        Initials: VGG
   - 1 - Enclosure BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST  From: Thomas Farina Operations Engineer, NRC RIV  
_     Publicly Available        Non-Publicly Available        Sensitive    Non-Sensitive  
   ML13080A408    SOE:OB C:OB    TFarina VGaddy    /RA/ /RA/    3/20/13 3/20/13    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax  
  S:\DRS\REPORTS\Reports Drafts\DC 2013 BRQ RFI Letter.docx   
   - 1 - Enclosure BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST  
  From: Thomas Farina  
Operations Engineer, NRC RIV  
 
817-200-1117  
817-200-1117  
  To: John Becerra Exam Development and Simulator Support Supervisor, Diablo Canyon Power Plant 805-545-4006   
 
Subj: Information Request to Support May 20 - 24, 2013, Licensed Operator Requalification Program Inspection (IP 71111.11B)   
  To: John Becerra Exam Development and Simulator Support  
Supervisor, Diablo Canyon Power Plant  
805-545-4006  
   
Subj: Information Request to Support May 20 - 24, 2013, Licensed Operator Requalification Program Inspection (IP 71111.11B)  
   
A. The following information is requested in order to support inspection preparation activities.  These items are listed by section as they appear in the inspection module  
A. The following information is requested in order to support inspection preparation activities.  These items are listed by section as they appear in the inspection module  
(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or  
(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or  
hardcopy in order to arrive at the Region IV office no later than May 10, 2013.  * Electronically to:    thomas.farina@nrc.gov   cc:  brian.larson@nrc.gov       duane.strickland@nrc.gov   * Hardcopy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011  
hardcopy in order to arrive at the Region IV office no later than May 10, 2013.  
ATTN:  Thomas Farina  General Requests: * List of licensed operators (SRO & RO) by crew (operating & staff) * Training and Operations Department organization charts (with qualified LOR evaluators identified) * Procedures that identify process for revising and maintaining LO continuing training program up to date * List of outstanding LOR program changes * List of plant events and industry operating experience incorporated into LOR program since last BRQ * Audits and/or self-assessment reports addressing the licensed operator requalification training program * Last two years of simulator review committee (or equivalent) meeting minutes * Last two years of CRC (or equivalent) meeting minutes  02.03:  Biennial Requalification Written Examination Quality * The current and approved biennial written examination schedule  * The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.   
  * Electronically to:    thomas.farina@nrc.gov
   - 2 - Enclosure * All written examinations that have been approved for administration up to and including the week before the inspection team is onsite.  This will need to have adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021.  * The current requalification cycle examination methodology (sample plan)  02.04:  Annual Requalification Operating Test Quality * The schedule for the operating tests (JPMs & scenarios) to be given the week of May 20, 2013. * The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of May 20, 2013. * Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite. * All of the previous year's NRC required annual operating tests.  * Current requalification cycle operating test methodology (sample plan) * All portions of the UFSAR that identify operator response times for time critical operator actions  02.05:  Licensee Admin of Requal Exams * All procedures used to administer the annual operating test * All procedures used to assess operator performance * All procedures that describe conduct of simulator training * All Procedures used to test, operate, and maintain the simulator  02.06:  Requalification Examination Security * Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.  * Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc) on a periodic basis. * All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations * List of all Condition Reports since the last biennial requal inspection related to examination security and overlap  02.07:  Licensee Remedial Training Program * List of remedial training conducted or planned since last requal exams (includes training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam cycle) * Remediation plans (lesson plans, reference materials, and attendance documentation)   
  cc:  brian.larson@nrc.gov
        duane.strickland@nrc.gov
  * Hardcopy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011  
 
ATTN:  Thomas Farina  
  General Requests:
* List of licensed operators (SRO & RO) by crew (operating & staff)  
* Training and Operations Department organization charts (with qualified LOR evaluators identified)  
* Procedures that identify process for revising and maintaining LO continuing training  
program up to date  
* List of outstanding LOR program changes  
* List of plant events and industry operating experience incorporated into LOR  
program since last BRQ  
* Audits and/or self-assessment reports addressing the licensed operator requalification training program  
* Last two years of simulator review committee (or equivalent) meeting minutes  
* Last two years of CRC (or equivalent) meeting minutes  
  02.03:  Biennial Requalification Written Examination Quality
* The current and approved biennial written examination schedule   
* The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.   
   - 2 - Enclosure  
* All written examinations that have been approved for administration up to and including the week before the inspection team is onsite.  This will need to have adequate password protection if e-mailed or double envelope protection if mailed via  
regular mail per NUREG-1021.   
* The current requalification cycle examination methodology (sample plan)  
  02.04:  Annual Requalification Operating Test Quality
* The schedule for the operating tests (JPMs & scenarios) to be given the week of May 20, 2013.  
* The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of May 20, 2013.  
* Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite.  
* All of the previous year's NRC required annual operating tests.   
* Current requalification cycle operating test methodology (sample plan)  
* All portions of the UFSAR that identify operator response times for time critical operator actions  
  02.05:  Licensee Admin of Requal Exams
* All procedures used to administer the annual operating test  
* All procedures used to assess operator performance  
* All procedures that describe conduct of simulator training  
* All Procedures used to test, operate, and maintain the simulator  
  02.06:  Requalification Examination Security
* Submit any tracking tools that you use  
as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.   
* Submit any tracking tools that you use  
as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc) on a periodic basis.  
* All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations  
in current exam cycle tests and prior year examinations  
* List of all Condition Reports since the last biennial requal inspection related to examination security and overlap  
  02.07:  Licensee Remedial Training Program
* List of remedial training conducted or planned since last requal exams (includes training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam cycle) * Remediation plans (lesson plans, reference materials, and attendance  
documentation)  
   
    
    
   - 3 - Enclosure  02.08:  Conformance with Operator License Conditions * All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators * All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection  02.09:  Simulator Performance * All Simulator Management and Configuration Procedures if not already provided for section 02.05 above. * Simulator Discrepancy Report summary list for all open DR's. For closed DR's, summary list for those items closed between April 8, 2011 and May 19, 2013.   02.10:  Problem Identification and Resolution * A summary report of all condition reports related to operator actions/errors in the control room * Any revised requalification training that was based on licensed operator performance issues   
   - 3 - Enclosure  
  02.08:  Conformance with Operator License Conditions
* All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators  
* All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection  
  02.09:  Simulator Performance
* All Simulator Management and Configuration Procedures if not already provided for section 02.05 above.  
* Simulator Discrepancy Report  
summary list for all open DR's. For closed DR's, summary list for those items closed between April 8, 2011 and May 19, 2013.
02.10:  Problem Identification and Resolution
* A summary report of all condition reports related to operator actions/errors in the  
control room  
* Any revised requalification training that was based on licensed operator performance  
issues   
B. The following information is requested in order to support the onsite inspection activities.  Requested materials should be available to the inspection team, either  
B. The following information is requested in order to support the onsite inspection activities.  Requested materials should be available to the inspection team, either  
electronically or hardcopy, upon site arrival on May 20, 2013.  02.02:  Exam Results  /  02.03 and 02.04:  Written Exam and Op Test Quality * All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after onsite week * All results up to the day the team leaves the site.   02.08:  Conformance with Operator License Conditions * Access to licensed operators' records (operating and staff crews) * Access to licensed operators' training attendance records * Access to licensed operators' medical records  02.09:  Simulator Performance * Simulator discrepancies (DR's) from April 8, 2011 to May 19, 2013.  This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.  * Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available). * Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant.  * All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this) * Summary list of modifications from April 8, 2011 to May 19, 2013. * Plant Modifications (both hardware and software) completed on the Simulator by due date from April 8, 2011 to May 19, 2013. * Simulator Differences Lesson plan used in training (current to May 19, 2013).   
electronically or hardcopy, upon site arrival on May 20, 2013.  
   - 4 - Enclosure * The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the  
  02.02:  Exam Results  /  02.03 and 02.04:  Written Exam and Op Test Quality
* All Operating tests (JPMs & scenarios)
to be given in all subsequent weeks after  
onsite week  
* All results up to the day the team leaves the site.
02.08:  Conformance with Operator License Conditions
* Access to licensed operators' records (operating and staff crews)  
* Access to licensed operators' training attendance records  
* Access to licensed operators' medical records  
  02.09:  Simulator Performance
* Simulator discrepancies (DR's) from April 8, 2011 to May 19, 2013.  This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.   
* Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available).  
* Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant.   
* All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this)  
* Summary list of modifications from April 8, 2011 to May 19, 2013.  
* Plant Modifications (both hardware and software) completed on the Simulator by due date from April 8, 2011 to May 19, 2013.  
* Simulator Differences Lesson plan used in training (current to May 19, 2013).   
   - 4 - Enclosure  
* The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the  
test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the  
test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the  
ANSI 3.5 standard requirements. * All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and  
 
the acceptance criteria with results. * All Simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  02.10:  Problem Identification and Resolution * All condition reports related to operator actions/errors in the control room  C. Diablo Canyon Power Plant is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional  
ANSI 3.5 standard requirements.  
* All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and  
the acceptance criteria with results.  
* All Simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc.  
* Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  
  02.10:  Problem Identification and Resolution
* All condition reports related to operator actions/errors in the control room  
  C. Diablo Canyon Power Plant is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional  
office lead inspector for this inspection for final review and comparison against the  
office lead inspector for this inspection for final review and comparison against the  
Significance Determination Tools in order to communicate the exit results for the inspection.
Significance Determination Tools in order to communicate the exit results for the  
 
inspection.
}}
}}

Revision as of 08:29, 18 July 2018

Diablo Canyon Power Plant Units 1 and 2 - Notification of Inspection (NRC Inspection Report 05000275-13-003, 05000323-13-003) and Request for Information
ML13080A408
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/20/2013
From: Vincent Gaddy
Operations Branch IV
To: Halpin E D
Pacific Gas & Electric Co
References
IR-13-003
Download: ML13080A408 (7)


See also: IR 05000275/2013003

Text

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

March 20, 2013

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT UNITS 1 AND 2 - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000275/2013003,

05000323/2013003) AND REQUEST FOR INFORMATION

Dear Mr. Halpin:

From May 20-24, 2013, inspectors from the U.S. Nuclear Regulatory Commission's (NRC)

Region IV office will perform the baseline biennial requalification inspection at Diablo Canyon

Power Plant Units 1 and 2, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive

inspection both for the NRC inspectors and your sta

ff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for

documents needed for this inspection. These documents have been divided into three groups.

The first group (Section A of the enclosure) identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. It is important that

all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. John Becerra of your training

organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Thomas Farina at 817-200-1117

(thomas.farina@nrc.gov) or Brian Larson at (817) 200-1172 (brian.larson@nrc.gov

).

E. Halpin - 2 -

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Offi

ce of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electr

onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 05000275; 05000323 License: DPR-80; DPR-82

Enclosure:

Biennial Requalification Inspection Document Request

E. Halpin - 3 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Robert.Lewis@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRP Deputy Director (Michael.Scott@nrc.gov) DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hipschman@nrc.gov) Resident Inspector (Laura.Micewski@nrc.gov) Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov) Project Engineer, DRP/B (David.You@nrc.gov) DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Joseph.Sebrosky@nrc.gov) Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

SUNSI Review Completed: ___Y___ ADAMS: Yes No Initials: VGG

_ Publicly Available Non-Publicly Available Sensitive Non-Sensitive

ML13080A408 SOE:OB C:OB TFarina VGaddy /RA/ /RA/ 3/20/13 3/20/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

S:\DRS\REPORTS\Reports Drafts\DC 2013 BRQ RFI Letter.docx

- 1 - Enclosure BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

From: Thomas Farina

Operations Engineer, NRC RIV

817-200-1117

To: John Becerra Exam Development and Simulator Support

Supervisor, Diablo Canyon Power Plant

805-545-4006

Subj: Information Request to Support May 20 - 24, 2013, Licensed Operator Requalification Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation activities. These items are listed by section as they appear in the inspection module

(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than May 10, 2013.

  • Electronically to: thomas.farina@nrc.gov

cc: brian.larson@nrc.gov

duane.strickland@nrc.gov

  • Hardcopy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011

ATTN: Thomas Farina

General Requests:

  • List of licensed operators (SRO & RO) by crew (operating & staff)
  • Training and Operations Department organization charts (with qualified LOR evaluators identified)
  • Procedures that identify process for revising and maintaining LO continuing training

program up to date

  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR

program since last BRQ

  • Audits and/or self-assessment reports addressing the licensed operator requalification training program
  • Last two years of simulator review committee (or equivalent) meeting minutes
  • Last two years of CRC (or equivalent) meeting minutes

02.03: Biennial Requalification Written Examination Quality

  • The current and approved biennial written examination schedule
  • The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.

- 2 - Enclosure

  • All written examinations that have been approved for administration up to and including the week before the inspection team is onsite. This will need to have adequate password protection if e-mailed or double envelope protection if mailed via

regular mail per NUREG-1021.

  • The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

  • The schedule for the operating tests (JPMs & scenarios) to be given the week of May 20, 2013.
  • The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of May 20, 2013.
  • Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite.
  • All of the previous year's NRC required annual operating tests.
  • Current requalification cycle operating test methodology (sample plan)

02.05: Licensee Admin of Requal Exams

  • All procedures used to administer the annual operating test
  • All procedures used to assess operator performance
  • All procedures that describe conduct of simulator training
  • All Procedures used to test, operate, and maintain the simulator

02.06: Requalification Examination Security

  • Submit any tracking tools that you use

as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.

  • Submit any tracking tools that you use

as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc) on a periodic basis.

  • All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all Condition Reports since the last biennial requal inspection related to examination security and overlap

02.07: Licensee Remedial Training Program

  • List of remedial training conducted or planned since last requal exams (includes training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam cycle) * Remediation plans (lesson plans, reference materials, and attendance

documentation)

- 3 - Enclosure

02.08: Conformance with Operator License Conditions

  • All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators
  • All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection

02.09: Simulator Performance

  • All Simulator Management and Configuration Procedures if not already provided for section 02.05 above.
  • Simulator Discrepancy Report

summary list for all open DR's. For closed DR's, summary list for those items closed between April 8, 2011 and May 19, 2013.

02.10: Problem Identification and Resolution

  • A summary report of all condition reports related to operator actions/errors in the

control room

  • Any revised requalification training that was based on licensed operator performance

issues

B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on May 20, 2013.

02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality

  • All Operating tests (JPMs & scenarios)

to be given in all subsequent weeks after

onsite week

  • All results up to the day the team leaves the site.

02.08: Conformance with Operator License Conditions

  • Access to licensed operators' records (operating and staff crews)
  • Access to licensed operators' training attendance records
  • Access to licensed operators' medical records

02.09: Simulator Performance

  • Simulator discrepancies (DR's) from April 8, 2011 to May 19, 2013. This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.
  • Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available).
  • Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant.
  • All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this)
  • Summary list of modifications from April 8, 2011 to May 19, 2013.
  • Plant Modifications (both hardware and software) completed on the Simulator by due date from April 8, 2011 to May 19, 2013.
  • Simulator Differences Lesson plan used in training (current to May 19, 2013).

- 4 - Enclosure

  • The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the

test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the

ANSI 3.5 standard requirements.

  • All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

  • All Simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc.
  • Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

02.10: Problem Identification and Resolution

  • All condition reports related to operator actions/errors in the control room

C. Diablo Canyon Power Plant is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional

office lead inspector for this inspection for final review and comparison against the

Significance Determination Tools in order to communicate the exit results for the

inspection.