==Subject:==
==Subject:==
 
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR).
This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.
This oversight has been entered into the Exelon Corrective Action Program.
This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator  
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator  
-Region I NRC Senior Resident Inspector  
-Region I NRC Senior Resident Inspector  
-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)
-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)
Line 31: Line 28:


==Subject:==
==Subject:==
 
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR).
This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.
Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.
The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.
This oversight has been entered into the Exelon Corrective Action Program.
This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator  
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator  
-Region I NRC Senior Resident Inspector  
-Region I NRC Senior Resident Inspector  
-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)}}
-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)}}

Revision as of 10:23, 8 July 2018

Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 - Annual Radioactive Effluent Release Report 58, January 1, 2015 Through December 31, 2015
ML16145A326
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/24/2016
From: Navin P D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of New Reactors
References
CCN: 16-51
Download: ML16145A326 (1)


Text

Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4

Subject:

Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.

Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.

The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.

This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator

-Region I NRC Senior Resident Inspector

-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)

Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4

Subject:

Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.

Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.

The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.

This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator

-Region I NRC Senior Resident Inspector

-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)