ML17018A123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:January 17, 2017   MEMORANDUM TO:
{{#Wiki_filter:January 17, 201 7   MEMORANDUM TO:
Kriss M. Kennedy, Regional Administrator THRU:    Troy W. Pruett, Director        /RA/  Division of Reactor Projects FROM:    Geoffrey B. Miller, Chief  /RA/  Project Branch D
Kriss M. Kennedy, Regional Administrator THRU:    Troy W. Pruett, Director        /RA/  Division of Reactor Projects FROM:    Geoffrey B. Miller, Chief  /RA/  Project Branch D


Line 26: Line 26:


===8.3 evaluation===
===8.3 evaluation===
for determining that a Special Inspection Team inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator
for determining that a Special Inspection T eam inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator
. Concur with Recommendation:
. Concur with Recommendation:
                 /RA/  1/17/17  Kriss M. Kennedy Date  Regional Administrator
                 /RA/  1/17/17  Kriss M. Kennedy Date  Regional Administrator


Enclosure s: MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)
Enclosure s: MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)
CONTACT:  Geoffrey B. Miller 817-200-1173  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
CONTACT:  Geoffrey B. Miller           817-200-1173  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
-4511   
-4511   


ML17018A123 SUNSI Review By:  JLD ADAMS  Yes  No  Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP  NAME JDixon DLoveless GMiller AVegel TPruett  SIGNATURE
ML17018A123 SUNSI Review By:  JLD ADAMS  Yes  No  Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP  NAME JDixon DLoveless GMiller AVegel TPruett  SIGNATURE /RA Geoff Miller for
/RA Geoff Miller for
/ /RA/ /RA/ /RA/ /RA/  DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17}}
/ /RA/ /RA/ /RA/ /RA/  DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17}}

Revision as of 02:41, 8 July 2018

Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure
ML17018A123
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/17/2017
From: Miller G B
NRC/RGN-IV/DRP/RPB-D
To: Kennedy K M
Region 4 Administrator
Miller G B
References
MD 8.3
Download: ML17018A123 (5)


Text

January 17, 201 7 MEMORANDUM TO:

Kriss M. Kennedy, Regional Administrator THRU: Troy W. Pruett, Director /RA/ Division of Reactor Projects FROM: Geoffrey B. Miller, Chief /RA/ Project Branch D

SUBJECT:

MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE

Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation

, and Documentation for Power Reactors," the enclosed table provides the Management Directive

8.3 evaluation

for determining that a Special Inspection T eam inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator

. Concur with Recommendation:

/RA/ 1/17/17 Kriss M. Kennedy Date Regional Administrator

Enclosure s: MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)

CONTACT: Geoffrey B. Miller 817-200-1173 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011

-4511

ML17018A123 SUNSI Review By: JLD ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP NAME JDixon DLoveless GMiller AVegel TPruett SIGNATURE /RA Geoff Miller for

/ /RA/ /RA/ /RA/ /RA/ DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17