| {{#Wiki_filter:/ za 1 4300 Winfield Road Warrenville, IL 60555 ., Exelon.Generation 630 657 2000 Office RS-17-117 August17,2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 1 O CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f) Quad Cities Nuclear Power Station, Units 1 and 2 | | {{#Wiki_filter:/ za 1 4300 Winfield Road Warrenville, IL 60555 ., Exelon.Generation 630 657 2000 Office RS-17-117 August17,2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 1 O CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f) |
| | Quad Cities Nuclear Power Station, Units 1 and 2 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53 Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 1 O CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting the Emergency Plan Addendum revision listed in the table below for the Quad Cities Nuclear Power Station (Quad Cities). Document Revision Title EP-AA-1006, Addendum 3 4 Emergency Action Levels tor Quad Cities Station The changes to the Emergency Plan Addendum were evaluated under the requirements of 1 O CFR 50.54(q) and were determined not to result in a .. reduction in the effectiveness of the Emergency Plans for Quad Cities. This notification is being submitted within 30 days of implementation of the changes as required by 1 O CFR 50.54(q)(5). The changes continue to meet th.e applicable planning standards established in 1 O CFR 50.47(b) and 1 O CFR 50, Appendix E. In addition, as required by 1 O CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1 ). This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management. N1-1ss,-i& ;Jll-1JfvfSS U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRC Docket Nos. 50-254, 50-265, and 72-53 August 17, 2017 Page2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter. There are no regulatory commitments in this submittal. If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557. Respectfully, .. M. Imburgia Manager, Licensing Programs Exelon Generation Company, LLC Attachments: 1 ) 2) 1 O CFR 50.54(q)(5) Procedure Change Summary Analysis EP-AA-1006, Addendum 3, Revision 4, "Emergency Action Levels for Quad Cities Station" cc: w/ Attachment 1 only Regional Administrator -NRC Region Ill Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector -Quad Cities Nuclear Power Station NRC Project Manager, NRR -Quad Cities Nuclear Power Station Illinois Emergency Management Agency -Division of Nuclear Safety}} | | |
| | Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53 Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 1 O CFR 50.4(b)(5), |
| | "Emergency Plan and related submissions," |
| | Exelon Generation |
| | : Company, LLC (Exelon) is submitting the Emergency Plan Addendum revision listed in the table below for the Quad Cities Nuclear Power Station (Quad Cities). |
| | Document Revision Title EP-AA-1006, Addendum 3 4 Emergency Action Levels tor Quad Cities Station The changes to the Emergency Plan Addendum were evaluated under the requirements of 1 O CFR 50.54(q) and were determined not to result in a .. reduction in the effectiveness of the Emergency Plans for Quad Cities. This notification is being submitted within 30 days of implementation of the changes as required by 1 O CFR 50.54(q)(5). |
| | The changes continue to meet th.e applicable planning standards established in 1 O CFR 50.47(b) and 1 O CFR 50, Appendix E. In addition, as required by 1 O CFR 50.54(q)(5), |
| | this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1 ). This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f), |
| | which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management. |
| | N1-1ss,-i& |
| | ;Jll-1JfvfSS U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRC Docket Nos. 50-254, 50-265, and 72-53 August 17, 2017 Page2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter. There are no regulatory commitments in this submittal. |
| | If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557. |
| | Respectfully, |
| | .. M. Imburgia |
| | : Manager, Licensing Programs Exelon Generation |
| | : Company, LLC Attachments: 1 ) 2) 1 O CFR 50.54(q)(5) |
| | Procedure Change Summary Analysis EP-AA-1006, Addendum 3, Revision 4, "Emergency Action Levels for Quad Cities Station" cc: w/ Attachment 1 only Regional Administrator |
| | -NRC Region Ill Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector |
| | -Quad Cities Nuclear Power Station NRC Project Manager, NRR -Quad Cities Nuclear Power Station Illinois Emergency Management Agency -Division of Nuclear Safety}} |
|
---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARRS-22-069, Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station2022-05-25025 May 2022 Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station RS-22-056, Constellation Radiological Emergency Plan Addendum Revision2022-04-21021 April 2022 Constellation Radiological Emergency Plan Addendum Revision ML20342A3842020-12-0303 December 2020 Radiological Emergency Plan Addendum Revision RS-19-022, License Amendment Request - Clarifying Changes for Certain Emergency Action Levels Based on Emergency Preparedness Program Frequently Asked Questions (Epfaqs)2019-03-0101 March 2019 License Amendment Request - Clarifying Changes for Certain Emergency Action Levels Based on Emergency Preparedness Program Frequently Asked Questions (Epfaqs) ML18117A0102018-04-19019 April 2018 Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML18053A1782018-01-31031 January 2018 Attachment 6B - Quad Cities Clean Emergency Plan EP-AA-1000 Pages RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements ML18053A1772018-01-31031 January 2018 Attachment 6A - Quad Cities - Marked-up Emergency Plan EP-AA-1000 Pages ML18053A1852018-01-31031 January 2018 Enclosure 6 - Quad Cities - Evaluation of Proposed Changes ML18053A1902018-01-31031 January 2018 Enclosure 9 - Information Related to Review of Proposed Changes by the State RS-17-170, Company Emergency Plan Annex and Addendum Revisions2017-12-19019 December 2017 Company Emergency Plan Annex and Addendum Revisions RS-17-117, Radiological Emergency Plan Addendum Revision2017-08-17017 August 2017 Radiological Emergency Plan Addendum Revision RS-17-117, Exelon Nuclear Radiological Emergency Plan Addendum Revision2017-08-17017 August 2017 Exelon Nuclear Radiological Emergency Plan Addendum Revision RS-16-245, Radiological Emergency Plan Revisions2016-12-0909 December 2016 Radiological Emergency Plan Revisions RS-16-059, Quad Cities, Units 1 and 2 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision2016-03-28028 March 2016 Quad Cities, Units 1 and 2 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision RS-16-059, EP-AA-1006, Addendum 3, Revision 2, Emergency Action Levels for Quad Cities Station.2016-03-28028 March 2016 EP-AA-1006, Addendum 3, Revision 2, Emergency Action Levels for Quad Cities Station. ML16088A3992016-03-28028 March 2016 Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision ML14164A0762014-05-30030 May 2014 Attachment 10: Discussion of Revision to the Radiological Emergency Plan Annex for Quad Cities Nuclear Power Station, Cover Through Page QC 3-68 RA-14-032, Attachment 10: Discussion of Revision to the Radiological Emergency Plan Annex for Quad Cities Nuclear Power Station, Page QC 3-69 Through End2014-05-30030 May 2014 Attachment 10: Discussion of Revision to the Radiological Emergency Plan Annex for Quad Cities Nuclear Power Station, Page QC 3-69 Through End ML12263A3722012-09-0606 September 2012 Submittal of Final After Action Report/Improvement Plan, Radiological Emergency Preparedness Program 2022-05-25
[Table view] Category:Letter
MONTHYEARIR 05000254/20230042024-02-0505 February 2024 Integrated Inspection Report 05000254/2023004 and 05000265/2023004 ML24004A0052024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval IR 05000254/20234032023-12-22022 December 2023 Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 IR 05000254/20230102023-12-20020 December 2023 Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) ML23319A3342023-11-20020 November 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000254/20230032023-11-0909 November 2023 Integrated Inspection Report 05000254/2023003 and 05000265/2023003 RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230112023-09-20020 September 2023 Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities2023-08-14014 August 2023 Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities IR 05000254/20230022023-08-0808 August 2023 Integrated Inspection Report 05000254/2023002 and 05000265/2023002 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23216A0562023-08-0404 August 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 SVP-23-031, Regulatory Commitment Change Summary Report2023-07-14014 July 2023 Regulatory Commitment Change Summary Report ML23181A1062023-06-30030 June 2023 Postponement- Information Meeting (Open House) with a Question-And-Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23179A1932023-06-28028 June 2023 07122023 Letter-Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year IR 05000254/20234012023-06-26026 June 2023 Cyber Security Inspection Report 05000254/2023401 and 05000265/2023401 IR 05000265/20230402023-06-22022 June 2023 Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167B1722023-06-16016 June 2023 95001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment Letter RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23144A3632023-05-26026 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23033A4042023-05-15015 May 2023 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter IR 05000254/20234022023-05-15015 May 2023 Security Baseline and ISFSI Inspection Reports 05000254/2023402, 05000265/2023402, 07200053/2023401 ML23132A2022023-05-12012 May 2023 Annual Radiological Environmental Operating Report ML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230012023-05-0808 May 2023 Integrated Report 05000254/2023001 and 05000265/2023001 RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell SVP-23-018, Radioactive Effluent Release Report for 20222023-04-28028 April 2023 Radioactive Effluent Release Report for 2022 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23110A0622023-04-25025 April 2023 Transmittal of Final Quad Cities Nuclear Power Plant, Unit 1 Accident Sequence Precursor Report (Licensee Event Report 254-2022-001) ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration 2024-02-05
[Table view] |
Text
/ za 1 4300 Winfield Road Warrenville, IL 60555 ., Exelon.Generation 630 657 2000 Office RS-17-117 August17,2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 1 O CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)
Quad Cities Nuclear Power Station, Units 1 and 2
Subject:
Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53 Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 1 O CFR 50.4(b)(5),
"Emergency Plan and related submissions,"
Exelon Generation
- Company, LLC (Exelon) is submitting the Emergency Plan Addendum revision listed in the table below for the Quad Cities Nuclear Power Station (Quad Cities).
Document Revision Title EP-AA-1006, Addendum 3 4 Emergency Action Levels tor Quad Cities Station The changes to the Emergency Plan Addendum were evaluated under the requirements of 1 O CFR 50.54(q) and were determined not to result in a .. reduction in the effectiveness of the Emergency Plans for Quad Cities. This notification is being submitted within 30 days of implementation of the changes as required by 1 O CFR 50.54(q)(5).
The changes continue to meet th.e applicable planning standards established in 1 O CFR 50.47(b) and 1 O CFR 50, Appendix E. In addition, as required by 1 O CFR 50.54(q)(5),
this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1 ). This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),
which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management.
N1-1ss,-i&
- Jll-1JfvfSS U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRC Docket Nos. 50-254, 50-265, and 72-53 August 17, 2017 Page2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter. There are no regulatory commitments in this submittal.
If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.
Respectfully,
.. M. Imburgia
- Manager, Licensing Programs Exelon Generation
- Company, LLC Attachments: 1 ) 2) 1 O CFR 50.54(q)(5)
Procedure Change Summary Analysis EP-AA-1006, Addendum 3, Revision 4, "Emergency Action Levels for Quad Cities Station" cc: w/ Attachment 1 only Regional Administrator
-NRC Region Ill Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector
-Quad Cities Nuclear Power Station NRC Project Manager, NRR -Quad Cities Nuclear Power Station Illinois Emergency Management Agency -Division of Nuclear Safety