{{#Wiki_filter:1NRR-DMPSPEm ResourceFrom:Kuntz, RobertSent:Tuesday, March 20, 2018 7:56 AMTo:'Loeffler, Richard A.'
{{#Wiki_filter:1NRR-DMPSPEm Resource From:Kuntz, Robert Sent:Tuesday, March 20, 2018 7:56 AM To:'Loeffler, Richard A.'


==Subject:==
==Subject:==
Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief request to extend reactor vessel closure head component inspection frequency (EPID: L-2018-LLR-0023)Mr. Loeffler, By letter dated March 6, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18065A583), Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted a relief request for Prairie Island Nuclear Generating Plant, Units 1 and 2 to permit an alternative to the frequency specified for performance of volumetric/surface examinations of Reactor Vessel Closure Head components in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-729-4. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. 
Prairie Island Nuclear Generati ng Plant, Units 1 and 2 - Relief request to extend reactor vessel closure head component inspec tion frequency (EPID: L-2018-LLR-0023)
Mr. Loeffler,  


Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
By letter dated March 6, 2018 (Agencywide Documents Access and Manageme nt System (ADAMS) Accession No. ML18065A583), Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted a relief request for Prairie Island Nuclear Generating Plant, Units 1 and 2 to permit an alternative to the frequency specified for performance of volumetric/surface ex aminations of Reactor Vessel Closure Head components in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-729-4. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. 
Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 120 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is March 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
 
If you have any questions, please contact me.
Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.  
Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier:  NRR_DMPS Email Number:  250  Mail Envelope Properties  (CY1PR09MB04607377233BE9CDC685D15199AB0)  
 
Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 120 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is March 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
 
If you have any questions, please contact me.  
 
Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III  
 
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier:  NRR_DMPS Email Number:  250  Mail Envelope Properties  (CY1PR09MB04607377233BE9CDC685D15199AB0)


==Subject:==
==Subject:==
Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief request to extend reactor vessel closure head component inspection frequency (EPID: L-2018-LLR-0023)  Sent Date:  3/20/2018 7:56:10 AM  Received Date:  3/20/2018 7:56:10 AM From:    Kuntz, Robert Created By:  Robert.Kuntz@nrc.gov Recipients:    "'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com>  Tracking Status: None Post Office:  CY1PR09MB0460.namprd09.prod.outlook.com   Files    Size      Date & Time MESSAGE    2608      3/20/2018 7:56:10 AM   Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}
Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief request to extend reactor vessel closure head component inspection frequency (EPID: L-2018-LLR-0023)  Sent Date:  3/20/2018 7:56:10 AM  Received Date:  3/20/2018 7:56:10 AM From:    Kuntz, Robert Created By:  Robert.Kuntz@nrc.gov Recipients:    "'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com>  Tracking Status: None  
 
Post Office:  CY1PR09MB0460.namprd09.prod.outlook.com Files    Size      Date & Time MESSAGE    2608      3/20/2018 7:56:10 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 02:00, 29 June 2018

2018/03/20 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief Request to Extend Reactor Vessel Closure Head Component Inspection Frequency (EPID: L-2018-LLR-0023)
ML18079A122
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/20/2018
From: Kuntz R F
Plant Licensing Branch III
To: Loeffler R A
Northern States Power Co
References
L-2018-LLR-0023
Download: ML18079A122 (2)


Text

1NRR-DMPSPEm Resource From:Kuntz, Robert Sent:Tuesday, March 20, 2018 7:56 AM To:'Loeffler, Richard A.'

Subject:

Prairie Island Nuclear Generati ng Plant, Units 1 and 2 - Relief request to extend reactor vessel closure head component inspec tion frequency (EPID: L-2018-LLR-0023)

Mr. Loeffler,

By letter dated March 6, 2018 (Agencywide Documents Access and Manageme nt System (ADAMS) Accession No. ML18065A583), Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted a relief request for Prairie Island Nuclear Generating Plant, Units 1 and 2 to permit an alternative to the frequency specified for performance of volumetric/surface ex aminations of Reactor Vessel Closure Head components in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-729-4. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is March 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier: NRR_DMPS Email Number: 250 Mail Envelope Properties (CY1PR09MB04607377233BE9CDC685D15199AB0)

Subject:

Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief request to extend reactor vessel closure head component inspection frequency (EPID: L-2018-LLR-0023) Sent Date: 3/20/2018 7:56:10 AM Received Date: 3/20/2018 7:56:10 AM From: Kuntz, Robert Created By: Robert.Kuntz@nrc.gov Recipients: "'Loeffler, Richard A.'" <Richard.Loeffler@xenuclear.com> Tracking Status: None