ML17087A282: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 23: Line 23:


==Attachment:==
==Attachment:==
1. Funding Status Report for Managing Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage histallation (Status as of 12/31/2016)  
: 1. Funding Status Report for Managing Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage histallation (Status as of 12/31/2016)  


==References:==
==References:==
1. M. B. Sellman (Maine Yankee) letter to USNRC, "Certifications of Permanent Cessation of Power Operation and Permanent Removal of Fuel from the Reactor," dated August 7, 1997 2. USNRC letter to Maine Yankee, License Amendment No. 172 to Facility Operating License No. DPR-36, dated September 30, 2005 cc: D. H. Dorman, NRC Region I Administrator R. Powell, Chief, Decommissioning Branch, NRC, Region 1 J. Goshen, NRC Project Manager P. Dostie, State of Maine, Nuclear Safety Inspector J. Hyland, State of Maine, Manager Radiation Control Program   
: 1. M. B. Sellman (Maine Yankee) letter to USNRC, "Certifications of Permanent Cessation of Power Operation and Permanent Removal of Fuel from the Reactor," dated August 7, 1997 2. USNRC letter to Maine Yankee, License Amendment No. 172 to Facility Operating License No. DPR-36, dated September 30, 2005 cc: D. H. Dorman, NRC Region I Administrator R. Powell, Chief, Decommissioning Branch, NRC, Region 1 J. Goshen, NRC Project Manager P. Dostie, State of Maine, Nuclear Safety Inspector J. Hyland, State of Maine, Manager Radiation Control Program   
., ,_ ATTACHMENT 1 TO OMY-17-012 FUNDING STATUS REPORT FOR THE MANAGING OF IRRADIATED FUEL AND GTCC WASTE AT THE MAINEY ANKEE INDEPENDENT SPENT FUEL STORAGE INSTALLATION (STATUS AS OF 12/31/2016)    to OMY-17-012 Funding Status Report for the Managing of Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage Installation (Status as of 12/31/2016) 10 CFR Requirement Response Comment 10 CFR 50.82(a)(8)(vii) Requirements 1. The amount of funds accumulated Maine Yankee Atomic Power Company (Maine Yankee) has established an account to cover the cost of managing the million (as of within its Nuclear Decommissioning Trust (NDT) entitled, "ISFSI Radiological irradiated fuel. 12/31/16) Decom," that segregates the funds for decommissioning of the Maine Yankee Independent Spent Fuel Sforage Installation (ISFSI) from the larger balance of funds for ongoing management of irradiated fuel and Greater than Class C ( GTCC) waste held in the NDT. This accrued market value balance established here excludes the funds set-aside for decommissioning the ISFSI. 2. The projected cost of managing The current cost estimate for management of spent fuel and Greater than Class C irradiated fuel until title to the million (2017 (GTCC) waste was filed with the Federal Energy Regulatory Commission (FERC) on fuel and possession of the fuel is through September 30, 2016 and approved by FERC on November 15, 2016. transferred to the Secretary of 2036*) (In Energy. 2016 dollars)
., ,_ ATTACHMENT 1 TO OMY-17-012 FUNDING STATUS REPORT FOR THE MANAGING OF IRRADIATED FUEL AND GTCC WASTE AT THE MAINEY ANKEE INDEPENDENT SPENT FUEL STORAGE INSTALLATION (STATUS AS OF 12/31/2016)    to OMY-17-012 Funding Status Report for the Managing of Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage Installation (Status as of 12/31/2016) 10 CFR Requirement Response Comment 10 CFR 50.82(a)(8)(vii) Requirements 1. The amount of funds accumulated Maine Yankee Atomic Power Company (Maine Yankee) has established an account to cover the cost of managing the million (as of within its Nuclear Decommissioning Trust (NDT) entitled, "ISFSI Radiological irradiated fuel. 12/31/16) Decom," that segregates the funds for decommissioning of the Maine Yankee Independent Spent Fuel Sforage Installation (ISFSI) from the larger balance of funds for ongoing management of irradiated fuel and Greater than Class C ( GTCC) waste held in the NDT. This accrued market value balance established here excludes the funds set-aside for decommissioning the ISFSI. 2. The projected cost of managing The current cost estimate for management of spent fuel and Greater than Class C irradiated fuel until title to the million (2017 (GTCC) waste was filed with the Federal Energy Regulatory Commission (FERC) on fuel and possession of the fuel is through September 30, 2016 and approved by FERC on November 15, 2016. transferred to the Secretary of 2036*) (In Energy. 2016 dollars)
* Currently, the irradiated fuel and GTCC waste are scheduled to be removed from the site by 2035, with decommissioning, license termination, and business closure occurring after that time period. 3. If the funds accumulated do not See Comment The Company has several methods of obtaining additional funds to cover projected cover the projected cost, a plan to costs. obtain additional funds to cover the cost. First, Maine Yankee may collect funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of Maine Yankee, including the ongoing costs of managing irradiated fuel and GTCC waste. Pursuant to these power contracts, Maine Yankee has the ongoing ability to seek collections from its purchasers for additional funds that may be required to cover these costs. Second, Maine Yankee has received proceeds from the successful litigation of the first three phases of its breach of contract damages claims against the DOE for failure to begin the removal of spent nuclear fuel (SNF) and GTCC waste from the site in 1998. Maine Yankee will continue to file claims against the DOE as long as the DOE continues to breach its contract obligations related to SNF and GTCC waste. To that Page 1 of2    to OMY-17-012 Funding Status Report for the Managing of Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage Installation (Status as of 12/31/2016) 10 CFR Requirement Response Comment end, in 2017, the Company plans to file a fourth round of claims (the Phase IV case) against the DOE seeking damages for the years 2013 -2016. The Company cannot predict the timing or the amount it may ultimately be awarded. A Maine Yankee FERC filing approved in June, 2013, implemented a fifteen year funding mechanism. Until the 2013 FERC filing, the Company had employed a "full funding" assumption in developing funding requirements. The fifteen year funding mechanism was put in place to incorporate the potential for the receipt of future DOE breach of contract damages as a source of funding. If future damage recovery does not occur, the Company has the ability to apply to FERC for more funding, if necessary. The approved FERC filing also requires Maine Yankee to provide an informational filing regarding the adequacy of funding if five years pass without receipt of damage awards from litigation with the DOE. Third, Maine Yankee expects to utilize the investment return on Decommissioning Trust assets to offset future costs. The current assumed rate of investment return, after fees and taxes is 4.0%. Page2 of2
* Currently, the irradiated fuel and GTCC waste are scheduled to be removed from the site by 2035, with decommissioning, license termination, and business closure occurring after that time period. 3. If the funds accumulated do not See Comment The Company has several methods of obtaining additional funds to cover projected cover the projected cost, a plan to costs. obtain additional funds to cover the cost. First, Maine Yankee may collect funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of Maine Yankee, including the ongoing costs of managing irradiated fuel and GTCC waste. Pursuant to these power contracts, Maine Yankee has the ongoing ability to seek collections from its purchasers for additional funds that may be required to cover these costs. Second, Maine Yankee has received proceeds from the successful litigation of the first three phases of its breach of contract damages claims against the DOE for failure to begin the removal of spent nuclear fuel (SNF) and GTCC waste from the site in 1998. Maine Yankee will continue to file claims against the DOE as long as the DOE continues to breach its contract obligations related to SNF and GTCC waste. To that Page 1 of2    to OMY-17-012 Funding Status Report for the Managing of Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage Installation (Status as of 12/31/2016) 10 CFR Requirement Response Comment end, in 2017, the Company plans to file a fourth round of claims (the Phase IV case) against the DOE seeking damages for the years 2013 -2016. The Company cannot predict the timing or the amount it may ultimately be awarded. A Maine Yankee FERC filing approved in June, 2013, implemented a fifteen year funding mechanism. Until the 2013 FERC filing, the Company had employed a "full funding" assumption in developing funding requirements. The fifteen year funding mechanism was put in place to incorporate the potential for the receipt of future DOE breach of contract damages as a source of funding. If future damage recovery does not occur, the Company has the ability to apply to FERC for more funding, if necessary. The approved FERC filing also requires Maine Yankee to provide an informational filing regarding the adequacy of funding if five years pass without receipt of damage awards from litigation with the DOE. Third, Maine Yankee expects to utilize the investment return on Decommissioning Trust assets to offset future costs. The current assumed rate of investment return, after fees and taxes is 4.0%. Page2 of2}}
}}

Revision as of 21:54, 18 May 2018

Maine Yankee Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste
ML17087A282
Person / Time
Site: Maine Yankee
Issue date: 03/09/2017
From: Pizzella C M
Maine Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
OMY-17-012
Download: ML17087A282 (5)


Text

  • MAINE YANKEE 321 Old Ferry Road, Wiscasset, Maine 04578 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 -0001 Maine Yankee Atomic Power Company March 09, 2017 OMY-17-012 10 CFR50.4 10 CFR 50.82(a)(8)(vii) Maine Yankee Independent Spent Fuel Storage Installation NRC License No. DPR-36 (NRC Docket No. 50-309)

Subject:

Funding Status Report for Managing Irradiated Fuel and GTCC Waste On August 7, 1997, Maine Yankee Atomic Power Company (Maine Yankee) informed the USNRC that the Board of Directors of Maine Yankee had decided to permanently cease operations at the Maine Yankee plant and that fuel had been permanently removed from the reactor (Reference 1). In accordance with 10 CFR 50.82(a)(2), the certifications in the letter modified the Maine Yankee license to permanently withdraw Maine Yankee's authority to operate the reactor. In 1998, Maine Yankee commenced decommissioning the power plant. On September 30, 2005, the NRC amended the Maine Yankee license, releasing most of the formerly licensed land for unrestricted use, shrinking the licensed land to that utilized to support the Independent Spent Fuel Storage Installation (ISFSI) (Reference 2). Presently, Maine Yankee is storing irradiated fuel and Greater than Class C (GTCC) waste on site until the Department of Energy (DOE) satisfies its contractual obligations to take title and possession of the spent fuel and GTCC waste and remove them from the site.

  • In Attachment 1, Maine Yankee provides the attached Funding Status Report for Managing Irradiated Fuel and GTCC Waste at the Maine Yankee ISFSI to comply with' 10 CFR 50.82(a)(8)(vii). This letter contains p.o regulatory commitments. If you have any questions regarding this letter, please do not hesitate to contact me at (860) 267-6426 x304. Carla M. Pizzella Vice President, Chief Financial Officer, and Treasurer Maine Yankee Atomic Power Company OMY-17-012\March 9, 2017\Page 2

Attachment:

1. Funding Status Report for Managing Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage histallation (Status as of 12/31/2016)

References:

1. M. B. Sellman (Maine Yankee) letter to USNRC, "Certifications of Permanent Cessation of Power Operation and Permanent Removal of Fuel from the Reactor," dated August 7, 1997 2. USNRC letter to Maine Yankee, License Amendment No. 172 to Facility Operating License No. DPR-36, dated September 30, 2005 cc: D. H. Dorman, NRC Region I Administrator R. Powell, Chief, Decommissioning Branch, NRC, Region 1 J. Goshen, NRC Project Manager P. Dostie, State of Maine, Nuclear Safety Inspector J. Hyland, State of Maine, Manager Radiation Control Program

., ,_ ATTACHMENT 1 TO OMY-17-012 FUNDING STATUS REPORT FOR THE MANAGING OF IRRADIATED FUEL AND GTCC WASTE AT THE MAINEY ANKEE INDEPENDENT SPENT FUEL STORAGE INSTALLATION (STATUS AS OF 12/31/2016) to OMY-17-012 Funding Status Report for the Managing of Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage Installation (Status as of 12/31/2016) 10 CFR Requirement Response Comment 10 CFR 50.82(a)(8)(vii) Requirements 1. The amount of funds accumulated Maine Yankee Atomic Power Company (Maine Yankee) has established an account to cover the cost of managing the million (as of within its Nuclear Decommissioning Trust (NDT) entitled, "ISFSI Radiological irradiated fuel. 12/31/16) Decom," that segregates the funds for decommissioning of the Maine Yankee Independent Spent Fuel Sforage Installation (ISFSI) from the larger balance of funds for ongoing management of irradiated fuel and Greater than Class C ( GTCC) waste held in the NDT. This accrued market value balance established here excludes the funds set-aside for decommissioning the ISFSI. 2. The projected cost of managing The current cost estimate for management of spent fuel and Greater than Class C irradiated fuel until title to the million (2017 (GTCC) waste was filed with the Federal Energy Regulatory Commission (FERC) on fuel and possession of the fuel is through September 30, 2016 and approved by FERC on November 15, 2016. transferred to the Secretary of 2036*) (In Energy. 2016 dollars)

  • Currently, the irradiated fuel and GTCC waste are scheduled to be removed from the site by 2035, with decommissioning, license termination, and business closure occurring after that time period. 3. If the funds accumulated do not See Comment The Company has several methods of obtaining additional funds to cover projected cover the projected cost, a plan to costs. obtain additional funds to cover the cost. First, Maine Yankee may collect funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of Maine Yankee, including the ongoing costs of managing irradiated fuel and GTCC waste. Pursuant to these power contracts, Maine Yankee has the ongoing ability to seek collections from its purchasers for additional funds that may be required to cover these costs. Second, Maine Yankee has received proceeds from the successful litigation of the first three phases of its breach of contract damages claims against the DOE for failure to begin the removal of spent nuclear fuel (SNF) and GTCC waste from the site in 1998. Maine Yankee will continue to file claims against the DOE as long as the DOE continues to breach its contract obligations related to SNF and GTCC waste. To that Page 1 of2 to OMY-17-012 Funding Status Report for the Managing of Irradiated Fuel and GTCC Waste at the Maine Yankee Independent Spent Fuel Storage Installation (Status as of 12/31/2016) 10 CFR Requirement Response Comment end, in 2017, the Company plans to file a fourth round of claims (the Phase IV case) against the DOE seeking damages for the years 2013 -2016. The Company cannot predict the timing or the amount it may ultimately be awarded. A Maine Yankee FERC filing approved in June, 2013, implemented a fifteen year funding mechanism. Until the 2013 FERC filing, the Company had employed a "full funding" assumption in developing funding requirements. The fifteen year funding mechanism was put in place to incorporate the potential for the receipt of future DOE breach of contract damages as a source of funding. If future damage recovery does not occur, the Company has the ability to apply to FERC for more funding, if necessary. The approved FERC filing also requires Maine Yankee to provide an informational filing regarding the adequacy of funding if five years pass without receipt of damage awards from litigation with the DOE. Third, Maine Yankee expects to utilize the investment return on Decommissioning Trust assets to offset future costs. The current assumed rate of investment return, after fees and taxes is 4.0%. Page2 of2