{{#Wiki_filter:ML101330321 September 10, 2010 NRC INFORMATION NOTICE 2010-17: COMMON CAUSE FAILURE OF BOILING-WATER REACTOR RECIRCULATION PUMPS WITH VARIABLE SPEED DRIVES
{{#Wiki_filter: ML101330321 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC  20555-0001 September 10, 2010   NRC INFORMATION NOTICE 2010-17: COMMON CAUSE FAILURE OF BOILING-WATER REACTOR RECIRCULATION PUMPS WITH
 
VARIABLE SPEED DRIVES


==ADDRESSEES==
==ADDRESSEES==
All holders of an operating license or construction permit for a nuclear power reactor issued under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vesse All holders of or applicants for a standard design certification, standard design approval, or combined license issued under 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants."  
All holders of an operating license or construction permit for a nuclear power reactor issued under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.  All holders of or applicants for a standard design certification, standard design approval, or combined license issued under 10 CFR Part 52, "Licenses, Certifications, and Approvals for
 
Nuclear Power Plants."


==PURPOSE==
==PURPOSE==
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform addressees about two international events at boiling-water reactor (BWR) plants that experienced a common cause failure of all recirculation pump The NRC expects that recipients will review this information for applicability to their facilities and consider actions, as appropriate, to avoid similar problem However, suggestions contained in this IN are not NRC requirements; therefore, no specific action or written response is require
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform
 
addressees about two international events at boiling-water reactor (BWR) plants that experienced a common cause failure of all recirculation pumps.  The NRC expects that recipients will review this information for applicability to their facilities and consider actions, as appropriate, to avoid similar problems.  However, suggestions contained in this IN are not NRC requirements; therefore, no specific action or written response is required.


==DESCRIPTION OF CIRCUMSTANCES==
==DESCRIPTION OF CIRCUMSTANCES==
On June 13, 2008, at Forsmark Unit 2 in Sweden, lightning strikes caused a short circuit on the offsite power gri This resulted in a transient that tripped all eight reactor recirculation pump Each recirculation pump circuit contains an integral flywheel to prevent a rapid reduction in pump spee The mass of the rotating flywheel stores mechanical energy that is converted to electrical power by a flywheel-generator and inverter/rectifier to continue to power the drive system DC-bus (one DC-bus common for two pump-drive inverters) upon a dip in or loss of the normal electrical powe When the inverter/rectifier is operable, the alternate power allows for an unchanged pump speed (in case of power dips) or a more gradual reduction in pump speed (in case of significant loss, signaled by equipment protection). In the case of a reactor recirculation pump, the coastdown produces a correspondingly more gradual reduction in recirculation flo However, at Forsmark Unit 2, the lightning strike tripped the normal electric power rectifier due to a sensitive protection setting; furthermore, due to a design flaw, the protective action was not signaled to the inverter/rectifier controller for the flywheel-generato As a result, the recirculation pump motors rapidly consumed the flywheel-generator's stored energ With no available energy storage, the recirculation pumps reduced speed faster than the assumed transient analyses in the Forsmark Unit 2 safety analysis repor The reduced coastdown time resulted in a short violation of the safety limit minimum critical power ratio on 84 core channels/fuel elements and a transient dryout condition in 18 of those core channel Based on its review of the analysis and inspection results that revealed no fuel damage, the Swedish Radiation Safety Authority granted the licensee's request for continued use of the affected fue On May 30, 2008, Olkiluoto Unit 1 in Finland had a reactor trip from 60 percent powe An electrical transient resulted in a common cause failure that caused all six recirculation pumps to stop unexpectedl Although the coastdown of the recirculation pumps was shorter than expected, the transient had no effect on fuel integrit
On June 13, 2008, at Forsmark Unit 2 in Sweden, lightning strikes caused a short circuit on the offsite power grid.  This resulted in a transient that tripped all eight reactor recirculation pumps.
 
Each recirculation pump circuit contains an integral flywheel to prevent a rapid reduction in pump speed.  The mass of the rotating flywheel stores mechanical energy that is converted to electrical power by a flywheel-generator and inverter/rectifier to continue to power the drive system DC-bus (one DC-bus common for two pump-drive inverters) upon a dip in or loss of the normal electrical power.  When the inverter/rectifier is operable, the alternate power allows for an unchanged pump speed (in case of power dips) or a more gradual reduction in pump speed (in case of significant loss, signaled by equipment protection). In the case of a reactor
 
recirculation pump, the coastdown produces a correspondingly more gradual reduction in recirculation flow.  However, at Forsmark Unit 2, the lightning strike tripped the normal electric power rectifier due to a sensitive protection setting; furthermore, due to a design flaw, the protective action was not signaled to the inverter/rectifier controller for the flywheel-generator. As a result, the recirculation pump motors rapidly consumed the flywheel-generator's stored energy.  With no available energy storage, the recirculation pumps reduced speed faster than the assumed transient analyses in the Forsmark Unit 2 safety analysis report.  The reduced
 
coastdown time resulted in a short violation of the safety limit minimum critical power ratio on 84 core channels/fuel elements and a transient dryout condition in 18 of those core channels.  Based on its review of the analysis and inspection results that revealed no fuel damage, the Swedish Radiation Safety Authority granted the licensee's request for continued use of the affected fuel.
 
On May 30, 2008, Olkiluoto Unit 1 in Finland had a reactor trip from 60 percent power.  An electrical transient resulted in a common cause failure that caused all six recirculation pumps to stop unexpectedly.  Although the coastdown of the recirculation pumps was shorter than expected, the transient had no effect on fuel integrity.


==BACKGROUND==
==BACKGROUND==
Related NRC Generic Communications include the following:
Related NRC Generic Communications include the following:  
* NRC IN 96-56, "Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power," dated October 22, 1996 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML031050587). This IN highlighted the importance of evaluating and controlling on-line manipulations of digital control systems, such as resetting a processor or performing on-line software changes, to avoid reactor transients and plant trip
* NRC IN 96-56, "Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power," dated October 22, 1996 (Agencywide Documents Access and
 
Management System (ADAMS) Accession No. ML031050587). This IN highlighted the importance of evaluating and controlling on-line manipulations of digital control systems, such as resetting a processor or performing on-line software changes, to avoid reactor
 
transients and plant trips.
 
* IN 2010-10, "Implementation of a Digital Control System under 10 CFR 50.59," dated May 28, 2010 (ADAMS Accession No. ML100080281).  This IN discusses that for digital upgrades to systems that are highly safety-significant, a defense-in-depth and diversity


* IN 2010-10, "Implementation of a Digital Control System under 10 CFR 50.59," dated May 28, 2010 (ADAMS Accession No. ML100080281). This IN discusses that for digital upgrades to systems that are highly safety-significant, a defense-in-depth and diversity analysis is performed as part of the design process to ensure that the plant has adequate capability to cope with software common-cause failure vulnerabilitie
analysis is performed as part of the design process to ensure that the plant has adequate capability to cope with software common-cause failure vulnerabilities.


==DISCUSSION==
==DISCUSSION==
Unlike Olkiluoto Unit 1 and Forsmark Unit 2, U.S. BWRs do not have recirculation pump designs that rely on energy storage separate from the recirculation pump motor and generator that could influence recirculation system flow following a scra In the U.S. BWR designs, the combined rotating inertias of the recirculation pump and motor, the motor generator set, and the variable speed coupling are used to provide a relatively slow coastdown of flow following loss of power to the drive motors which helps ensure that the core is adequately coole The specific common cause failure that occurred at Olkiluoto and Forsmark is not an issue for U.S. BWR However, digital variable speed drive (VSD) technology may increase the complexity of the recirculation pump control system and may introduce new failure modes such as software programming errors, network problems, loss of power, and the failure of control boards, that can lead to unplanned changes in pump spee Previous operating experience for recirculation pump VSD includes instances of unintentional reactivity changes during power operatio Although the recirculation pump motors are generally non-safety related, as the industry upgrades their systems to digital VSD, it is important that licensees understand the potential unexpected recirculation pump behaviors that might affect core reactivity or safety limit As part of the design process when upgrading to digital VSD technology on recirculation pump systems, the following are important considerations:  
Unlike Olkiluoto Unit 1 and Forsmark Unit 2, U.S. BWRs do not have recirculation pump designs that rely on energy storage separate from the recirculation pump motor and generator that could influence recirculation system flow following a scram.  In the U.S. BWR designs, the combined rotating inertias of the recirculation pump and motor, the motor generator set, and the variable speed coupling are used to provide a relatively slow coastdown of flow following loss of power to the drive motors which helps ensure that the core is adequately cooled.
 
The specific common cause failure that occurred at Olkiluoto and Forsmark is not an issue for U.S. BWRs.  However, digital variable speed drive (VSD) technology may increase the complexity of the recirculation pump control system and may introduce new failure modes such as software programming errors, network problems, loss of power, and the failure of control boards, that can lead to unplanned changes in pump speed.  Previous operating experience for
 
recirculation pump VSD includes instances of unintentional reactivity changes during power operation.  Although the recirculation pump motors are generally non-safety related, as the industry upgrades their systems to digital VSD, it is important that licensees understand the potential unexpected recirculation pump behaviors that might affect core reactivity or safety limits.  As part of the design process when upgrading to digital VSD technology on recirculation pump systems, the following are important considerations:


* Perform evaluations to identify failure modes for digital VSDs to include sources of common-cause failure, such as softwar
* Perform evaluations to identify failure modes for digital VSDs to include sources of common-cause failure, such as software.


* Determine if the consequences of a digital VSD common-cause failure could lead to reactivity events that have not been analyzed in the plant safety analysi
* Determine if the consequences of a digital VSD common-cause failure could lead to reactivity events that have not been analyzed in the plant safety analysis.


* Ensure the reactor protection system maintains plant safety within its design basis even with a common-cause failur
* Ensure the reactor protection system maintains plant safety within its design basis even with a common-cause failure.


==CONTACT==
==CONTACT==
This IN requires no specific action or written respons Please direct any questions about this matter to the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manage /RA/ /RA by JTappert for/
This IN requires no specific action or written response.  Please direct any questions about this matter to the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manager.  /RA/     /RA by JTappert for/  
Timothy McGinty, Director Glenn Tracy, Director Division of Policy and Rulemaking Division of Construction Inspection and Office of Nuclear Reactor Regulation Operational Programs Office of New Reactors Technical Contacts: Joseph Giantelli, NRR Pong Chung, NRR 301-415-0504 301-415-2473 E-mail: joseph.giantelli@nrc.gov E-mail: pong.chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collection potential unexpected recirculation pump behaviors that might affect core reactivity or safety limit As part of the design process when upgrading to digital VSD technology on recirculation pump systems, the following are important considerations:  
Timothy McGinty, Director Glenn Tracy, Director Division of Policy and Rulemaking Division of Construction Inspection and Office of Nuclear Reactor Regulation   Operational Programs Office of New Reactors
 
Technical Contacts: Joseph Giantelli, NRR Pong Chung, NRR 301-415-0504 301-415-2473 E-mail: joseph.giantelli@nrc.gov E-mail: pong.chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. potential unexpected recirculation pump behaviors that might affect core reactivity or safety limits.  As part of the design process when upgrading to digital VSD technology on recirculation pump systems, the following are important considerations:


* Perform evaluations to identify failure modes for digital VSDs to include sources of common-cause failure, such as softwar
* Perform evaluations to identify failure modes for digital VSDs to include sources of common-cause failure, such as software.


* Determine if the consequences of a digital VSD common-cause failure could lead to reactivity events that have not been analyzed in the plant safety analysi
* Determine if the consequences of a digital VSD common-cause failure could lead to reactivity events that have not been analyzed in the plant safety analysis.


* Ensure the reactor protection system maintains plant safety within its design basis even with a common-cause failur
* Ensure the reactor protection system maintains plant safety within its design basis even with a common-cause failure.


==CONTACT==
==CONTACT==
This IN requires no specific action or written respons Please direct any questions about this matter to the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manage /RA/ /RA by JTappert for/
This IN requires no specific action or written response.  Please direct any questions about this matter to the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manager.  /RA/     /RA by JTappert for/  
Timothy McGinty, Director Glenn Tracy, Director Division of Policy and Rulemaking Division of Construction Inspection and Office of Nuclear Reactor Regulation Operational Programs Office of New Reactors Technical Contacts: Joseph Giantelli, NRR Pong Chung, NRR 301-415-0504 301-415-2473 E-mail: joseph.giantelli@nrc.gov E-mail: pong.chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collection ADAMS Accession Number: ML101330321 TAC ME3898 OFFICE DIRS/IOEB DE/EICB Tech Editor BC/DIRS/IOEB BC/D/EICB D/NRR/DE NAME JGiantelli PChung CHsu JThorp BKemper PHiland DATE 07/27/10 07/27/10 08/15/10 e-mail 07/27/10 07/27/10 07/28/10 OFFICE NRR/PGCB NRR/PGCB BC/NRR/PGCB DD/OIP D/NRO/DCIP D/NRR/ DPR NAME CHawes DBeaulieu SRosenberg SMoore GTracy JTappert for TMcGinty OFFICE 08/26/10 08/25/10 08/26/10 09/09/10 09/10/10 09/10/10 OFFICIAL RECORD COPY}}
Timothy McGinty, Director Glenn Tracy, Director Division of Policy and Rulemaking Division of Construction Inspection and Office of Nuclear Reactor Regulation   Operational Programs Office of New Reactors
 
Technical Contacts: Joseph Giantelli, NRR Pong Chung, NRR 301-415-0504 301-415-2473 E-mail: joseph.giantelli@nrc.gov E-mail: pong.chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.
 
ADAMS Accession Number: ML101330321     TAC ME3898 OFFICE DIRS/IOEB DE/EICB Tech Editor BC/DIRS/IOEB BC/D/EICB D/NRR/DE NAME JGiantelli PChung CHsu JThorp BKemper PHiland DATE 07/27/10 07/27/10 08/15/10 e-mail 07/27/10 07/27/10 07/28/10 OFFICE NRR/PGCB NRR/PGCB BC/NRR/PGCB DD/OIP D/NRO/DCIP D/NRR/ DPR NAME CHawes DBeaulieu SRosenberg SMoore GTracy JTappert for TMcGinty OFFICE 08/26/10 08/25/10 08/26/10 09/09/10 09/10/10 09/10/10 OFFICIAL RECORD COPY
 
}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Revision as of 18:12, 6 April 2018

Common Cause Failure of Boiling-Water Reactor Recirculation Pumps with Variable Speed Drives
ML101330321
Person / Time
Issue date: 09/10/2010
From: McGinty T J, Tracy G M
Office of New Reactors, Office of Nuclear Reactor Regulation
To:
Joseph Giantelli, NRR/DIRS/IOEB
References
IN-10-017
Download: ML101330321 (4)


ML101330321 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 September 10, 2010 NRC INFORMATION NOTICE 2010-17: COMMON CAUSE FAILURE OF BOILING-WATER REACTOR RECIRCULATION PUMPS WITH

VARIABLE SPEED DRIVES

ADDRESSEES

All holders of an operating license or construction permit for a nuclear power reactor issued under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel. All holders of or applicants for a standard design certification, standard design approval, or combined license issued under 10 CFR Part 52, "Licenses, Certifications, and Approvals for

Nuclear Power Plants."

PURPOSE

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform

addressees about two international events at boiling-water reactor (BWR) plants that experienced a common cause failure of all recirculation pumps. The NRC expects that recipients will review this information for applicability to their facilities and consider actions, as appropriate, to avoid similar problems. However, suggestions contained in this IN are not NRC requirements; therefore, no specific action or written response is required.

DESCRIPTION OF CIRCUMSTANCES

On June 13, 2008, at Forsmark Unit 2 in Sweden, lightning strikes caused a short circuit on the offsite power grid. This resulted in a transient that tripped all eight reactor recirculation pumps.

Each recirculation pump circuit contains an integral flywheel to prevent a rapid reduction in pump speed. The mass of the rotating flywheel stores mechanical energy that is converted to electrical power by a flywheel-generator and inverter/rectifier to continue to power the drive system DC-bus (one DC-bus common for two pump-drive inverters) upon a dip in or loss of the normal electrical power. When the inverter/rectifier is operable, the alternate power allows for an unchanged pump speed (in case of power dips) or a more gradual reduction in pump speed (in case of significant loss, signaled by equipment protection). In the case of a reactor

recirculation pump, the coastdown produces a correspondingly more gradual reduction in recirculation flow. However, at Forsmark Unit 2, the lightning strike tripped the normal electric power rectifier due to a sensitive protection setting; furthermore, due to a design flaw, the protective action was not signaled to the inverter/rectifier controller for the flywheel-generator. As a result, the recirculation pump motors rapidly consumed the flywheel-generator's stored energy. With no available energy storage, the recirculation pumps reduced speed faster than the assumed transient analyses in the Forsmark Unit 2 safety analysis report. The reduced

coastdown time resulted in a short violation of the safety limit minimum critical power ratio on 84 core channels/fuel elements and a transient dryout condition in 18 of those core channels. Based on its review of the analysis and inspection results that revealed no fuel damage, the Swedish Radiation Safety Authority granted the licensee's request for continued use of the affected fuel.

On May 30, 2008, Olkiluoto Unit 1 in Finland had a reactor trip from 60 percent power. An electrical transient resulted in a common cause failure that caused all six recirculation pumps to stop unexpectedly. Although the coastdown of the recirculation pumps was shorter than expected, the transient had no effect on fuel integrity.

BACKGROUND

Related NRC Generic Communications include the following:

  • NRC IN 96-56, "Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power," dated October 22, 1996 (Agencywide Documents Access and

Management System (ADAMS) Accession No. ML031050587). This IN highlighted the importance of evaluating and controlling on-line manipulations of digital control systems, such as resetting a processor or performing on-line software changes, to avoid reactor

transients and plant trips.

  • IN 2010-10, "Implementation of a Digital Control System under 10 CFR 50.59," dated May 28, 2010 (ADAMS Accession No. ML100080281). This IN discusses that for digital upgrades to systems that are highly safety-significant, a defense-in-depth and diversity

analysis is performed as part of the design process to ensure that the plant has adequate capability to cope with software common-cause failure vulnerabilities.

DISCUSSION

Unlike Olkiluoto Unit 1 and Forsmark Unit 2, U.S. BWRs do not have recirculation pump designs that rely on energy storage separate from the recirculation pump motor and generator that could influence recirculation system flow following a scram. In the U.S. BWR designs, the combined rotating inertias of the recirculation pump and motor, the motor generator set, and the variable speed coupling are used to provide a relatively slow coastdown of flow following loss of power to the drive motors which helps ensure that the core is adequately cooled.

The specific common cause failure that occurred at Olkiluoto and Forsmark is not an issue for U.S. BWRs. However, digital variable speed drive (VSD) technology may increase the complexity of the recirculation pump control system and may introduce new failure modes such as software programming errors, network problems, loss of power, and the failure of control boards, that can lead to unplanned changes in pump speed. Previous operating experience for

recirculation pump VSD includes instances of unintentional reactivity changes during power operation. Although the recirculation pump motors are generally non-safety related, as the industry upgrades their systems to digital VSD, it is important that licensees understand the potential unexpected recirculation pump behaviors that might affect core reactivity or safety limits. As part of the design process when upgrading to digital VSD technology on recirculation pump systems, the following are important considerations:

  • Perform evaluations to identify failure modes for digital VSDs to include sources of common-cause failure, such as software.
  • Determine if the consequences of a digital VSD common-cause failure could lead to reactivity events that have not been analyzed in the plant safety analysis.

CONTACT

This IN requires no specific action or written response. Please direct any questions about this matter to the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manager. /RA/ /RA by JTappert for/

Timothy McGinty, Director Glenn Tracy, Director Division of Policy and Rulemaking Division of Construction Inspection and Office of Nuclear Reactor Regulation Operational Programs Office of New Reactors

Technical Contacts: Joseph Giantelli, NRR Pong Chung, NRR 301-415-0504 301-415-2473 E-mail: joseph.giantelli@nrc.gov E-mail: pong.chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. potential unexpected recirculation pump behaviors that might affect core reactivity or safety limits. As part of the design process when upgrading to digital VSD technology on recirculation pump systems, the following are important considerations:

  • Perform evaluations to identify failure modes for digital VSDs to include sources of common-cause failure, such as software.
  • Determine if the consequences of a digital VSD common-cause failure could lead to reactivity events that have not been analyzed in the plant safety analysis.

CONTACT

This IN requires no specific action or written response. Please direct any questions about this matter to the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manager. /RA/ /RA by JTappert for/

Timothy McGinty, Director Glenn Tracy, Director Division of Policy and Rulemaking Division of Construction Inspection and Office of Nuclear Reactor Regulation Operational Programs Office of New Reactors

Technical Contacts: Joseph Giantelli, NRR Pong Chung, NRR 301-415-0504 301-415-2473 E-mail: joseph.giantelli@nrc.gov E-mail: pong.chung@nrc.gov Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.

ADAMS Accession Number: ML101330321 TAC ME3898 OFFICE DIRS/IOEB DE/EICB Tech Editor BC/DIRS/IOEB BC/D/EICB D/NRR/DE NAME JGiantelli PChung CHsu JThorp BKemper PHiland DATE 07/27/10 07/27/10 08/15/10 e-mail 07/27/10 07/27/10 07/28/10 OFFICE NRR/PGCB NRR/PGCB BC/NRR/PGCB DD/OIP D/NRO/DCIP D/NRR/ DPR NAME CHawes DBeaulieu SRosenberg SMoore GTracy JTappert for TMcGinty OFFICE 08/26/10 08/25/10 08/26/10 09/09/10 09/10/10 09/10/10 OFFICIAL RECORD COPY