{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  October 17, 2012  Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs
[[Issue date::October 17, 2012]]
Tennessee Valley Authority
1101 Market Street, LP 4B-C
Chattanooga, TN 37402-2801
  SUBJECT: WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR 
INITIAL EXAMINATION 05000390/2013301  Dear Mr. Shea:  In a telephone conversation on October 3, 2012, between Mr. Brian Kaye, Operations Training
Supervisor and Mr. Mark Bates, Senior Operations Examiner, arrangements were made for the
administration of licensing examinations at Watts Bar Nuclear Plant.  The operating test is
scheduled to be administered during the weeks of March 18 and 25, 2013.  The written examination is scheduled to be administered during the week of April 1, 2013.  The on-site preparatory week is scheduled for the week of February 25, 2013.
As agreed during the telephone conversation, your staff will prepare the operating test outlines,
operating tests, and the written examination based on the guidelines in Revision 9, Supplement
1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the
examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 2, 2013.  The NRC provided the written examination outline to your staff in September 2011.  The written examination and the supporting reference materials identified in Attachment 3 to ES-201 will be due by January 11, 2013.  The operating tests will be due by
January 28, 2013.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use. 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
 
J. Shea 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average
500 hours per response, including the time for reviewing instructions, gathering and maintaining
the data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). 
J. Shea 3  Thank you for your cooperation in this matter.  Mr. Brian Kaye, has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Ken Schaaf at (404) 997-4568, (Internet E-Mail: Kenneth.Schaaf@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).  Sincerely,        /RA/  Malcolm T. Widmann, Chief      Operations Branch
      Division of Reactor Safety  Docket Nos.:  50-390
License Nos.:  NPF-90
cc:  See page 4
J. Shea 3  Thank you for your cooperation in this matter.  Mr. Brian Kaye, has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Ken Schaaf at (404) 997-4568, (Internet E-Mail: Kenneth.Schaaf@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).  Sincerely,        /RA/  Malcolm T. Widmann, Chief      Operations Branch
      Division of Reactor Safety  Docket Nos.:  50-390
License Nos.:  NPF-90
cc:  See page 4 
 
G PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE G NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________  G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS    SIGNATURE RA RA RA    NAME BATES SCHAAF WIDMANN    DATE 10/17/2012 10/17/2012 10/17/2012 10/      /2012 10/      /2012 10/      /2012 10/      /2012 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME: G:\OLEXAMS\WATTS BAR EXAMINATIONS\INITIAL EXAM 2013-301\CORRESPONDENCE\CORPORATE NOTIFICATION LETTER WB 2013-301 (MAB).DOCX 
 
J. Shea 4  cc: D. E. Grissette
Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority
Electronic Mail Distribution
David H. Gronek
Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority
P.O. Box 2000
Spring City, TN  37381
Donna K. Guinn Manager, Licensing and Industry Affairs
Watts Bar Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000 Spring City, TN  37381 
Terry E. Cribbe
Manager, Corp. Nuclear Licensing
Programs
Tennessee Valley Authority Electronic Mail Distribution 
Edward J. Vigluicci
Assistant General Counsel
Tennessee Valley Authority Electronic Mail Distribution 
Gordon P. Arent
Senior Manager, Licensing
WBN Unit 2 - Watts Bar Nuclear Plant
Tennessee Valley Authority P.O. Box 2000 Spring City, TN  37381
County Mayor
P.O. Box 156 Decatur, TN  37322 
County Executive
375 Church Street
Suite 215
Dayton, TN  37321 
Tennessee Department of Environment & Conservation
Division of Radiological Health 401 Church Street Nashville, TN  37243
Senior Resident Inspector
U.S. Nuclear Regulatory Commission
Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, TN  37381-2000
Ann Harris
341 Swing Loop Rockwood, TN  37854 
Tennessee Valley Authority
ATTN: Mr. William Thompson
Training Manager Watts Bar Nuclear Plant P. O. Box 2000
Spring City, TN  37381
 
  Letter to Joseph W. Shea from Malcolm T. Widmann dated October 17, 2012
SUBJECT:  WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR  INITIAL EXAMINATION 05000390/2013301 
Distribution: RIDSNRRDIRS
PUBLIC
RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource 


Mr. Joseph Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801
SUBJECT: WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000390/2013301
==Dear Mr. Shea:==
In a telephone conversation on October 3, 2012, between Mr. Brian Kaye, Operations Training Supervisor and Mr. Mark Bates, Senior Operations Examiner, arrangements were made for the administration of licensing examinations at Watts Bar Nuclear Plant. The operating test is scheduled to be administered during the weeks of March 18 and 25, 2013. The written examination is scheduled to be administered during the week of April 1, 2013. The on-site preparatory week is scheduled for the week of February 25, 2013.
As agreed during the telephone conversation, your staff will prepare the operating test outlines, operating tests, and the written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 2, 2013. The NRC provided the written examination outline to your staff in September 2011. The written examination and the supporting reference materials identified in Attachment 3 to ES-201 will be due by January 11, 2013. The operating tests will be due by January 28, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Brian Kaye, has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Ken Schaaf at (404) 997-4568, (Internet E-Mail: Kenneth.Schaaf@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
Sincerely,/RA/ Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-390 License Nos.: NPF-90
cc: See page 4 Thank you for your cooperation in this matter. Mr. Brian Kaye, has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Ken Schaaf at (404) 997-4568, (Internet E-Mail: Kenneth.Schaaf@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
Sincerely,/RA/ Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-390 License Nos.: NPF-90
cc: See page 4
G PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE G NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________ G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME BATES SCHAAF WIDMANN DATE 10/17/2012 10/17/2012 10/17/2012 10/ /2012 10/ /2012 10/ /2012 10/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\WATTS BAR EXAMINATIONS\INITIAL EXAM 2013-301\CORRESPONDENCE\CORPORATE NOTIFICATION LETTER WB 2013-301 (MAB).DOCX cc: D. E. Grissette Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
David H. Gronek Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Donna K. Guinn Manager, Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Terry E. Cribbe Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority Electronic Mail Distribution Edward J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution Gordon P. Arent Senior Manager, Licensing WBN Unit 2 - Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381
County Mayor P.O. Box 156 Decatur, TN 37322 County Executive 375 Church Street Suite 215 Dayton, TN 37321
Tennessee Department of Environment & Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243
Senior Resident Inspector U.S. Nuclear Regulatory Commission Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, TN 37381-2000
Ann Harris 341 Swing Loop Rockwood, TN 37854 Tennessee Valley Authority ATTN: Mr. William Thompson Training Manager Watts Bar Nuclear Plant P. O. Box 2000 Spring City, TN 37381
Letter to Joseph from Malcolm T. Widmann dated October 17, 2012.
SUBJECT: WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000390/2013301 Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource
}}
}}

Revision as of 10:50, 28 March 2018

Watts Bar Nuclear Plant - Notification of Licensed Operator Initial Examination 05000390-13-301
ML12292A631
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/17/2012
From: Widmann M T
Division of Nuclear Materials Safety II
To: Shea J W
Tennessee Valley Authority
References
Download: ML12292A631 (6)


See also: IR 05000390/2013301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 17, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs

Tennessee Valley Authority

1101 Market Street, LP 4B-C

Chattanooga, TN 37402-2801

SUBJECT: WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION 05000390/2013301 Dear Mr. Shea: In a telephone conversation on October 3, 2012, between Mr. Brian Kaye, Operations Training

Supervisor and Mr. Mark Bates, Senior Operations Examiner, arrangements were made for the

administration of licensing examinations at Watts Bar Nuclear Plant. The operating test is

scheduled to be administered during the weeks of March 18 and 25, 2013. The written examination is scheduled to be administered during the week of April 1, 2013. The on-site preparatory week is scheduled for the week of February 25, 2013.

As agreed during the telephone conversation, your staff will prepare the operating test outlines,

operating tests, and the written examination based on the guidelines in Revision 9, Supplement

1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the

examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 2, 2013. The NRC provided the written examination outline to your staff in September 2011. The written examination and the supporting reference materials identified in Attachment 3 to ES-201 will be due by January 11, 2013. The operating tests will be due by

January 28, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

J. Shea 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average

500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining

the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

J. Shea 3 Thank you for your cooperation in this matter. Mr. Brian Kaye, has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Ken Schaaf at (404) 997-4568, (Internet E-Mail: Kenneth.Schaaf@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov). Sincerely, /RA/ Malcolm T. Widmann, Chief Operations Branch

Division of Reactor Safety Docket Nos.: 50-390

License Nos.: NPF-90

cc: See page 4

J. Shea 3 Thank you for your cooperation in this matter. Mr. Brian Kaye, has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Ken Schaaf at (404) 997-4568, (Internet E-Mail: Kenneth.Schaaf@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov). Sincerely, /RA/ Malcolm T. Widmann, Chief Operations Branch

Division of Reactor Safety Docket Nos.: 50-390

License Nos.: NPF-90

cc: See page 4

G PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE G NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________ G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME BATES SCHAAF WIDMANN DATE 10/17/2012 10/17/2012 10/17/2012 10/ /2012 10/ /2012 10/ /2012 10/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\WATTS BAR EXAMINATIONS\INITIAL EXAM 2013-301\CORRESPONDENCE\CORPORATE NOTIFICATION LETTER WB 2013-301 (MAB).DOCX

J. Shea 4 cc: D. E. Grissette

Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority

Electronic Mail Distribution

David H. Gronek

Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority

P.O. Box 2000

Spring City, TN 37381

Donna K. Guinn Manager, Licensing and Industry Affairs

Watts Bar Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000 Spring City, TN 37381

Terry E. Cribbe

Manager, Corp. Nuclear Licensing

Programs

Tennessee Valley Authority Electronic Mail Distribution

Edward J. Vigluicci

Assistant General Counsel

Tennessee Valley Authority Electronic Mail Distribution

Gordon P. Arent

Senior Manager, Licensing

WBN Unit 2 - Watts Bar Nuclear Plant

Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381

County Mayor

P.O. Box 156 Decatur, TN 37322

County Executive

375 Church Street

Suite 215

Dayton, TN 37321

Tennessee Department of Environment & Conservation

Division of Radiological Health 401 Church Street Nashville, TN 37243

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, TN 37381-2000

Ann Harris

341 Swing Loop Rockwood, TN 37854

Tennessee Valley Authority

ATTN: Mr. William Thompson

Training Manager Watts Bar Nuclear Plant P. O. Box 2000

Spring City, TN 37381

Letter to Joseph W. Shea from Malcolm T. Widmann dated October 17, 2012.

SUBJECT: WATTS BAR NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000390/2013301

Distribution: RIDSNRRDIRS

PUBLIC

RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource