ML20055F757: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
1 OPERATING DATA REPORT DOCKET No. | |||
50-364 DATE 3/2/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes | |||
: 1. Unit Names- | : 1. Unit Names- | ||
: 2. Reporcing Period: | -Joseph H. Farley - Unit 2 | ||
: 1) Cumulative data since | |||
4.-Nameplate Rating (Gross HWe): | : 2. Reporcing Period: | ||
: 5. Design Electrical Rating (Net HWe): 829 | Februhry 1990 7-30-81, date of | ||
: 6. Maximum Dependable Capacity (Gross HWe): | -3.-Licensed Thermal Power (HWt): | ||
: 7. Maximum Dependable Capacity (Net HWe): | 2,65E' commercial operation. | ||
4.-Nameplate Rating (Gross HWe): | |||
860 | |||
: 5. Design Electrical Rating (Net HWe): | |||
829 | |||
: 6. Maximum Dependable Capacity (Gross HWe): | |||
868.6 | |||
: 7. Maximum Dependable Capacity (Net HWe): | |||
828.2 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A | ||
: 9. Power Level To Which Restricted, If Any (Net HVe): | : 9. Power Level To Which Restricted, If Any (Net HVe): | ||
: 10. Reasons For Restrictions, If Any: | N/A | ||
: 11. Hours In Reporting Period | + | ||
: 12. Number Of Hours Reactor Vas Critical | : 10. Reasons For Restrictions, If Any: | ||
: 13. Reactor Reserve Shutdown Hours | N/A This Month Tr-to-Date Cumulative | ||
: 14. Hours Generator On-Line | : 11. Hours In Reporting Period 672 1,416 75,265 | ||
: 15. Unit Reserve Shutdown Hours | : 12. Number Of Hours Reactor Vas Critical 672.0 1,416 65,299.1 l | ||
: 16. Gross' Thermal Energy Generated (MVH) | : 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 | ||
: 17. Gross Electrical Energy Generated (MVH) | : 14. Hours Generator On-Line 672.0 1,416.0 _ | ||
: 18. Net Electrical Energy Generated (HVH) | 64,488.0 | ||
: 19. Unit Service Factor | : 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | ||
:20. Unit Availability Factor | : 16. Gross' Thermal Energy Generated (MVH) 1,631,313 3,601,619 163,857,886 | ||
: 17. Gross Electrical Energy Generated (MVH) 537,460 1,192,390 | |||
: 22. Unit Capacity Factor (Using DER Net) | _53,858,932 | ||
L | : 18. Net Electrical Energy Generated (HVH) 509,660 1,134,424 51,077,814 | ||
: 19. Unit Service Factor 100.0 100.0 85.7 | |||
:20. Unit Availability Factor 100.0 100.0 85.7 | |||
.21. Unit Capacity Factor (Using HDC Net) 91.6 96.7 83.0 | |||
: 22. Unit Capacity Factor (Using DER Net) 91.5 96.6 81.9 l> | |||
:23. Unit Forced Outage Rate 0 | |||
0.0 4.5 l1 | |||
: 24. Shutdowns Scheduled over Next 6 Honths (Type, Date, and Duration of Each): | |||
L | |||
.N/A | |||
= | |||
25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A | 25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A | ||
: 26. Units In Test Status (Prior to Commercial Operation): | : 26. Units In Test Status (Prior to Commercial Operation): | ||
Forecast | Forecast Achieved l | ||
INITIAL CRITICALITY | INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 i | ||
Form 2/30 9007190159 900711 ADOCK0500g4 DR}} | |||
Latest revision as of 14:44, 17 December 2024
| ML20055F757 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/28/1990 |
| From: | Dennis Morey ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20055F742 | List: |
| References | |
| NUDOCS 9007190159 | |
| Download: ML20055F757 (1) | |
Text
.
1 OPERATING DATA REPORT DOCKET No.
50-364 DATE 3/2/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes
- 1. Unit Names-
-Joseph H. Farley - Unit 2
- 1) Cumulative data since
- 2. Reporcing Period:
Februhry 1990 7-30-81, date of
-3.-Licensed Thermal Power (HWt):
2,65E' commercial operation.
4.-Nameplate Rating (Gross HWe):
860
- 5. Design Electrical Rating (Net HWe):
829
- 6. Maximum Dependable Capacity (Gross HWe):
868.6
- 7. Maximum Dependable Capacity (Net HWe):
828.2
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net HVe):
N/A
+
- 10. Reasons For Restrictions, If Any:
N/A This Month Tr-to-Date Cumulative
- 11. Hours In Reporting Period 672 1,416 75,265
- 12. Number Of Hours Reactor Vas Critical 672.0 1,416 65,299.1 l
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 672.0 1,416.0 _
64,488.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross' Thermal Energy Generated (MVH) 1,631,313 3,601,619 163,857,886
- 17. Gross Electrical Energy Generated (MVH) 537,460 1,192,390
_53,858,932
- 18. Net Electrical Energy Generated (HVH) 509,660 1,134,424 51,077,814
- 19. Unit Service Factor 100.0 100.0 85.7
- 20. Unit Availability Factor 100.0 100.0 85.7
.21. Unit Capacity Factor (Using HDC Net) 91.6 96.7 83.0
- 22. Unit Capacity Factor (Using DER Net) 91.5 96.6 81.9 l>
- 23. Unit Forced Outage Rate 0
0.0 4.5 l1
- 24. Shutdowns Scheduled over Next 6 Honths (Type, Date, and Duration of Each):
L
.N/A
=
25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 i
Form 2/30 9007190159 900711 ADOCK0500g4 DR