Operating Licenso Nos. NPF-39 and NPF45 for Limerick Generating Station (LGS), Units 1 and 2.
Operating Licenso Nos. NPF-39 and NPF45 for Limerick Generating Station (LGS), Units 1 and 2.
This TS Change Request involves increasing the survoillance interval for the functional test of the Reactor Protection System (RPS) electrical power monitoring channels, conta:ned in TS section 4.8.4.3.a. from every six (6) months to each time the plant is in cold shutdown for a period of 24 hours, unless the test was performed in the previous six months. This TS Change Request is based on the guidance set forth in NRC Generic Letter 91-09 " Modification Of Surveillance interval For The Electrical Protective Assemblies in Power Supplios For The Reactor Protection System."
This TS Change Request involves increasing the survoillance interval for the functional test of the Reactor Protection System (RPS) electrical power monitoring channels, conta:ned in TS section 4.8.4.3.a. from every six (6) months to each time the plant is in cold shutdown for a period of 24 hours, unless the test was performed in the previous six months. This TS Change Request is based on the guidance set forth in NRC Generic Letter 91-09 " Modification Of Surveillance interval For The Electrical Protective Assemblies in Power Supplios For The Reactor Protection System."
The NRC has previously approved a similar request for Detroit Edison Company, Fermi 2, by letter dated December 27,1991.
The NRC has previously approved a similar request for Detroit Edison Company, Fermi 2, by {{letter dated|date=December 27, 1991|text=letter dated December 27,1991}}.
Information supporting this TS Chango Request is contained in Attachment 1 to this letter, and the proposed replacement pages for the LGS, Unit 1 and Unit 2 TS are contained in Attachment 2.
Information supporting this TS Chango Request is contained in Attachment 1 to this letter, and the proposed replacement pages for the LGS, Unit 1 and Unit 2 TS are contained in Attachment 2.
We requrest that, if approved, this TS Change Request for LGS, Units 1 and 2, be effective upon issuanco.
We requrest that, if approved, this TS Change Request for LGS, Units 1 and 2, be effective upon issuanco.

Latest revision as of 20:44, 31 May 2023

Application for Amends to Licenses NPF-39 & NPF-85, Increasing Surveillance Interval for Functional Test of RPS Electrical Power Monitoring Channels,Contained in TS 4.8.4.3.a
ML20065E510
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/28/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065E514 List:
References
NUDOCS 9404080216
Download: ML20065E510 (7)


Text

. . - -- .._

. Stztlon Support D psttmsnt -

t lb i

~ ; 9-~~-

PECO ENERGY r 32",t=>,,,,,

L 905 Chowrbrook Boulevard Wayne, PA 19087-5091 10CFR50.90 March 28,1994 Docket Nos. 50 352 50-353 Ucense Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Umorick Generating Station. Units 1 and 2 Technical Specifications Change Roquest Gentlemen:

PECO Energy Company is submitting Techr'ical Specifications (TS) Change Request No.92-054, in accordance with 10CFRSO.90, requesting a change to the TS (i.e., Appendix A) of.

Operating Licenso Nos. NPF-39 and NPF45 for Limerick Generating Station (LGS), Units 1 and 2.

This TS Change Request involves increasing the survoillance interval for the functional test of the Reactor Protection System (RPS) electrical power monitoring channels, conta:ned in TS section 4.8.4.3.a. from every six (6) months to each time the plant is in cold shutdown for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the test was performed in the previous six months. This TS Change Request is based on the guidance set forth in NRC Generic Letter 91-09 " Modification Of Surveillance interval For The Electrical Protective Assemblies in Power Supplios For The Reactor Protection System."

The NRC has previously approved a similar request for Detroit Edison Company, Fermi 2, by letter dated December 27,1991.

Information supporting this TS Chango Request is contained in Attachment 1 to this letter, and the proposed replacement pages for the LGS, Unit 1 and Unit 2 TS are contained in Attachment 2.

We requrest that, if approved, this TS Change Request for LGS, Units 1 and 2, be effective upon issuanco.

f I" n & , w

  1. 0 A l 940408 216'940320 @q PDR

.p ADDCK 0500 2g - I , <,

I v I

', March 28,1994 i Page 2 -i i

l if you have any questions, please do not hesitate to contact us. .

l Very truly yours,

. d. , C.

/

G. A. Hunger, Jr.,

Director Ucensing Section Attachments cc: T. T. Martin, Administrator, Region I, USNRC (w/ attachments)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments)

W P. Dornsife, Director, PA Bureau of Radiological Protection (w/ attachments)

~n.

COMMONWEALTH OF PENNSYLVANIA .

ss.

COUl4TY OF CHESTER  :

D. R. Helwig, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the enclosed Technical Specifications Change Request No. 92-05-0 " increased Surveillance Interval For The Reactor Protection System Electrical Power Monitoring Channels," for Limerick Generating Station, Unit 1 and Unit 2, Faclilty Operating License Nos. NPF-39 and NPF-85, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief. ,

Ns ,,-

Vice President Subscribed and sworn to before me this ay 0 k it 994.

V f,I

( L i er.+L A h, . w '

Notary Public P** mal smi wn-unne$ g%

$