MONTHYEARCP-202400424, (Cpnpp), Core Operating Limits Report (Colr), Unit 2 Cycle 22, (ERX-24-001, Revision 0)2024-11-0404 November 2024 (Cpnpp), Core Operating Limits Report (Colr), Unit 2 Cycle 22, (ERX-24-001, Revision 0) IR 05000445/20240032024-10-30030 October 2024 Integrated Inspection Report 05000445/2024003 and 05000446/2024003 IR 05000445/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000445/2024404 and 05000446/2024404 (Public) IR 07200074/20244012024-10-10010 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200074/2024401 Public 05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-10-0303 October 2024 Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-09-30030 September 2024 Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24031A6322024-09-11011 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Letter ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24228A2252024-08-22022 August 2024 Relief to Use Later Code Edition for Inservice Inspection Program ML24179A0772024-08-20020 August 2024 Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants 05000445/LER-1924-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications 05000445/LER-2024-001, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3022024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Pierite, M, Tunica-Biloxi Tribe of Louisiana ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A3012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Parton, T, Wichita and Affiliated Tribes ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma 2024-09-30
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARCP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 3 CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 ML23164A2232023-06-13013 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 1 CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300270, (CPNPP) - Response to Request for Supplemental Information for License Amendment Request to Adopt 10 CFR 50.59, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0808 June 2023 (CPNPP) - Response to Request for Supplemental Information for License Amendment Request to Adopt 10 CFR 50.59, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review TXX-2304, (Cpnpp), Response to Request for Information for Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022023-06-0101 June 2023 (Cpnpp), Response to Request for Information for Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202200481, Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST)2022-12-0707 December 2022 Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST) CP-202200357, (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report2022-09-14014 September 2022 (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report ML22228A0942022-08-17017 August 2022 Notification of Inspection (NRC Inspection Report 05000445/2022004 and 05000446/2022004) and Request for Information CP-202200123, (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times.2022-03-29029 March 2022 (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times. CP-202100694, (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-10-25025 October 2021 (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections CP-202000428, (CPNPP) - Response to Request for Additional Information Regarding Proposed Alternative SNB-1 for a One-Time Extension of Snubber Testing2020-08-0505 August 2020 (CPNPP) - Response to Request for Additional Information Regarding Proposed Alternative SNB-1 for a One-Time Extension of Snubber Testing TXX-2003, Response to Request for Additional Information Regarding Exigent License Amendment 20-003 Revision to Technical Specification 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program2020-04-14014 April 2020 Response to Request for Additional Information Regarding Exigent License Amendment 20-003 Revision to Technical Specification 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program CP-202000273, Response to Request for Additional Information Regarding Snubber Testing (SNB-1) and Snubber Visual Examination (SNB-2) Relief Requests2020-04-13013 April 2020 Response to Request for Additional Information Regarding Snubber Testing (SNB-1) and Snubber Visual Examination (SNB-2) Relief Requests CP-202000024, Response to NRC Request for Additional Information on Biennial Review of Procedures and Station Operations Review Committee Meetings2020-01-14014 January 2020 Response to NRC Request for Additional Information on Biennial Review of Procedures and Station Operations Review Committee Meetings CP-201800659, (Cpnpp), Unit 1 - Response to Request for Additional Information Regarding Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, 11DC Sources - Operating, Condition B2018-09-20020 September 2018 (Cpnpp), Unit 1 - Response to Request for Additional Information Regarding Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, 11DC Sources - Operating, Condition B CP-201700904, Response to Request for Additional Information Regarding Relief Request 1/2B3-2 for the Units 1 and 2 Third Ten Year Inservice Inspection Interval2017-11-0101 November 2017 Response to Request for Additional Information Regarding Relief Request 1/2B3-2 for the Units 1 and 2 Third Ten Year Inservice Inspection Interval CP-201600934, Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89))2016-09-29029 September 2016 Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89)) CP-201600328, Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89))2016-03-29029 March 2016 Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments (CPNPP Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89)) CP-201600136, and Independent Spent Fuel Storage Installation (Isfsi), Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments2016-03-14014 March 2016 and Independent Spent Fuel Storage Installation (Isfsi), Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments CP-201600177, Supplemental to Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels2016-03-0303 March 2016 Supplemental to Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels CP-201600148, Requesting Additional Information for Relief Request b-9 for Unit 2 Second Ten Year Inservice Inspection Interval2016-03-0202 March 2016 Requesting Additional Information for Relief Request b-9 for Unit 2 Second Ten Year Inservice Inspection Interval CP-201600147, Revision Response to Request for Additional Information Regarding for Relief Request B-3 for Second Ten Year Interval Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code Section XI, 2000 Addenda.2016-03-0202 March 2016 Revision Response to Request for Additional Information Regarding for Relief Request B-3 for Second Ten Year Interval Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code Section XI, 2000 Addenda. ML16057A3092016-02-15015 February 2016 Response to Request for Additional Information Re Relief Request 1B3-3 ML16057A3102016-02-12012 February 2016 Westinghouse LTR-PAFM-16-8 Attachment B - Responses to the NRC RAIs Re Comanche Peak Unit 1 Extension of Required Inspection Frequency for Reactor Vessel Inlet Nozzle Dissimilar Metal Welds from 7 to 9 Calendar Years CP-201600048, Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels2016-01-27027 January 2016 Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels CP-201501102, Response to Request for Additional Information for Relief Request B-10 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME, Section...)2015-12-14014 December 2015 Response to Request for Additional Information for Relief Request B-10 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME, Section...) CP-201501101, Response to Request for Additional Information for Relief Request B-9 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....)2015-12-14014 December 2015 Response to Request for Additional Information for Relief Request B-9 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) CP-201501104, Response to Request for Additional Information for Relief Requests B-15, C-2, and C-4 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition Of.2015-12-14014 December 2015 Response to Request for Additional Information for Relief Requests B-15, C-2, and C-4 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition Of. CP-201501103, Response to Request for Additional Information for Relief Request B-11 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....)2015-12-14014 December 2015 Response to Request for Additional Information for Relief Request B-11 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) CP-201501100, Response to Request for Additional Information for Relief Request B-3 for the Second Ten-Year Inservice Inspection Interval Fram 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....)2015-12-14014 December 2015 Response to Request for Additional Information for Relief Request B-3 for the Second Ten-Year Inservice Inspection Interval Fram 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) CP-201501130, ISFSI - Transmittal of Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments2015-12-0909 December 2015 ISFSI - Transmittal of Additional Information Regarding Application for Order Approving Transfer of Licenses and Conforming License Amendments CP-201500740, Submittal of Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reanalysis Report2015-09-22022 September 2015 Submittal of Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reanalysis Report CP-201500810, Compliance with NRC Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Response to Request for Additional Information (Order Number EA-12-051)2015-08-13013 August 2015 Compliance with NRC Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Response to Request for Additional Information (Order Number EA-12-051) CP-201500749, Response to Request for Additional Information for License Amendment Request 14-002, Extension of Containment Leakage Test Frequency2015-07-29029 July 2015 Response to Request for Additional Information for License Amendment Request 14-002, Extension of Containment Leakage Test Frequency CP-201500685, Response to Request for Additional Information for Relief Request 2A3-1, Unit 2, Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 & 2.2015-07-22022 July 2015 Response to Request for Additional Information for Relief Request 2A3-1, Unit 2, Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 & 2. 2024-08-15
[Table view] |
See also: IR 05000445/2022004
Text
August 17, 2022
Mr. Ken J. Peters
Senior Vice President and Chief Nuclear Officer
Attention: Regulatory Affairs
Vistra Operations Company LLC
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF
INSPECTION (NRC INSPECTION REPORT 05000445/2022004 AND
05000446/2022004) AND REQUEST FOR INFORMATION
Dear Mr. Peters:
During the week of October 24, 2022, two inspectors from the U.S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Comanche Peak Nuclear Power Plant, using NRC Inspection
Procedure 71111.11B, Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups:
The first group (Section A of the enclosure) identifies information to be provided prior to
the inspection to ensure that the inspectors are adequately prepared.
The second group (Section B of the enclosure) identifies the information the inspectors
will need upon arrival at the site.
The third group (Section C of this enclosure) identifies the items which are necessary to
close out the inspection and are usually sent a few weeks after the team has left the site.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Terry Jank of your training organization.
Our inspection dates are subject to change based on your updated schedule of examination
activities. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Bryan Bergeon at (817) 200-1415 (Bryan.Bergeon@nrc.gov).
K. Peters 2
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Signed by Gepford, Heather
on 08/17/22
Heather J. Gepford, Chief
Operations Branch
Division of Operating Reactor Safety
Docket No. 50-445; 50-446
License No. NPF-87; NPF-89
Enclosure:
Biennial Requalification Inspection
Request for Information
ML22228A094
OFFICE OE:OB C:OB
NAME BBergeon HGepford
SIGNATURE BAB HJG
DATE 08/16/2022 08/17/2022
Initial Request for Information
Biennial Requalification Inspection
Comanche Peak Nuclear Power Plant
Inspection Report: 5000445/2022004; 5000446/2022004
Inspection Dates: October 24, 2022 - October 28, 2022
Inspection Procedure: IP 71111.11B, Licensed Operator Requalification
Program
Lead Inspector: Bryan Bergeon, Operations Engineer
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format
on CD/DVD in order to arrive at the Region IV office no later than October 10, 2022;
OR uploaded to the NRCs secure Box application no later than October 10, 2022.
CD/DVD to: US Nuclear Regulatory Commission, Region IV
ATTN: Bryan Bergeon / Heather Gepford
1600 E. Lamar Blvd
Arlington, TX 76011
General Requests:
List of licensed operators (SRO & RO) by crew (operating & staff)
Training and Operations Department organization charts (with qualified LOR
evaluators identified)
Procedures that identify process for revising and maintaining LO continuing training
program up to date
List of outstanding LOR program changes
List of plant events and industry operating experience incorporated into LOR
program since last BRQ
Audits and/or self-assessment reports addressing the licensed operator
requalification training program
Last 2 years of simulator review committee (or equivalent) meeting minutes
Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
A summary report of all condition reports related to operator actions/errors in the
control room
Any revised requalification training that was based on licensed operator performance
issues
03.04a: Biennial Requalification Written Examinations
The current and approved biennial written examination schedule
The current requalification cycle written examination results for both SRO & RO that
have already been administered up to the week prior to the inspection team arrival
onsite.
All written examinations that have been approved for administration up to and
including the week before the inspection team is onsite. This will need to have
adequate password protection or double envelope protection if mailed via regular
mail per NUREG-1021.
The current requalification cycle examination methodology (sample plan)
03.04b: Annual Requalification Operating Tests
The schedule for the operating tests (JPMs & scenarios) to be given the week of
October 24, 2022
The operating tests (JPMs & scenarios) (password protected and provide separately
via telephone at later date) to be given the week of October 24, 2022
Current requalification cycle operating tests (SRO & RO) and results up to the week
prior to the inspection team arrival onsite
All 2021 NRC required annual operating tests
Current requalification cycle operating test methodology (sample plan)
03.04c: Administration of an Annual Requalification Operating Test
All procedures used to administer the annual operating test
All procedures used to assess operator performance
All procedures that describe conduct of simulator training
All procedures used to test, operate, and maintain the simulator
03.04d: Requalification Examination Security
Submit any tracking tools that you use as a means to prevent excessive overlap on
the written examinations and also meet the intent of sampling all required topics on a
periodic basis.
Submit any tracking tools that you use as a means to prevent excessive overlap on
the operating tests and also meet the intent of sampling all required malfunctions
(including major events, instrument/component malfunctions, TS calls, etc.) on a
periodic basis.
All procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current exam cycle tests and prior year examinations
List of all condition reports since the last biennial requalification inspection related to
examination security and overlap
03.04e: Remedial Training and Re-Examinations
List of remedial training conducted or planned since last requalification exam
(includes training provided to operators to enable passing requalification exam and
training provided to correct generic or individual weaknesses observed during
previous requalification exam cycle)
Remediation plans (lesson plans, reference materials, and attendance
documentation)
03.04f: Operator License Conditions
All procedures and program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators
All procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection
03.04g: Control Room Simulator
All simulator management and configuration procedures if not already provided
Simulator discrepancy report summary list for all open discrepancy reports and
summary list for those items closed between October 1, 2020 and October 10, 2022
Primary parameters tested in order to verify core physics parameters (such as
moderator temperature coefficient, integral rod worth)). The applicable reference
graphs from the plant physics data book (electronic or other means as available)
should also be included as well as the test procedures used and the acceptance
criteria with results.
All simulator modification packages that are on hold, delayed, or not completed in the
last 2 years
A list of simulator modification packages completed in the last two-year window
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on October 24, 2022.
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written
Exam and Annual Requalification Operating Tests Quality
All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
onsite week, if available
All results up to the day the team leaves the site
03.04f: Conformance with Operator License Conditions
Access to licensed operators records (operating and staff crews)
Access to licensed operators training attendance records
Access to licensed operators medical records
03.04g: Control Room Simulator Performance
Simulator discrepancies from October 1, 2020 to October 24, 2022. This should
include all open and closed simulator discrepancy reports, including the
documentation/justification for closure.
Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available)
Documentation that validates current models, including the thermal-hydraulics and
neutronics models, to the actual plant
All current model deficiencies, including FSAR vs Design differences in the simulator
(any documentation on this)
Summary list of modifications from October 1, 2020 to October 24, 2022
Plant modifications (both hardware and software) completed on the simulator by due
date from October 1, 2020 to October 24, 2022
Simulator differences Lesson plan used in training (current to October 24, 2022)
The complete book of all simulator annual performance test packages (usually in a
single book but may be electronic or in single test packages), complete with all
transient tests, steady state tests, and malfunction tests. This should also include
the test procedures for each test, the acceptance criteria, and results. For each
transient test, the reference chart should be included or an equivalent subject matter
expert review versus the simulator results with a write-up for any differences beyond
the ANSI standard requirements.
All test packages used to verify core physics parameters (such as moderator
temperature coefficient and integral rod worth). The applicable reference graphs
from the plant physics data book (electronic or other means as available) should also
be included as well as the test procedures used and the acceptance criteria with
results.
All simulator tests, configuration management, and related documents available in
the room for inspectors to review. This includes training needs analysis packages,
simulator review committee meeting minutes, etc.
Current copy of ANSI 3.5 standard you are committed to for simulator testing
C. Comanche Peak Nuclear Power Plant is required to send the final results summary
(see Table 1 below) and any remaining exams and operating tests that have not been
reviewed to the regional office lead inspector for this inspection for final review and
comparison against the Significance Determination Tools in order to communicate
the exit results for the inspection.
TABLE 1: EXAMINATION RESULTS
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification
examination required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator
scenario failures).
4. Divide line 3 by line 2 to obtain the individual requalification
examination failure rate. Line 3/Line 2. %
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a).
6. Number of crews who performed unsatisfactorily on the
simulator scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario
failure rate. Line 6/Line 5. %