|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:From: Beth Hodsdon <bchodsdon@outlook.com> |
| | Sent: Friday, October 8, 2021 10:55 AM To: NorthAnnaEnvironmental Resource |
| | |
| | ==Subject:== |
| | [External_Sender] Docket ID NRC-2020-0234 I am writing regarding Docket ID NRC-2020-0234, to ask that the NRC mandate a complete environmental review of Dominions request for an 80-year operating license for the North Anna nuclear power plant. Since our family lives in Crozet and Charlottesville, the safety of this plant has an immediate impact on our lives. North Anna nuclear power station is near the epicenter of the 5.7 magnitude earthquake in 2011any permit renewal review must thoroughly account for that kind of risk. In particular, the NRC should require a new Environmental Impact Statement which includes a thorough examination of geologic risks. (This has not been done since the 2011 earthquake.) The NRCs review should include the following: |
| | A new assessment of Severe Accident Mitigation Alternatives (SAMA) conducted by Dominion. |
| | (The last SAMA occurred in 2001.) |
| | Harvesting and testing of components of the North Anna reactors to determine if they can operate safely for 80 years. |
| | A new assessment of the structural integrity of the Lake Anna damn which holds the water for cooling the reactors. |
| | An updated plan for the safe storage of the increasing radioactive waste stored at the power station. |
| | A full public hearing on the license application which allows the public to speak and considers independent expert testimony. |
| | Nuclear power may be a necessary bridge technology to get us through the climate crisisbut it has to be generated safely. Thank you. |
| | Beth Hodsdon, 1656 Mint Springs Road, Crozet, VA 22923 |
| | |
| | Federal Register Notice: 86FR47525 Comment Number: 9 Mail Envelope Properties (MN2PR14MB331107C627EC0FAF3DC0604CA8B29) |
| | |
| | ==Subject:== |
| | [External_Sender] Docket ID NRC-2020-0234 Sent Date: 10/8/2021 10:55:07 AM Received Date: 10/8/2021 10:55:12 AM From: Beth Hodsdon Created By: bchodsdon@outlook.com Recipients: |
| | "NorthAnnaEnvironmental Resource" <NorthAnnaEnvironmental.Resource@nrc.gov> |
| | Tracking Status: None Post Office: MN2PR14MB3311.namprd14.prod.outlook.com Files Size Date & Time MESSAGE 1517 10/8/2021 10:55:12 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:}} |
Latest revision as of 13:41, 18 January 2022
|
---|
Category:General FR Notice Comment Letter
MONTHYEARML24141A2812024-02-27027 February 2024 Comment (5) E-mail Regarding North Anna Suppl Dseis ML24054A0912024-02-22022 February 2024 Comment (4) E-mail Regarding North Anna Suppl Dseis ML24052A3672024-02-21021 February 2024 Comment (3) E-mail Regarding North Anna Suppl Dseis ML24052A3122024-02-20020 February 2024 Comment (7) of Ari Sandler on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Units 1 and 2 ML24052A2592024-02-16016 February 2024 Comment (2) E-mail Regarding North Anna Suppl Dseis ML24045A0072024-02-14014 February 2024 Comment (6) of Anonymous on North Anna Power Station SLR Draft EIS ML24045A0062024-02-13013 February 2024 Comment (5) of Bettina Rayfield on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0042024-02-0606 February 2024 Comment (3) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0052024-02-0606 February 2024 Comment (4) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24011A1502024-01-0909 January 2024 Comment (1) of Anonymous Individual on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML22350A0622022-12-15015 December 2022 Comment (1) of Harmon Curran on Notice of Intent to Conduct Scoping Process and Prepare Supplement to Draft Environmental Impact Statement Virginia Electric and Power Company North Anna Power, Units 1 and 2 ML22339A2412022-11-21021 November 2022 Comment (1) E-mail Regarding North Anna Suppl Scoping ML21298A1412021-10-14014 October 2021 Comment (12) E-mail Regarding North Anna SLR Draft SEIS ML21285A3082021-10-12012 October 2021 Comment (10) E-mail Regarding North Anna SLR Draft SEIS ML21286A7492021-10-12012 October 2021 Comment (12) of Leo J Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7502021-10-12012 October 2021 Comment (13) of Danielle Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7482021-10-12012 October 2021 Comment (11) of Denise Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21285A3232021-10-12012 October 2021 Comment (11) E-mail Regarding North Anna SLR Draft SEIS ML21286A7472021-10-12012 October 2021 Comment (10) on Alex Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7462021-10-11011 October 2021 Comment (9) of Concerned Citizen on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0112021-10-10010 October 2021 Comment (8) E-mail Regarding North Anna SLR Draft SEIS ML21284A0102021-10-10010 October 2021 Comment (7) E-mail Regarding North Anna SLR Draft SEIS ML21286A7452021-10-0909 October 2021 Comment (8) of Patricia Gordon on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7422021-10-0909 October 2021 Comment (6) of Kate Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7442021-10-0909 October 2021 Comment (7) from Sierra Club on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7412021-10-0909 October 2021 Comment (5) of William Johnson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21286A7402021-10-0808 October 2021 Comment (4) of Donna Shaunesey on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0122021-10-0808 October 2021 Comment (9) E-mail Regarding North Anna SLR Draft SEIS ML21281A0222021-10-0707 October 2021 Comment (4) E-mail Regarding North Anna SLR Draft SEIS ML21286A7392021-10-0707 October 2021 Comment (3) of John Surr on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21281A0252021-10-0707 October 2021 Comment (6) E-mail Regarding North Anna SLR Draft SEIS ML21281A0232021-10-0707 October 2021 Comment (5) E-mail Regarding North Anna SLR Draft SEIS ML21279A0182021-10-0505 October 2021 Comment (2) E-mail Regarding North Anna SLR Draft SEIS ML21279A0192021-10-0505 October 2021 Comment (3) E-mail Regarding North Anna SLR Draft SEIS ML21277A1372021-09-28028 September 2021 Comment (1) E-mail Regarding North Anna SLR Draft SEIS ML21272A3522021-09-16016 September 2021 Comment (2) of Judy Lamana on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21245A3892021-09-0101 September 2021 Comment (1) of Eric Hendrixson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML20332A1182020-11-25025 November 2020 Comment (125) of Shira Futterman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2242020-11-23023 November 2020 Comment (86) of Jean Stokes on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2332020-11-23023 November 2020 Comment (88) of Rayhan Daudani on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2302020-11-23023 November 2020 Comment (89) of Michael Chenkovich on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0572020-11-23023 November 2020 Comment (94) of Alison Kaufmann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2342020-11-23023 November 2020 Comment (90) of Paula Chow on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0582020-11-23023 November 2020 Comment (95) of Darius Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0552020-11-23023 November 2020 Comment (92) of Igor Prskalo on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20332A0612020-11-23023 November 2020 Comment (97) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20329A4252020-11-23023 November 2020 Comment (67) of Elena Day on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Correction ML20329A4242020-11-23023 November 2020 Comment (66) of Brenda Finchum on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4232020-11-23023 November 2020 Comment (65) of Jonathan Bransky to Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4212020-11-23023 November 2020 Comment (63) of Cathy Horne on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 2024-02-06
[Table view] |
Text
From: Beth Hodsdon <bchodsdon@outlook.com>
Sent: Friday, October 8, 2021 10:55 AM To: NorthAnnaEnvironmental Resource
Subject:
[External_Sender] Docket ID NRC-2020-0234 I am writing regarding Docket ID NRC-2020-0234, to ask that the NRC mandate a complete environmental review of Dominions request for an 80-year operating license for the North Anna nuclear power plant. Since our family lives in Crozet and Charlottesville, the safety of this plant has an immediate impact on our lives. North Anna nuclear power station is near the epicenter of the 5.7 magnitude earthquake in 2011any permit renewal review must thoroughly account for that kind of risk. In particular, the NRC should require a new Environmental Impact Statement which includes a thorough examination of geologic risks. (This has not been done since the 2011 earthquake.) The NRCs review should include the following:
A new assessment of Severe Accident Mitigation Alternatives (SAMA) conducted by Dominion.
(The last SAMA occurred in 2001.)
Harvesting and testing of components of the North Anna reactors to determine if they can operate safely for 80 years.
A new assessment of the structural integrity of the Lake Anna damn which holds the water for cooling the reactors.
An updated plan for the safe storage of the increasing radioactive waste stored at the power station.
A full public hearing on the license application which allows the public to speak and considers independent expert testimony.
Nuclear power may be a necessary bridge technology to get us through the climate crisisbut it has to be generated safely. Thank you.
Beth Hodsdon, 1656 Mint Springs Road, Crozet, VA 22923
Federal Register Notice: 86FR47525 Comment Number: 9 Mail Envelope Properties (MN2PR14MB331107C627EC0FAF3DC0604CA8B29)
Subject:
[External_Sender] Docket ID NRC-2020-0234 Sent Date: 10/8/2021 10:55:07 AM Received Date: 10/8/2021 10:55:12 AM From: Beth Hodsdon Created By: bchodsdon@outlook.com Recipients:
"NorthAnnaEnvironmental Resource" <NorthAnnaEnvironmental.Resource@nrc.gov>
Tracking Status: None Post Office: MN2PR14MB3311.namprd14.prod.outlook.com Files Size Date & Time MESSAGE 1517 10/8/2021 10:55:12 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: