{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 19, 2021 Mr. Franz Hilbert Orano NCS GmbH Margarete-von-Wrangell-Strae 7 D-63457 Hanau - GERMANY
 
==SUBJECT:==
APPLICATION FOR THE MODEL NO. DN30-X PACKAGE - ACCEPTANCE LETTER
 
==Dear Mr. Hilbert:==
 
By {{letter dated|date=June 29, 2021|text=letter dated June 29, 2021}} (Agencywide Documents Access and Management System Package Accession No. ML21181A000), Daher Nuclear Technologies GmbH (DAHER NT) submitted an application for approval of the Model No. DN30-X package. The application is for a new package design for shipment of uranium hexafluoride with an enrichment up to 20%. The U.S. Nuclear Regulatory Commission (NRC) staff performed an acceptance review of your application and Orano NCS GmbH responded to our September 22, 2021, request for supplemental information by {{letter dated|date=October 8, 2021|text=letter dated October 8, 2021}} (ADAMS No. ML21281A046).
The revised application appears to contain the necessary information to begin our detailed technical review. The schedule allows for the NRC staff to issue a possible request for additional information by mid-March 2022, and, if no additional information is needed, issue a certificate of compliance by the end of August 2022. The staff estimates that completing the safety review of this application will require approximately 1250 staff hours.
Please reference Docket No. 71-9388 and Enterprise Project Identifier (EPID) No. L-2020-NEW-0003 in future correspondence related to this request.
Sincerely, Signed by Saverot, Pierre on 10/19/21 Pierre M. Saverot, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 71-9388 EPID L-2020-NEW-0003
 
ML21291A064 E=With attachment/enclosure        N=No copy            C=Without attachment/enclosure OFFICE            DFM E            DFM      C        DFM NAME              PSaverot        WWheatley        JMcKirgan DATE                10/14/2021        10/18/2021      10/19/2021
 
ML21291A064; Ltr ML21291A064 OFFICE              NMSS/DFM/STLB NMSS/DFM/STLB    NMSS/DFM/STLB    NMSS/DFM/STLB NAME                PSaverot    PS WWheatley    WW JMcKirgan    JM PSaverot    PS DATE                Oct 18, 2021    Oct 18, 2021    Oct 19, 2021    Oct 19, 2021}}

Latest revision as of 13:23, 18 January 2022

Application for the Model No. DN-30X- Acceptance Letter
ML21291A064
Person / Time
Site: 07109388
Issue date: 10/19/2021
From: Pierre Saverot
Storage and Transportation Licensing Branch
To: Hilbert F
Orano NCS GmbH
Pierre Saverot NMSS/DFM/STLB 301-4157505
References
EPID L-2020-NEW-0003
Download: ML21291A064 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 19, 2021 Mr. Franz Hilbert Orano NCS GmbH Margarete-von-Wrangell-Strae 7 D-63457 Hanau - GERMANY

SUBJECT:

APPLICATION FOR THE MODEL NO. DN30-X PACKAGE - ACCEPTANCE LETTER

Dear Mr. Hilbert:

By letter dated June 29, 2021 (Agencywide Documents Access and Management System Package Accession No. ML21181A000), Daher Nuclear Technologies GmbH (DAHER NT) submitted an application for approval of the Model No. DN30-X package. The application is for a new package design for shipment of uranium hexafluoride with an enrichment up to 20%. The U.S. Nuclear Regulatory Commission (NRC) staff performed an acceptance review of your application and Orano NCS GmbH responded to our September 22, 2021, request for supplemental information by letter dated October 8, 2021 (ADAMS No. ML21281A046).

The revised application appears to contain the necessary information to begin our detailed technical review. The schedule allows for the NRC staff to issue a possible request for additional information by mid-March 2022, and, if no additional information is needed, issue a certificate of compliance by the end of August 2022. The staff estimates that completing the safety review of this application will require approximately 1250 staff hours.

Please reference Docket No. 71-9388 and Enterprise Project Identifier (EPID) No. L-2020-NEW-0003 in future correspondence related to this request.

Sincerely, Signed by Saverot, Pierre on 10/19/21 Pierre M. Saverot, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 71-9388 EPID L-2020-NEW-0003