DN30-X PACKAGE FOR THE TRANSPORT OF HALEU < 20% ENRICHMENT
- PUBLIC -
FEBRUARY 17, 2021 US-NRC / DNT / TLI Washington D.C.
Introduction of participants
- 1. Recap
- 2. Design of the DN30-X package 2.1 New concept 2.2 The DN30 PSP 2.3 The 30B-X cylinder 2.4 CCS of the 30B-X cylinder
- 3. DN30-X safety proof 3.1 Overview and similarities of DN30 and DN30-X 3.2 Structural analysis 3.3 Criticality analysis
- 4. Licensing schedule and next steps TOPICS Page 2 0045-PRT-2021-001-REV0-NRC-PREAPPLICATION-17-02-2021
Context
New industry demands for higher enrichments (SMR and HALEU projects)
Cylinders defined in ANSI N14.1 (5B, 8A, 30B)
Solution: DN30-X package
DN30 PSP
Safety proof updates since 1st pre-application meeting in June 2020
Structural analysis (takes current design into account)
Criticality analysis: benchmark evaluation with TSUNAMI Page 3 RECAP 0045-PRT-2021-001-REV0-NRC-PREAPPLICATION-17-02-2021 Previous design Current design
Page 4 DESIGN OF DN30-X: NEW CONCEPT 30B Cylinder 30B-X Cylinder DN30 PSP 0045-PRT-2021-001-REV0-NRC-PREAPPLICATION-17-02-2021 Concept for DN30-X Concept for DN30
Type AF package with the DN30 PSP and the 30B-X cylinder
DN30 PSP unchanged from the licensed DN30 package
Modified 30B-X cylinder with criticality control features Fully compliant with 10 CFR 71 and SSR-6; no changes or exceptions required
Different designs for optimized UF6 capacity Page 5 DESIGN OF DN30-X: PACKAGE Cylinder Enrichment in %
UF6 Capacity Licensing Status lb kg 5B 100 54.9 24.9 No PSP 8A 12.5 255 115 No PSP 30B 5
5020 2277 DN30 PSP 30B-10 10 3527 1600 DN30 PSP 30B-20 20 2756 1250 DN30 PSP 0045-PRT-2021-001-REV0-NRC-PREAPPLICATION-17-02-2021
The DN30 PSP as part of the DN30 package
Designed to accommodate a standard 30B cylinder
Provides mechanical and thermal protection for the cylinder during NCT and HAC Passed the NCT and HAC drop tests with fully loaded cylinders Package passed the HAC fire test even with an empty cylinder
DN30 package is licensed in the US and France with max. 5 % enrichment Validations in all relevant countries available More than 250 DN30 PSPs in operation today, 80 more will become available this year The DN30 PSP as part of the DN30-X package
Unchanged design, but accommodates the modified 30B-X cylinder Page 6 DESIGN OF DN30-X: DN30 PSP 0045-PRT-2021-001-REV0-NRC-PREAPPLICATION-17-02-2021
www.daher.com - www.tbm.aero DAHER NUCLEAR TECHNOLOGIES GmbH Margarete-von-Wrangell-Strae 7 D-63457 Hanau Yara van Wijk y.vanwijk@daher.com
+49(0)6181 501 353