Text

Orano NCS GmbH, Margarete-von-Wrangell-Strae 7, 63457 Hanau, Deutschland Telefon: +49 (0) 61 81 501-0, E-Mail: info.ncs@orano-ncs.com, www.orano-ncs.com Sitz der Gesellschaft: Hanau, RG Hanau HR B 4428, USt-Id.-Nr. DE113574961, Gerichtsstand: Hanau, Geschftsführer: Olaf Oldiges aBankverbindung: Société Générale Frankfurt (BLZ 512 108 00), Konto: 1095013031, SWIFT: SOGEDEFF, IBAN: DE 45 5121 0800 1095 0130 31 Auftrge werden auf Grundlage unserer Allgemeinen Geschftsbedingungen übernommen. Diese stehen Ihnen auf Wunsch zur Verfügung.

SV-0815-v4-GF Orano NCS GmbH 1/1 Orano NCS GmbH, Margarete-von-Wrangell-Strae 7, D-63457 Hanau Orano NCS GmbH Ms. Tilda Liu, Senior Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Two White Flint North - Mail Stop T4-B34 11545 Rockville Pike Rockville, MD 20852-2738 USA Unsere Zeichen/ Nachricht vom Our ref./ message dd.

Ihre Zeichen/ Nachricht vom Your ref./ message dd.

0045-SVK-2025-004 Telefon/ Phone Telefax/ Fax

+49 61 81 501 353 E-Mail/ Email Yara.vanwijk@orano-ncs.com Datum/ Date March 25, 2025 Proprietary application for renewal of the DN30-X CoC Docket No. 71-9388, EPID No. L-2020-NEW-0003

Dear Ms. Liu,

we herewith submit the proprietary version of the safety analysis report (SAR) for the DN30-X package 0045-BSH-2020-001 (Rev. 4) in accordance with 10 CFR 71, 49 CFR 173 and 10 CFR 2.390, in order to request the renewal of CoC USA/9388/AF-96.

The renewal is necessary to implement the removal of the housing of the valve protecting device from the design of the DN30 PSP (see also CoC USA-9362-AF-96 (Rev. 5) for the DN30 package). Additionally, some design changes are made to the 30B-X cylinder that resulted from manufacturing of and tests with 30B-10 cylinder prototypes. A summary of each implemented change to the package design, including a short discussion about its impact on the safety analysis, is provided in 0045-BSH-2020-001 (Rev. 4), section 2.1.2.2. Whenever necessary, references to more detailed analyses are provided as well.

The proprietary version consists of the complete SAR (including its appendices) and is being submitted to the Document Control Desk. This means that part of the information in this submittal is being withheld from public disclosure because it contains information proprietary to Orano NCS GmbH. The affidavit for withholding from public disclosure is documented in 0045-SVK-2025-005, submitted jointly with this application.

We would appreciate it if you could issue the revised CoC by September 2025 as mainly formal changes were made to the documentation and all changes related to the removal of the housing from the design of the DN30 PSP were already checked in detail in connection with the renewal of CoC USA-9362-AF-96 (Rev. 5) for the DN30 package.

Sincerely, Orano NCS GmbH Sebastian Fels Anirudh Bhesania Calculation Export Project Manager Docusign Envelope ID: F1669AA4-8501-4E13-A044-7A6567B01580