ML25191A056

From kanterella
Jump to navigation Jump to search

Orano NCS Gmbh - Public Application for Renewal of the DN30-X CoC
ML25191A056
Person / Time
Site: 07109388
Issue date: 07/10/2025
From: Bhesania A, Van-Wijk J
Orano NCS GmbH
To: Melendez-Colon D
Division of Fuel Management, Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML25191A055 List:
References
EPID L-2020-NEW-0003
Download: ML25191A056 (1)


Text

Orano NCS GmbH, Margarete-von-Wrangell-Strae 7, 63457 Hanau, Deutschland Telefon: +49 (0) 61 81 501-0, E-Mail: info.ncs@orano-ncs.com, www.orano-ncs.com Sitz der Gesellschaft: Hanau, RG Hanau HR B 4428, USt-Id.-Nr. DE113574961, Gerichtsstand: Hanau, Geschftsführer: Dr. Christoph Geiger BaBankverbindung: Société Générale Frankfurt (BLZ 512 108 00), Konto: 1095013031, SWIFT: SOGEDEFF, IBAN: DE 45 5121 0800 1095 0130 31 AuAuftrge werden auf Grundlage unserer Allgemeinen Geschftsbedingungen übernommen. Diese stehen Ihnen auf Wunsch zur Verfügung.

SV-0815-v6-GF Orano NCS GmbH 0045-SVK-2025-011 - NRC submittal public 1/1 Orano NCS GmbH, Margarete-von-Wrangell-Strae 7, D-63457 Hanau Orano NCS GmbH Ms. Daneira Meléndez Colón, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 USA Unsere Zeichen/ Nachricht vom Our ref./ message dd.

Ihre Zeichen/ Nachricht vom Your ref./ message dd.

0045-SVK-2025-011 Telefon/ Phone Telefax/ Fax

+49 61 81 501 353 E-Mail/ Email Yara.vanwijk@orano-ncs.com Datum/ Date July 10th 2025 Public application for renewal of the DN30-X CoC Docket No. 71-9388, EPID No. L-2020-NEW-0003

Dear Ms. Meléndez Colón,

we herewith submit the public version of the safety analysis report (SAR) for the DN30-X package 0045-BSH-2020-001 (Rev. 5) in accordance with 10 CFR 71, 49 CFR 173 and 10 CFR 2.390, in order to request the renewal of CoC USA/9388/AF-96. This follows the meeting held on June 23rd, 2025 (ML25188A252).

The renewal is necessary to implement the removal of the housing of the valve protecting device from the design of the DN30 PSP (see also CoC USA-9362-AF-96 (Rev. 5) for the DN30 package). Additionally, some design changes are made to the 30B-X cylinder that resulted from manufacturing of and tests with 30B 10 cylinder prototypes. The only change to Rev. 4 of the SAR is the removal of our QAPD as appendix.

The public version of the SAR for the DN30-X package consists of the following documents:

0045-BSH-2020-001-Rev5 - Safety Analysis Report DN30-X Package (main document)

Appendix 1.7.1 Appendix 1.7.2 Appendix 1.7.3 Appendix 1.8.1 The SAR and the above-mentioned appendices are being submitted to the Document Control Desk.

We would appreciate it if you could issue the revised CoC by September 2025 as mainly formal changes were made to the documentation and all changes related to the removal of the housing from the design of the DN30 PSP were already checked in detail in connection with the renewal of CoC USA-9362-AF-96 (Rev. 5) for the DN30 package.

Sincerely, Orano NCS GmbH Yara van Wijk Anirudh Bhesania DN30-X Project Lead Project Manager Docusign Envelope ID: DE2CAF7C-4B0F-4A7C-B38B-53B89FDCA8D7