05000461/FIN-2014005-03: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71152
| Inspection procedure = IP 71152
| Inspector = C Brown, C Lipa, E Sanchez,-Santiago J, Bozga M, Jones R, Jickling S, Bell S, Mischke W, Schau
| Inspector = C Brown, C Lipa, E Sanchez-Santiago, J Bozga, M Jones, R Jickling, S Bell, S Mischke, W Schaup
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Latest revision as of 19:51, 20 February 2018

03
Site: Clinton Constellation icon.png
Report IR 05000461/2014005 Section 4OA2
Date counted Dec 31, 2014 (2014Q4)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71152
Inspectors (proximate) C Brown
C Lipa
E Sanchez-Santiago
J Bozga
M Jones
R Jickling
S Bell
S Mischke
W Schaup
Violation of: 10 CFR 50 Appendix B Criterion III, Design Control
INPO aspect
'