| Q | CCA | Title |
---|
05000461/FIN-2013004-01 | 2013Q3 | H.13 | Failure to Follow Procedure and Appropriately Document Basis for Immediate Operability of the Division 2 Emergency Diesel Generator |
05000461/FIN-2013007-01 | 2013Q3 | P.2 | Failure to Evaluate a Degraded/Non-conforming Condition on Diesel Fire Pump |
05000461/FIN-2013009-01 | 2013Q4 | H.2 | Insulation Resistance Testing for Unit Substation Transformers Was Incorrectly Performed |
05000461/FIN-2013009-02 | 2013Q4 | P.1 P.1(a) | Inadequate Acceptance Criteria in the Insulation Resistance Test Procedure |
05000461/FIN-2013005-02 | 2013Q4 | H.9 | Failure to Implement Requirements of Station Scaffold Installation Procedure |
05000461/FIN-2013005-03 | 2013Q4 | | Failure to Maintain Radiation Exposure ALARA During 1R13 |
05000461/FIN-2013005-04 | 2013Q4 | P.1 | Failure to Identify Embedded Operator Challenge |
05000461/FIN-2013005-05 | 2013Q4 | H.12 | Failure to Assess and Manage Risk Associated with the Performance of Surveillance Testing on Average Power Range Monitors |
05000461/FIN-2013005-01 | 2013Q4 | | Failure to Evaluate Failures of Individual Safe Shutdown Emergency Lighting Units for Maintenance Preventable Functional Failures and Repetitive Maintenance Preventable Functional Failures |
05000461/FIN-2013005-07 | 2013Q4 | | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 1 |
05000461/FIN-2014007-02 | 2014Q1 | H.13 | Failure to Correct Identified Combustibles |
05000461/FIN-2014007-01 | 2014Q1 | | Interpretation of Requirements for Multiple Spurious Operations |
05000461/FIN-2014201-01 | 2014Q2 | | Security |
05000461/FIN-2014003-01 | 2014Q2 | H.5 | Foreign Material in Relay Prevents Emergency Diesel Generator Output Breaker from Closing |
05000461/FIN-2014003-02 | 2014Q2 | | Failure to Develop Adequate Procedures for Pre-Planning and Performing Maintenance Affecting Safety-Related Hydramotor |