05000461/FIN-2014008-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Identify a Level 1 Test Criterion Failure |
Description | The inspectors documented a self-revealing Green finding associated with the failure to follow procedures when performing power ascension testing on the digital feedwater (DFW) system. Specifically, contrary to procedure CPS 2894.01, Digital FWLCS [feedwater level control system] Modifications Test - Power Ascension, Section 9.1, the licensee did not declare a Level 1 criterion failure when unacceptable oscillations were noted during a transition in the power ascension test. This resulted in the licensee declaring the test successful and returning the system to service without taking the appropriate corrective actions to address the oscillations. This contributed to the subsequent scram caused by reactor water level oscillations. The failure to follow procedures when performing power ascension testing on the digital feedwater system was a performance deficiency. The performance deficiency was more than minor because it was associated with the design control attribute of the Initiating Events Cornerstone and adversely affected the cornerstone objective to limit the likelihood of those events that upset plant stability and challenge critical safety functions during shutdown as well as power operations and is therefore a finding. Using IMC 0609, Attachment 4 Initial Characterization of Findings, and Appendix A The Significance Determination Process for Findings at Power , issued June 19, 2012, the finding was determined to be of very low safety significance (Green) because it did not cause a reactor trip with a coincident loss of mitigating equipment. The inspectors determined this finding affected the conservative bias aspect of the of human performance cross-cutting area described as being present when the organization uses decision making practices that emphasize prudent choices over those that are simply allowable. Specifically, the licensee used non-conservative assumptions when determining whether the condition identified during the power ascension test was allowable (H.14). This finding does not involve enforcement action because no violation of regulatory requirements was identified. |
Site: | Clinton ![]() |
---|---|
Report | IR 05000461/2014008 Section 4OA4 |
Date counted | Sep 30, 2014 (2014Q3) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 95001 |
Inspectors (proximate) | C Lipa E Sanchez Santiago R Ruiz |
INPO aspect | |
' | |