Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML12144A164 | | | number = ML12237A148 |
| | issue date = 05/23/2012 | | | issue date = 08/24/2012 |
| | title = IR 05000528-12-008, 05000529-12-008 & 05000530-12-008, 11/13/2012 ;Palo Verde, Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report | | | title = IR 05000528-12-008, 05000529-12-008 & 05000530-12-008, Palo Verde Nuclear Generating Station - IR Cancellation Notification Letter |
| | author name = Farnholtz T R | | | author name = Farnholtz T R |
| | author affiliation = NRC/RGN-IV/DRS/EB-1 | | | author affiliation = NRC/RGN-IV/DRS/EB-1 |
Line 9: |
Line 9: |
| | docket = 05000528, 05000529, 05000530 | | | docket = 05000528, 05000529, 05000530 |
| | license number = NPF-041, NPF-051, NPF-074 | | | license number = NPF-041, NPF-051, NPF-074 |
| | contact person = | | | contact person = Farnholtz T R |
| | document report number = IR-12-008 | | | document report number = IR-12-008 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter |
| | page count = 8 | | | page count = 2 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| [[Issue date::May 23, 2012]] | | [[Issue date::August 24, 2012]] |
|
| |
|
| Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034 | | Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034 |
|
| |
|
| SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - INITIAL INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION REPORT 05000528; 05000529; 05000530/2012008 | | SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NRC INSPECTION REPORT: 05000528/2012008, 05000529/2012008, AND 05000530/2012008 |
|
| |
|
| ==Dear Mr. Edington:== | | ==Dear Mr. Edington:== |
| On November 13, 2012, the NRC will begin a triennial baseline Component Design Bases Inspection at the Palo Verde Nuclear Generating Station. A seven-person team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."
| | NRC Inspection Report 05000528/2012008, 05000529/2012008, and 05000530/2012008 has been cancelled; therefore, no inspection report will be issued. |
|
| |
|
| The inspection focuses on components, operating experience, and operator actions that have high risk and low design margins. The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office preparation week. In addition, a number of operating experience issues will also be selected for review. The inspection will include an information gathering site visit by the team leader and a senior reactor analyst. This will be followed by 3-weeks of onsite inspection by the team. The inspection will consist of five NRC inspectors and two contractors, of which four will focus on engineering and one on operations. The current inspection schedule is as follows: Onsite information gathering visit: Week of October 29, 2012 Preparation Week: November 5, 2012 Onsite weeks: November 13, 2012 November 26, 2012 December 10, 2012 The purpose of the information gathering visit is to meet with members of your staff to identify potential risk-significant components and operator actions. The lead inspector will also request a tour of the plant with members of your operations staff and probabilistic safety assessment staff. During the onsite weeks, several days of time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios. Additional information and documentation needed to support the inspection will be identified during the inspection, including interviews with engineering managers, engineers, and probabilistic safety assessment staff. Our experience with these inspections has shown that they are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed for the inspection. The request has been divided into three groups. The first group lists information necessary for the information gathering visit, general preparation, and sample selection. This information should be available to the regional office no later than October 15, 2012. If possible, this information should be provided electronically to the lead inspector. Since the inspection will be concentrated on high risk/low margin components, calculations associated with your list of high risk components should be available to review during the information gathering visit to assist in our selection of components based on available design margin. The second group of documents requested is those items that the team will need access to the first day of onsite inspection to complete the required inspection samples. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. Additional requests by inspectors will be made throughout all three onsite weeks for specific documents needed to complete the review of that component/selection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests, questions, and concerns are addressed in a timely manner. During the onsite portion of our inspection, we request that you make available a conference room large enough to accommodate the inspection team. In that conference room, please make available a computer with access to a printer, your condition reporting database, and your documentation database. The lead inspector for this inspection is Matthew Young. We understand that our licensing engineer contact for this inspection is Del Elkinton. If there are any questions about the inspection or the requested materials, please contact the lead inspector at (817) 200-1545 or via e-mail at matt.young@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-
| | Sincerely,/RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74 Electronic Distribution to Palo Verde Nuclear Generating Station Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Tony.Brown@nrc.gov) Resident Inspector (Mica.Baquera@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Senior Project Engineer (Nick.Taylor@nrc.gov) Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Randy.Hall@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource |
| 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,/RA/
| | File located: R:\REACTORS\PV\PV 2012008 cancellation ltr ADAMS Accession No.: ML12237A148 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials MRY Publicly Avail Yes No Sensitive Yes No Sens. Type Initials R:IV/DRS EB2 C: M. Young T. Farnholtz /RA/ /RA/ 08/24/2012 08/24/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| Thomas Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 50-528; 50-529; 50-530 License: NPF-41; NPF-51; NPF-74
| |
| | |
| ===Enclosure:===
| |
| Component Design Basis Inspection Document Request cc w/enclosure:
| |
| Electronic Distribution for Palo Verde Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Tony.Brown@nrc.gov) Resident Inspector (Mica.Baquera@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) Senior Project Engineer (Nick.Taylor@nrc.gov) Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Balwant.Singal@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource Inspection Reports/MidCycle and EOC Letters to the following:
| |
| ROPreports Only inspection reports to the following: RIV/ETA: OEDO (Michael.McCoppin@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)
| |
| SUNSI Review Completed: _Yes_ ADAMS: Yes No Initials: MRY Publicly Available Non-Publicly Available Sensitive Non-Sensitive MLXXXXXXXXXX RIV:RI:DRS/EB1 RIV:BC/EB1 M. Young T. Farnholtz /RA/ /RA/ 05/21/2012 5/22/12 Enclosure INFORMATION REQUEST FOR PALO VERDE NUCLEAR GENERATING STATION COMPONENT DESIGN BASES (CDBI) INSPECTION
| |
| | |
| Inspection Report: 0500050528/2012008 0500050529/2012008 0500050530/2012008 Information Gathering Dates: October 30 - November 1, 2012 On-site Inspection Dates: November 13 - 16, 2012 November 26 - 30, 2012 December 10 - 14, 2012 Inspection Procedure: IP 71111.21, "Component Design Bases Inspection" Lead Inspector/Team Leader: Matthew Young 817-200-1545 matt.young@nrc.gov I. Information Requested Prior to the information Gathering Visit (October 15, 2012) The following information (Section I of this enclosure) should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com or compact disc, preferred), in care of Matthew Young, by October 15, 2012, to facilitate the reduction in the items to be selected for a final list during the preparation week November 5, 2012. The specific items selected from the lists shall be available and ready for review on the day indicated in this request. *Please provide requested documentation electronically in "pdf" files, Excel, or other searchable formats, if possible. The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of pressurized water reactor technology. If requested documents are large and only hard copy formats are available, please inform the inspectors, and provide subject documentation during the first day of the onsite inspection. 1. An excel spreadsheet of equipment basic events (with definitions) including importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your internal events probabilistic risk assessment (PRA). Include basic events with RAW value of 1.3 or greater. 2. Provide a list of the top 500 cut-sets from your PRA.
| |
| | |
| 3. Copies of PRA "system notebooks," and the latest PRA summary document. 4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV. Provide copies of your human reliability worksheets for these items. Enclosure 5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire. 6. Site top 10 issues list.
| |
| | |
| 7. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.). 8. List of motor operated valves (MOVs) in the valve program, with design margin and risk ranking. 9. List of air operated valves (AOVs) in the valve program, with design margin and risk ranking. 10. List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment. 11. Structure, system and components in the Maintenance Rule (a)(1) category. 12. A list of operating experience evaluations for the last 2 years.
| |
| | |
| 13. A list of all time-critical operator actions in procedures. 14. A list with description of permanent and temporary modifications sorted by the top 50 components identified in Item 1. 15. List of current "operator work arounds/burdens." 16 List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years. 17. Current management and engineering organizational charts. 18. Palo Verde Nuclear Generating Station IPE and IPEEE, if available electronically.
| |
| | |
| 19. Mechanical piping drawings for: Engineered safety features Emergency core cooling systems Emergency diesel generators Enclosure 20. Electrical one-line drawings for: Offsite power/switchyard supplies Normal AC power systems Emergency AC/DC power systems including 120VAC power, and 125VDC/24VDC safety class systems 21. List of any common-cause failures of components in the last 3 years.
| |
| | |
| 22. An electronic copy of the licensing basis documents (i.e., Updated Final Safety Analysis Report, Technical Specifications). 23. An electronic copy of the System Health notebooks. 24. System Description Manuals with simplified drawings of plant systems II. Information Requested to be Available on First Day of the Onsite Week (November 13, 2012) 1. List of condition reports (corrective action documents) associated with each of the selected components for the last 5 years. 2. The corrective maintenance history associated with each of the selected components for the last 2 years. 3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of reference material (such as drawings, engineering requests, and vendor letters). 4. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable. 5. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable. 6. Copies of any open temporary modifications associated with each of the selected components, if applicable. 7. Trend data on the selected electrical/mechanical components' performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable). 8. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection. 9. A copy of engineering/operations related audits completed in the last 2 years. Enclosure 10. Procedures used to accomplish selected operator actions. 11. List of licensee contacts for the inspection team with pager or phone numbers. III. Information Requested to be provided throughout the inspection. 1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). 3. Reference materials (available electronically and as needed during all onsite weeks): General set of plant drawings Procurement documents for components selected Plant procedures (normal, abnormal, emergency, surveillance, etc.) Vendor manuals Inspector Contact Information: Matthew Young Reactor Inspector (817) 200-1545 matt.young@nrc.gov Mailing Address:
| |
| US NRC, Region IV Attn: Matthew Young 1600 East Lamar Blvd Arlington, TX 76011-4511
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
August 24, 2012
Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NRC INSPECTION REPORT: 05000528/2012008, 05000529/2012008, AND 05000530/2012008
Dear Mr. Edington:
NRC Inspection Report 05000528/2012008, 05000529/2012008, and 05000530/2012008 has been cancelled; therefore, no inspection report will be issued.
Sincerely,/RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74 Electronic Distribution to Palo Verde Nuclear Generating Station Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Tony.Brown@nrc.gov) Resident Inspector (Mica.Baquera@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Senior Project Engineer (Nick.Taylor@nrc.gov) Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Randy.Hall@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource
File located: R:\REACTORS\PV\PV 2012008 cancellation ltr ADAMS Accession No.: ML12237A148 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials MRY Publicly Avail Yes No Sensitive Yes No Sens. Type Initials R:IV/DRS EB2 C: M. Young T. Farnholtz /RA/ /RA/ 08/24/2012 08/24/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax