ML040630407: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Page 1 of 3                                                                                      Oconee 03/03/2004    09:56:43                                                                Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit                                                                                                              No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                    Title                              on Site        Start      End              Type EB2 HEAD      - REACTOR HEAD REPLACEMENT                                                                        1 2            IP 71007              Reactor Vessel Head Replacement Inspection                                                03/15/2004  03/20/2004 Other Routine PS-RP          - RP-SGR-RX HEAD ASSESS CONTROLS-ISFIS                                                            1 2            IP 50001              Steam Generator Replacement Inspection                                                    03/22/2004  03/26/2004 Other Routine 2            IP 71007              Reactor Vessel Head Replacement Inspection                                                03/22/2004  03/26/2004 Other Routine 1, 2, 3          IP 7112101            Access Control to Radiologically Significant Areas                                        03/22/2004  03/26/2004 Baseline Inspections 2515/152      - U-2 2515/152:RPV LOWER HEAD PENETRATION                                                        1 2            IP 2515/152            Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)              03/29/2004  04/02/2004 Safety Issues EB2-ISI        - INSERVICE INSPECTION-U2                                                                        1 2            IP 7111108P            Inservice Inspection Activities - PWR                                                      03/29/2004  04/02/2004 Baseline Inspections EB2SGRP        - CONTAINMENT WELDING REPAIR                                                                      1 2            IP 50001              Steam Generator Replacement Inspection                                                    05/10/2004  05/15/2004 Other Routine EB2SGRP        - STEAM GENERATOR REPLACEMENT                                                                    1 2            IP 50001              Steam Generator Replacement Inspection                                                    05/10/2004  05/15/2004 Other Routine 2            IP 50001              Steam Generator Replacement Inspection                                                    05/24/2004  05/29/2004 Other Routine 2515/153      - TI2515/153 RX CONTAINMENT SUMP BLOCKAGE                                                        1 2, 3          IP 2515/153            Reactor Containment Sump Blockage (NRC Bulletin 2003-01)                                  05/24/2004  05/28/2004 Safety Issues EB2SGRP        - CONTAINMENT REPAIR                                                                              1 2            IP 50001              Steam Generator Replacement Inspection                                                    05/24/2004  05/28/2004 Other Routine OL PREP        - INITIAL EXAM PREP                                                                              2 1                  V23216              OCONEE/EXAMS AT POWER FACILITIES                                                          05/24/2004  05/28/2004 Not Applicable 2515/154      - TI 2515/154 - SPENT FUEL MC&A                                                                  1 1, 2, 3          IP 2515/154            Spent Fuel Material Control and Accounting at Nuclear Power Plants                        06/14/2004  06/18/2004 Safety Issues OL EXAM        - INITIAL EXAM                                                                                    4 1                  V23216              OCONEE/EXAMS AT POWER FACILITIES                                                          06/14/2004  06/25/2004 Not Applicable EB2-HS        - HEAT SINK                                                                                      1 1, 2, 3          IP 7111107B            Heat Sink Performance                                                                      06/28/2004  07/02/2004 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT                                                                            2 1, 2, 3          IP 7111121            Safety System Design and Performance Capability                                            07/26/2004  07/30/2004 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERF CAPABILITY                                                                  4 1, 2, 3          IP 7111121            Safety System Design and Performance Capability                                            08/16/2004  08/20/2004 Baseline Inspections 1, 2, 3          IP 7111121            Safety System Design and Performance Capability                                            08/30/2004  09/03/2004 Baseline Inspections PS-RP          - RP PUBLIC BASELINE                                                                              3 1, 2, 3          IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                              09/20/2004  09/24/2004 Baseline Inspections 1, 2, 3          IP 7112201            Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                  09/20/2004  09/24/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
 
Page 2 of 3                                                                                  Oconee 03/03/2004    09:56:43                                                              Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit                                                                                                              No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                  Title                                on Site        Start      End              Type PS-RP          - RP PUBLIC BASELINE                                                                              3 1, 2, 3          IP 7112203            Radiological Environmental Monitoring Program                                              09/20/2004  09/24/2004 Baseline Inspections 1, 2, 3          IP 71151              Performance Indicator Verification                                                        09/20/2004  09/24/2004 Baseline Inspections PS-SEC        - SECURITY                                                                                        2 1, 2, 3          IP 7113001            Access Authorization                                                                      09/27/2004  10/01/2004 Baseline Inspections 1, 2, 3          IP 7113002            Access Control                                                                            09/27/2004  10/01/2004 Baseline Inspections 1, 2, 3          IP 71151              Performance Indicator Verification                                                        09/27/2004  10/01/2004 Baseline Inspections EB2-ISI        - INSERVICE INSPECTION-U3                                                                        1 3          IP 7111108P            Inservice Inspection Activities - PWR                                                      10/18/2004  10/22/2004 Baseline Inspections EB2-SGRP - STEAM GENERATOR REPLACEMENT                                                                          1 3          IP 50001              Steam Generator Replacement Inspection                                                    11/15/2004  11/19/2004 Other Routine 3          IP 50001              Steam Generator Replacement Inspection                                                    12/06/2004  12/10/2004 Other Routine 3          IP 50001              Steam Generator Replacement Inspection                                                    12/13/2004  12/17/2004 Other Routine EB2-SGRP - CONTAINMENT WELDING REPAIR                                                                            1 3          IP 50001              Steam Generator Replacement Inspection                                                    12/06/2004  12/10/2004 Other Routine PS-RP          - RADIATION PROTECTION - SGR                                                                      1 3          IP 50001              Steam Generator Replacement Inspection                                                    12/06/2004  12/10/2004 Other Routine EB2SGRP        - CONTAINMENT REPAIR                                                                              1 3          IP 50001              Steam Generator Replacement Inspection                                                    12/13/2004  12/17/2004 Other Routine 2515/152      - U-3 2515/152: RPV LOWER HEAD PENETRATION                                                        1 3          IP 2515/152            Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)              12/15/2004  12/22/2004 Safety Issues EB2-MR        - MAINTENANCE RULE                                                                                1 1, 2, 3          IP 7111112B            Maintenance Effectiveness                                                                  01/10/2005  01/14/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59                                                                              3 1, 2, 3          IP 7111102            Evaluation of Changes, Tests, or Experiments                                              02/14/2005  02/18/2005 Baseline Inspections 1, 2, 3          IP 7111117B            Permanent Plant Modifications                                                              02/14/2005  02/18/2005 Baseline Inspections OL RQ          - REQUAL INSPECTION                                                                              2 1, 2, 3          IP 7111111B            Licensed Operator Requalification Program                                                  03/21/2005  03/25/2005 Baseline Inspections EB2-ISI        - INSERVICE INSPECTION-U1                                                                        1 1                IP 7111108P            Inservice Inspection Activities - PWR                                                      04/04/2005  04/08/2005 Baseline Inspections 71152B        - PI&R INSPECTION                                                                                4 1, 2, 3          IP 71152B              Identification and Resolution of Problems                                                  05/09/2005  05/13/2005 Baseline Inspections 1, 2, 3          IP 71152B              Identification and Resolution of Problems                                                  05/23/2005  05/27/2005 Baseline Inspections EB1-TFP        - TFP PRE-INSPECTION VISIT                                                                        4 1, 2, 3          IP 7111105T            Fire Protection                                                                            05/16/2005  05/20/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
 
Page 3 of 3                                                                              Oconee 03/03/2004    09:56:43                                                          Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit                                                                                                    No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                              Title                        on Site        Start      End            Type OL PREP        - INITIAL EXAM PREP                                                                    3 1                  V23216              OCONEE/EXAMS AT POWER FACILITIES                                                05/30/2005  06/03/2005 Not Applicable EB1-TFP        - TRIENNIAL FIRE PROTECTION INSPECTION                                                4 1, 2, 3          IP 7111105T            Fire Protection                                                                06/06/2005  06/10/2005 Baseline Inspections 1, 2, 3          IP 7111105T            Fire Protection                                                                06/20/2005  06/24/2005 Baseline Inspections OL EXAM        - INITIAL EXAM                                                                        3 1                  V23216              OCONEE/EXAMS AT POWER FACILITIES                                                06/20/2005  07/01/2005 Not Applicable This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 01:25, 25 March 2020

Inspection/Activity Plan - Oconee, for 03/01/2004 - 09/30/2005
ML040630407
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/03/2004
From:
NRC/RGN-II
To:
Shared Package
ML040630387 List:
References
IR-04-001
Download: ML040630407 (3)


Text

Page 1 of 3 Oconee 03/03/2004 09:56:43 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2 HEAD - REACTOR HEAD REPLACEMENT 1 2 IP 71007 Reactor Vessel Head Replacement Inspection 03/15/2004 03/20/2004 Other Routine PS-RP - RP-SGR-RX HEAD ASSESS CONTROLS-ISFIS 1 2 IP 50001 Steam Generator Replacement Inspection 03/22/2004 03/26/2004 Other Routine 2 IP 71007 Reactor Vessel Head Replacement Inspection 03/22/2004 03/26/2004 Other Routine 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/22/2004 03/26/2004 Baseline Inspections 2515/152 - U-2 2515/152:RPV LOWER HEAD PENETRATION 1 2 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 03/29/2004 04/02/2004 Safety Issues EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/29/2004 04/02/2004 Baseline Inspections EB2SGRP - CONTAINMENT WELDING REPAIR 1 2 IP 50001 Steam Generator Replacement Inspection 05/10/2004 05/15/2004 Other Routine EB2SGRP - STEAM GENERATOR REPLACEMENT 1 2 IP 50001 Steam Generator Replacement Inspection 05/10/2004 05/15/2004 Other Routine 2 IP 50001 Steam Generator Replacement Inspection 05/24/2004 05/29/2004 Other Routine 2515/153 - TI2515/153 RX CONTAINMENT SUMP BLOCKAGE 1 2, 3 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 05/24/2004 05/28/2004 Safety Issues EB2SGRP - CONTAINMENT REPAIR 1 2 IP 50001 Steam Generator Replacement Inspection 05/24/2004 05/28/2004 Other Routine OL PREP - INITIAL EXAM PREP 2 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 05/24/2004 05/28/2004 Not Applicable 2515/154 - TI 2515/154 - SPENT FUEL MC&A 1 1, 2, 3 IP 2515/154 Spent Fuel Material Control and Accounting at Nuclear Power Plants 06/14/2004 06/18/2004 Safety Issues OL EXAM - INITIAL EXAM 4 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/14/2004 06/25/2004 Not Applicable EB2-HS - HEAT SINK 1 1, 2, 3 IP 7111107B Heat Sink Performance 06/28/2004 07/02/2004 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 07/26/2004 07/30/2004 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERF CAPABILITY 4 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 08/16/2004 08/20/2004 Baseline Inspections 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 08/30/2004 09/03/2004 Baseline Inspections PS-RP - RP PUBLIC BASELINE 3 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/20/2004 09/24/2004 Baseline Inspections 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/20/2004 09/24/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Oconee 03/03/2004 09:56:43 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RP PUBLIC BASELINE 3 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program 09/20/2004 09/24/2004 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 09/20/2004 09/24/2004 Baseline Inspections PS-SEC - SECURITY 2 1, 2, 3 IP 7113001 Access Authorization 09/27/2004 10/01/2004 Baseline Inspections 1, 2, 3 IP 7113002 Access Control 09/27/2004 10/01/2004 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 09/27/2004 10/01/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/18/2004 10/22/2004 Baseline Inspections EB2-SGRP - STEAM GENERATOR REPLACEMENT 1 3 IP 50001 Steam Generator Replacement Inspection 11/15/2004 11/19/2004 Other Routine 3 IP 50001 Steam Generator Replacement Inspection 12/06/2004 12/10/2004 Other Routine 3 IP 50001 Steam Generator Replacement Inspection 12/13/2004 12/17/2004 Other Routine EB2-SGRP - CONTAINMENT WELDING REPAIR 1 3 IP 50001 Steam Generator Replacement Inspection 12/06/2004 12/10/2004 Other Routine PS-RP - RADIATION PROTECTION - SGR 1 3 IP 50001 Steam Generator Replacement Inspection 12/06/2004 12/10/2004 Other Routine EB2SGRP - CONTAINMENT REPAIR 1 3 IP 50001 Steam Generator Replacement Inspection 12/13/2004 12/17/2004 Other Routine 2515/152 - U-3 2515/152: RPV LOWER HEAD PENETRATION 1 3 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 12/15/2004 12/22/2004 Safety Issues EB2-MR - MAINTENANCE RULE 1 1, 2, 3 IP 7111112B Maintenance Effectiveness 01/10/2005 01/14/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59 3 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/14/2005 02/18/2005 Baseline Inspections 1, 2, 3 IP 7111117B Permanent Plant Modifications 02/14/2005 02/18/2005 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/21/2005 03/25/2005 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U1 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/04/2005 04/08/2005 Baseline Inspections 71152B - PI&R INSPECTION 4 1, 2, 3 IP 71152B Identification and Resolution of Problems 05/09/2005 05/13/2005 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 05/23/2005 05/27/2005 Baseline Inspections EB1-TFP - TFP PRE-INSPECTION VISIT 4 1, 2, 3 IP 7111105T Fire Protection 05/16/2005 05/20/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Oconee 03/03/2004 09:56:43 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PREP 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 05/30/2005 06/03/2005 Not Applicable EB1-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2, 3 IP 7111105T Fire Protection 06/06/2005 06/10/2005 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection 06/20/2005 06/24/2005 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/20/2005 07/01/2005 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.