Inspection/Activity Plan - Oconee, for 03/01/2004 - 09/30/2005
ML040630407
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/03/2004
From:
NRC/RGN-II
To:
Shared Package
ML040630387 List:
References
IR-04-001
Download: ML040630407 (3)


Text

Page 1 of 3 Oconee 03/03/2004 09:56:43 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2 HEAD - REACTOR HEAD REPLACEMENT 1 2 IP 71007 Reactor Vessel Head Replacement Inspection 03/15/2004 03/20/2004 Other Routine PS-RP - RP-SGR-RX HEAD ASSESS CONTROLS-ISFIS 1 2 IP 50001 Steam Generator Replacement Inspection 03/22/2004 03/26/2004 Other Routine 2 IP 71007 Reactor Vessel Head Replacement Inspection 03/22/2004 03/26/2004 Other Routine 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/22/2004 03/26/2004 Baseline Inspections 2515/152 - U-2 2515/152:RPV LOWER HEAD PENETRATION 1 2 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 03/29/2004 04/02/2004 Safety Issues EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/29/2004 04/02/2004 Baseline Inspections EB2SGRP - CONTAINMENT WELDING REPAIR 1 2 IP 50001 Steam Generator Replacement Inspection 05/10/2004 05/15/2004 Other Routine EB2SGRP - STEAM GENERATOR REPLACEMENT 1 2 IP 50001 Steam Generator Replacement Inspection 05/10/2004 05/15/2004 Other Routine 2 IP 50001 Steam Generator Replacement Inspection 05/24/2004 05/29/2004 Other Routine 2515/153 - TI2515/153 RX CONTAINMENT SUMP BLOCKAGE 1 2, 3 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 05/24/2004 05/28/2004 Safety Issues EB2SGRP - CONTAINMENT REPAIR 1 2 IP 50001 Steam Generator Replacement Inspection 05/24/2004 05/28/2004 Other Routine OL PREP - INITIAL EXAM PREP 2 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 05/24/2004 05/28/2004 Not Applicable 2515/154 - TI 2515/154 - SPENT FUEL MC&A 1 1, 2, 3 IP 2515/154 Spent Fuel Material Control and Accounting at Nuclear Power Plants 06/14/2004 06/18/2004 Safety Issues OL EXAM - INITIAL EXAM 4 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/14/2004 06/25/2004 Not Applicable EB2-HS - HEAT SINK 1 1, 2, 3 IP 7111107B Heat Sink Performance 06/28/2004 07/02/2004 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 07/26/2004 07/30/2004 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERF CAPABILITY 4 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 08/16/2004 08/20/2004 Baseline Inspections 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 08/30/2004 09/03/2004 Baseline Inspections PS-RP - RP PUBLIC BASELINE 3 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/20/2004 09/24/2004 Baseline Inspections 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/20/2004 09/24/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Oconee 03/03/2004 09:56:43 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RP PUBLIC BASELINE 3 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program 09/20/2004 09/24/2004 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 09/20/2004 09/24/2004 Baseline Inspections PS-SEC - SECURITY 2 1, 2, 3 IP 7113001 Access Authorization 09/27/2004 10/01/2004 Baseline Inspections 1, 2, 3 IP 7113002 Access Control 09/27/2004 10/01/2004 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 09/27/2004 10/01/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/18/2004 10/22/2004 Baseline Inspections EB2-SGRP - STEAM GENERATOR REPLACEMENT 1 3 IP 50001 Steam Generator Replacement Inspection 11/15/2004 11/19/2004 Other Routine 3 IP 50001 Steam Generator Replacement Inspection 12/06/2004 12/10/2004 Other Routine 3 IP 50001 Steam Generator Replacement Inspection 12/13/2004 12/17/2004 Other Routine EB2-SGRP - CONTAINMENT WELDING REPAIR 1 3 IP 50001 Steam Generator Replacement Inspection 12/06/2004 12/10/2004 Other Routine PS-RP - RADIATION PROTECTION - SGR 1 3 IP 50001 Steam Generator Replacement Inspection 12/06/2004 12/10/2004 Other Routine EB2SGRP - CONTAINMENT REPAIR 1 3 IP 50001 Steam Generator Replacement Inspection 12/13/2004 12/17/2004 Other Routine 2515/152 - U-3 2515/152: RPV LOWER HEAD PENETRATION 1 3 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 12/15/2004 12/22/2004 Safety Issues EB2-MR - MAINTENANCE RULE 1 1, 2, 3 IP 7111112B Maintenance Effectiveness 01/10/2005 01/14/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59 3 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/14/2005 02/18/2005 Baseline Inspections 1, 2, 3 IP 7111117B Permanent Plant Modifications 02/14/2005 02/18/2005 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/21/2005 03/25/2005 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U1 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/04/2005 04/08/2005 Baseline Inspections 71152B - PI&R INSPECTION 4 1, 2, 3 IP 71152B Identification and Resolution of Problems 05/09/2005 05/13/2005 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 05/23/2005 05/27/2005 Baseline Inspections EB1-TFP - TFP PRE-INSPECTION VISIT 4 1, 2, 3 IP 7111105T Fire Protection 05/16/2005 05/20/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Oconee 03/03/2004 09:56:43 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PREP 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 05/30/2005 06/03/2005 Not Applicable EB1-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2, 3 IP 7111105T Fire Protection 06/06/2005 06/10/2005 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection 06/20/2005 06/24/2005 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/20/2005 07/01/2005 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.