Preliminary Issue List Palo Verde Nuclear Generating Station Augmented Inspection Team NOTE: This is NOT an all-inclusive list.
Preliminary Issue List Palo Verde Nuclear Generating Station Augmented Inspection Team NOTE: This is NOT an all-inclusive list.
Line 42: Line 40:
I
I


                                                                                                      --------- -.-
I.
I.
ovi {f E1                        -
ovi {f E1                        -

Latest revision as of 10:57, 23 March 2020

Preliminary Issue List, with Handwritten Notes
ML053250417
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/15/2005
From:
NRC Region 4
To:
References
FOIA/PA-2004-0307
Download: ML053250417 (2)


Text

__-

_~

Preliminary Issue List Palo Verde Nuclear Generating Station Augmented Inspection Team NOTE: This is NOT an all-inclusive list.

230 kV Liberty Transmission Line, Tower#73, Phase "C"Insulator Failure C - single phase to ground fault resulted in loss of offsite power and three unit trip E Auxiliary Relay, Liberty Transmission Line Fault Detection/Protection System Failure q , A inadequate design resulted in single failure vulnerability d>

  • additional single failure design issues identified and corrected to extent practical
  • licensee also did not appear to make resolution of this issue a startup issue until the concern was raised by the AIT
  • 4Jnit I Atmospheric Dump Valve 185 Fail e n:rooe ristra ction with minimal impact on event response
  • apparent cause being determined
  • Unit 1 Letdown Heat Exchanger Isolation Failure
  • licensee performance deficiency associated with understanding implications of temporary modification installed in plant
  • little impact on control room response to event
  • some potential impact on fire response being reviewed by AIT
  • UiUtlancdL3General-Electric-Magne Blast Circuit Breaker Failures (J complicated event recovery efforts taii t ereturn of offsite power to ESF

{ZieQ determined apparent cause as "breaker not cycled frequently enoug!P VA AlThl lctse een-apparent caseara ncern regaaigttrret

5gtrj %functionality of breakers resident staff following as potential operability issue

'e .fapparent cause wa ode ure n e er circuit -7 ,-,xA _

  • Unit 2, Train "E" Positive Displacement Charging Pump Trip a
  • operator error resulted in suction line isolation and protective trip of pump
  • AIT identified that auxiliary operator was delayed approximately 10 minutes at the RCA access point even after the operator explained he was on a time critical mission
  • *when RCA access delay was discussed with licensee, AIT determined that the licensee was unaware of delay information in this record was deleted in accordance with the reedOM1 of InfoFMation

.FOIA.. . .mptlom ..

I

I.

ovi {f E1 -

  • Unit 3 Bypass Valve/Control Cabinet Malfunctions

-S good operator actions minimized impact on plant, was operator distraction O-C potential design modification issue being reviewed by AIT as apparent cause

  • no impact on trip but some minor impacts on recovery
  • potential design issue associated with set point of thermal overloads
  • Unit 3 Low Pressure Safety Injection System In-leakage (Check Valve V217)
  • little impact on event, operator distraction to take manual actions to prevent over

_pressurization

  • apparent cause was Borg-Warner check valve leakage, potential maintenance issue a* -nit 3Variable Over PowerTrD-ReactorCoolant Pump Speed Increase to 67 Hz license- in stigating potential impacts o I A; . AIT-raisudiqest-ios aboutydrrauic affects, if any

'-:> Technical Support Center Emergency Diesel Generator Failure

  • apparent cause was test switch out of position
  • maintenance personnel failed to use restoration procedure six days prior to event following testing
  • some Impact on emergency response organization which needed to use alternate TSC
  • complicated recovery efforts by delaying RCP restoration
  • appears minimum amperage basis'involved NPSH limits
  • high voltage in switchyard resulted in low amperage J1X i~ Emergency Response Organization Notification Issues
  • some delay in notification occurred but little impact
  • apparent cause associated with procedure adequacy and communication failures
  • Initial Notification of State and Local Official Issues
  • Unit I and Unit 3 did meet their guidelines on timeliness of initial notification
  • little overall impact because Unit 2 Alert Notification was timely
  • apparent cause being reviewed