| Preliminary Issue List Palo Verde Nuclear Generating Station Augmented Inspection Team NOTE: This is NOT an all-inclusive list. | | Preliminary Issue List Palo Verde Nuclear Generating Station Augmented Inspection Team NOTE: This is NOT an all-inclusive list. |
Line 42: |
Line 40: |
| I | | I |
|
| |
|
| --------- -.-
| |
| I. | | I. |
| ovi {f E1 - | | ovi {f E1 - |
Latest revision as of 10:57, 23 March 2020
|
---|
Category:- No Document Type Applies
MONTHYEARML20253A0092020-09-0202 September 2020 NRC-2020-000291/000292 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed ML20162A0472020-06-0303 June 2020 NRC-2020-000181 - Resp 1 - Final. Agency Records Subject to the Request Are Enclosed ML19261A0962019-09-12012 September 2019 NRC-2019-000288 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed (Decommissioning Funding Status Reports & Related Information) ML19261A1172019-09-12012 September 2019 NRC-2019-000288 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed (Spot Check SONGS 2 and 3 - 2008) ML18192A3912018-07-11011 July 2018 Restated Articles of Incorporation Are Executed Pursuant to the Provisions of Section 32 of Chapter 64, Laws 1975, Being Section 51-26-7 N,M.S.A. 1953, as Amended ML18192A4032018-07-11011 July 2018 Study Case 1986 MX-S3 ML18192B8112018-07-11011 July 2018 Prospectus, Employee Stock Purchase Plan of Southern California Edison Company ML17207A1002017-07-26026 July 2017 FAQ 17-02: Palo Verde Unit 3 Scram (Final NRC Response) ML17030A3232017-01-30030 January 2017 LTR-17-0038-1-Ticket - Roy Mathew, E-mail 2.206 Petition on Palo Verde Nuclear Generating Station, Unit 3 - Issuance of Amendment Nos. 199 and 200 Revision to Technical Specification 3.8.1, AC Alternating Current Source-Operating ML17026A3122017-01-23023 January 2017 LTR-17-0038-Ticket Roy Mathew, E-mail 2.206 Petition on Palo Verde Nuclear Generating Station, Unit 3 - Issuance of Amendment Nos. 199 and 200 Revision to Technical Specification 3.8.1, AC Alternating Current Source-Operating ML16054A0072016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Final Response #2, Records Already Publicly Available ML16054A0132016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 5 of 8 ML16054A0122016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 4 of 8 ML16054A0102016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 2 of 8 ML16054A0092016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 8 of 8 ML16054A0152016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 7 of 8 ML16054A0082016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 8 ML16054A0142016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 6 of 8 ML16054A0112016-02-12012 February 2016 FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 3 of 8 ML15252A1112015-09-11011 September 2015 Newspaper Notice, Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15027A1232014-12-19019 December 2014 Technical Specification (TS) Bases Revision 61, Replacement Pages and Insertion Instructions ML13273A2282013-09-27027 September 2013 FOIA/PA-2013-0329 - Resp - 1 - Final. Group a, Records Already Publicly Available. ML13015A2562012-12-17017 December 2012 Draft Submittal February 2013 FLEX Integrated Plan - Palo Verde ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1127100332011-09-28028 September 2011 ROP Tabletop Examples and Results ML1027102822010-09-27027 September 2010 Draft Supplemental Information Required ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0814805442008-05-23023 May 2008 Comments on Draft IP95003, IMC0305 and Lesson Learned Recommendations ML0808000362008-03-13013 March 2008 List of Attendees, 03/13/2008 Summary of Meeting with Eight Operating Nuclear Power Plant Licensees to Discuss Emerging Metallurgical Issues Certain Welds in Reactor Coolant System for Pressurized-Water Reactors ML0811305312008-02-15015 February 2008 Post Reg. Conference Reference Material - Simulator Review of JPM EP009-CR-001. ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0729205572007-10-17017 October 2007 EA-07-162, Arizona Public Service Company, Confirmatory Order Modifying License (Effective Immediately) Office of Investigations Report No. 4-2007-009, Consent and Hearing Waiver Form ML0729205382007-10-16016 October 2007 IA-07-039, Mr. Mark Sharp, Confirmatory Order, NRC Office of Investigation Report No. 4-2007-009, Consent and Hearing Waiver Form ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0634705992006-12-14014 December 2006 Plant Service List ML0627201202006-09-29029 September 2006 Management Directive 8.3 Evaluation for Palo Verde Nuclear Generating Station (PV 06-19) ML0626503122006-09-0101 September 2006 Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) ML0532204562005-11-15015 November 2005 Table Titled Palo Verde Unit 2 - June 14, 2004 Loss of Offsite Power Event - June 24, 2004 (8:04am) ML0532504172005-11-15015 November 2005 Preliminary Issue List, with Handwritten Notes ML0532504152005-11-15015 November 2005 Preliminary Issue List ML0532501252005-11-15015 November 2005 AIT Status ML0532204572005-11-15015 November 2005 Table Titled Palo Verde Unit 2 - June 14, 2004 Loss of Offsite Power Event - June 25, 2004 (9:49) ML0531300702005-11-0202 November 2005 Fault Description Document ML0531300792005-11-0202 November 2005 Loop Risk Assessment ML0613105192005-08-0101 August 2005 PV-08-2005-Outline Comments ML1015400272005-04-27027 April 2005 APS 2005a Palo Verde Nuclear Generating Station 2004 Air Emissions Inventory. PVNGS (1-1-PV-241) 2020-09-02
[Table view] |
Text
__-
_~
Preliminary Issue List Palo Verde Nuclear Generating Station Augmented Inspection Team NOTE: This is NOT an all-inclusive list.
230 kV Liberty Transmission Line, Tower#73, Phase "C"Insulator Failure C - single phase to ground fault resulted in loss of offsite power and three unit trip E Auxiliary Relay, Liberty Transmission Line Fault Detection/Protection System Failure q , A inadequate design resulted in single failure vulnerability d>
- additional single failure design issues identified and corrected to extent practical
- licensee also did not appear to make resolution of this issue a startup issue until the concern was raised by the AIT
- 4Jnit I Atmospheric Dump Valve 185 Fail e n:rooe ristra ction with minimal impact on event response
- apparent cause being determined
- Unit 1 Letdown Heat Exchanger Isolation Failure
- licensee performance deficiency associated with understanding implications of temporary modification installed in plant
- little impact on control room response to event
- some potential impact on fire response being reviewed by AIT
- UiUtlancdL3General-Electric-Magne Blast Circuit Breaker Failures (J complicated event recovery efforts taii t ereturn of offsite power to ESF
{ZieQ determined apparent cause as "breaker not cycled frequently enoug!P VA AlThl lctse een-apparent caseara ncern regaaigttrret
- 5gtrj %functionality of breakers resident staff following as potential operability issue
'e .fapparent cause wa ode ure n e er circuit -7 ,-,xA _
- Unit 2, Train "E" Positive Displacement Charging Pump Trip a
- operator error resulted in suction line isolation and protective trip of pump
- AIT identified that auxiliary operator was delayed approximately 10 minutes at the RCA access point even after the operator explained he was on a time critical mission
- *when RCA access delay was discussed with licensee, AIT determined that the licensee was unaware of delay information in this record was deleted in accordance with the reedOM1 of InfoFMation
.FOIA.. . .mptlom ..
I
I.
ovi {f E1 -
- Unit 3 Bypass Valve/Control Cabinet Malfunctions
-S good operator actions minimized impact on plant, was operator distraction O-C potential design modification issue being reviewed by AIT as apparent cause
- no impact on trip but some minor impacts on recovery
- potential design issue associated with set point of thermal overloads
- Unit 3 Low Pressure Safety Injection System In-leakage (Check Valve V217)
- little impact on event, operator distraction to take manual actions to prevent over
_pressurization
- apparent cause was Borg-Warner check valve leakage, potential maintenance issue a* -nit 3Variable Over PowerTrD-ReactorCoolant Pump Speed Increase to 67 Hz license- in stigating potential impacts o I A; . AIT-raisudiqest-ios aboutydrrauic affects, if any
'-:> Technical Support Center Emergency Diesel Generator Failure
- apparent cause was test switch out of position
- maintenance personnel failed to use restoration procedure six days prior to event following testing
- some Impact on emergency response organization which needed to use alternate TSC
- complicated recovery efforts by delaying RCP restoration
- appears minimum amperage basis'involved NPSH limits
- high voltage in switchyard resulted in low amperage J1X i~ Emergency Response Organization Notification Issues
- some delay in notification occurred but little impact
- apparent cause associated with procedure adequacy and communication failures
- Initial Notification of State and Local Official Issues
- Unit I and Unit 3 did meet their guidelines on timeliness of initial notification
- little overall impact because Unit 2 Alert Notification was timely
- apparent cause being reviewed