Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20253A009 | 2 September 2020 | NRC-2020-000291/000292 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | Cyber Security |
ML20162A047 | 3 June 2020 | NRC-2020-000181 - Resp 1 - Final. Agency Records Subject to the Request Are Enclosed | Fitness for Duty FLEX Power change |
ML19261A096 | 12 September 2019 | NRC-2019-000288 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed (Decommissioning Funding Status Reports & Related Information) | |
ML19261A117 | 12 September 2019 | NRC-2019-000288 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed (Spot Check SONGS 2 and 3 - 2008) | |
ML18192A391 | 11 July 2018 | Restated Articles of Incorporation Are Executed Pursuant to the Provisions of Section 32 of Chapter 64, Laws 1975, Being Section 51-26-7 N,M.S.A. 1953, as Amended | |
ML18192A403 | 11 July 2018 | Study Case 1986 MX-S3 | |
ML18192B811 | 11 July 2018 | Prospectus, Employee Stock Purchase Plan of Southern California Edison Company | |
ML17207A100 | 26 July 2017 | FAQ 17-02: Palo Verde Unit 3 Scram (Final NRC Response) | |
ML17030A323 | 30 January 2017 | LTR-17-0038-1-Ticket - Roy Mathew, E-mail 2.206 Petition on Palo Verde Nuclear Generating Station, Unit 3 - Issuance of Amendment Nos. 199 and 200 Revision to Technical Specification 3.8.1, AC Alternating Current Source-Operating | |
ML17026A312 | 23 January 2017 | LTR-17-0038-Ticket Roy Mathew, E-mail 2.206 Petition on Palo Verde Nuclear Generating Station, Unit 3 - Issuance of Amendment Nos. 199 and 200 Revision to Technical Specification 3.8.1, AC Alternating Current Source-Operating | |
ML16054A007 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Final Response #2, Records Already Publicly Available | Fukushima Dai-Ichi Non-Concurrence Process |
ML16054A013 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 5 of 8 | |
ML16054A012 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 4 of 8 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Design basis earthquake Earthquake Backfit |
ML16054A010 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 2 of 8 | Earthquake Backfit |
ML16054A009 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 8 of 8 | Probabilistic Risk Assessment FLEX Earthquake |
ML16054A015 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 7 of 8 | Earthquake |
ML16054A008 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 8 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Design basis earthquake Open House Earthquake Backfit |
ML16054A014 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 6 of 8 | Safe Shutdown Unanalyzed Condition Boric Acid Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Design basis earthquake Open House Earthquake Backfit Weak link |
ML16054A011 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 3 of 8 | Earthquake |
ML15252A111 | 11 September 2015 | Newspaper Notice, Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 | Shutdown Margin |
ML15014A160 | 14 January 2015 | Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML15014A153 | 14 January 2015 | Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML15027A123 | 19 December 2014 | Technical Specification (TS) Bases Revision 61, Replacement Pages and Insertion Instructions | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Battery sizing |
ML13273A228 | 27 September 2013 | FOIA/PA-2013-0329 - Resp - 1 - Final. Group a, Records Already Publicly Available. | |
ML13015A256 | 17 December 2012 | Draft Submittal February 2013 FLEX Integrated Plan - Palo Verde | High winds Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake FLEX Design basis earthquake |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results | Time of Discovery Mission time Significance Determination Process |
ML102710282 | 27 September 2010 | Draft Supplemental Information Required | |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
ML090650023 | 6 March 2009 | Safety Culture Policy Statement (Safety & Security) Comments | Tritium Exit Sign |
ML081480544 | 23 May 2008 | Comments on Draft IP95003, IMC0305 and Lesson Learned Recommendations | Significance Determination Process |
ML080800036 | 13 March 2008 | List of Attendees, 03/13/2008 Summary of Meeting with Eight Operating Nuclear Power Plant Licensees to Discuss Emerging Metallurgical Issues Certain Welds in Reactor Coolant System for Pressurized-Water Reactors | |
ML081130531 | 15 February 2008 | Post Reg. Conference Reference Material - Simulator Review of JPM EP009-CR-001. | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072920557 | 17 October 2007 | EA-07-162, Arizona Public Service Company, Confirmatory Order Modifying License (Effective Immediately) Office of Investigations Report No. 4-2007-009, Consent and Hearing Waiver Form | |
ML072920538 | 16 October 2007 | IA-07-039, Mr. Mark Sharp, Confirmatory Order, NRC Office of Investigation Report No. 4-2007-009, Consent and Hearing Waiver Form | |
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
ML063470599 | 14 December 2006 | Plant Service List | |
ML062720120 | 29 September 2006 | Management Directive 8.3 Evaluation for Palo Verde Nuclear Generating Station (PV 06-19) | |
ML062650312 | 1 September 2006 | Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) | Boric Acid Offsite Dose Calculation Manual Coatings Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Accidental discharge |
ML053220456 | 15 November 2005 | Table Titled Palo Verde Unit 2 - June 14, 2004 Loss of Offsite Power Event - June 24, 2004 (8:04am) | Mission time |
ML053250417 | 15 November 2005 | Preliminary Issue List, with Handwritten Notes | Temporary Modification |
ML053250415 | 15 November 2005 | Preliminary Issue List | Temporary Modification |
ML053250125 | 15 November 2005 | AIT Status | |
ML053220457 | 15 November 2005 | Table Titled Palo Verde Unit 2 - June 14, 2004 Loss of Offsite Power Event - June 25, 2004 (9:49) | |
ML053130070 | 2 November 2005 | Fault Description Document | |
ML053130079 | 2 November 2005 | Loop Risk Assessment | Significance Determination Process |
ML061310519 | 1 August 2005 | PV-08-2005-Outline Comments | |
ML101540027 | 27 April 2005 | APS 2005a Palo Verde Nuclear Generating Station 2004 Air Emissions Inventory. PVNGS (1-1-PV-241) |