0 or Palo Verde LOOP Risk Assessment II Preliminary Assessment:
0 a
a 0
S F163 Final Assessment:
Should not be confused with significance determination process. This evaluation does not impact action matrix The risk associated with the event will increase based on the following items:
Actual offsite power availability and recovery will be assessed. This will rule out early offsite power recovery.
A site-wide CCDP will be assessed, so Units 1 and 3 risk will be additive.
information in this record was deteted In accordance wi the Freedom of Infounafot A Li,.
re fion i
Common equipment reductions will be made. Example, the Gas Turbine Generators can not provide all three units.
Other issues that may increase final risk:
Two 13.8 kV Magna-Blast Breakers failed
- b.
TDAFW drains were not opened