Line 27: Line 27:
: b.          There is no day-to-day repetition between this and other operating tests to be administered during this examination.
: b.          There is no day-to-day repetition between this and other operating tests to be administered during this examination.
a      (f
a      (f
                                                                                                                        ''
: c.          The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a).
: c.          The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a).
: d.          Overlap with the written examination and between different parts of the operating test is within acceptable limits.                                                                                              t      ~
: d.          Overlap with the written examination and between different parts of the operating test is within acceptable limits.                                                                                              t      ~
Line 33: Line 32:
                                                                                                                         "              sz...
                                                                                                                         "              sz...
: e.          It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
: e.          It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
                                                                                                                        ,
: 2. WALK-THROUGH CRITERIA                                                  --      --    --
: 2. WALK-THROUGH CRITERIA                                                  --      --    --
: a.          Each JPM includes the following, as applicable:
: a.          Each JPM includes the following, as applicable:
Line 42: Line 40:
* operationally important specific performance criteria that include:
* operationally important specific performance criteria that include:
                       -      detailed expected actions with exact criteria and nomenclature
                       -      detailed expected actions with exact criteria and nomenclature
                       --      system response and other examiner cues
                       --      system response and other examiner cues statements describing Important observations to be made by the applicant
* statements describing Important observations to be made by the applicant
                       -      criteria for successful completion of the task
                       -      criteria for successful completion of the task
                      -
                                                                                                                                 ~ tJ/'
                                                                                                                                 ~ tJ/'
identification of critical steps and their associated performance standards b.
identification of critical steps and their associated performance standards b.
Line 52: Line 48:
: 3. SIMULATOR CRITERIA I  --
: 3. SIMULATOR CRITERIA I  --
I d) ~
I d) ~
                                                                                                                                  --    --
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
1 IOJ          (Y
1 IOJ          (Y
Line 73: Line 68:
* The facility signature is not applicable for NRC-developed tests
* The facility signature is not applicable for NRC-developed tests
               # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence Is required.
               # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence Is required.
* ES-301, Page 24 of 27}}
ES-301, Page 24 of 27}}

Latest revision as of 02:23, 6 February 2020

2013 Clinton Power Station Initial License Examination Proposed Examination Form ES-301-3
ML13231A218
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/26/2013
From:
NRC/RGN-III
To:
Exelon Generation Co
Shared Package
ML11354A437 List:
References
ES-301-3 50-461/13-301
Download: ML13231A218 (2)


Text

2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION PROPOSED EXAMINATION FILES 2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION PROPOSED EXAMINATION FORM ES-301-3

  • ES-301 Facility: Clinton Operating Test Quality Checklist Date of Examination: 8119/13
1. GENERAL CRITERIA Form ES-301-3 Operating Test Number: 2Q13301 a

Initials b* c#

~ rJ! Jl-

a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).

~1 *v~ t uz...

b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.

a (f

c. The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a).
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. t ~

~~

" sz...

e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
2. WALK-THROUGH CRITERIA -- -- --
a. Each JPM includes the following, as applicable:
  • initial conditions
  • initiating cues
  • references and tools, including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee
  • operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

-- system response and other examiner cues statements describing Important observations to be made by the applicant

- criteria for successful completion of the task

~ tJ/'

identification of critical steps and their associated performance standards b.

- restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through I

outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

3. SIMULATOR CRITERIA I --

I d) ~

The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.

1 IOJ (Y

~~e I Sig~atuj Date

a. Author T. Jenninas I ;.j i:sL 6126113

~d/.1{ h./.Jl '

~

b. Facility Reviewer (*) C. Joseohl
c. NRC Chief Examiner(#) '"'Da.S<~ P..e~J{~\..~ .l""'fU> o -~/

\jl

d. NRC Supervisor /1' _4, lf:lrt/ll'f

~ JJ#, L.

,~,.,1...

~

//\/

.~ XL/',

..:2'Z ~ /f./. . '.:.

  • v~* .,.

NOTE:

  • The facility signature is not applicable for NRC-developed tests
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence Is required.

ES-301, Page 24 of 27