|
|
Line 27: |
Line 27: |
| : b. There is no day-to-day repetition between this and other operating tests to be administered during this examination. | | : b. There is no day-to-day repetition between this and other operating tests to be administered during this examination. |
| a (f | | a (f |
| ''
| |
| : c. The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a). | | : c. The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a). |
| : d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. t ~ | | : d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. t ~ |
Line 33: |
Line 32: |
| " sz... | | " sz... |
| : e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. | | : e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. |
| ,
| |
| : 2. WALK-THROUGH CRITERIA -- -- -- | | : 2. WALK-THROUGH CRITERIA -- -- -- |
| : a. Each JPM includes the following, as applicable: | | : a. Each JPM includes the following, as applicable: |
Line 42: |
Line 40: |
| * operationally important specific performance criteria that include: | | * operationally important specific performance criteria that include: |
| - detailed expected actions with exact criteria and nomenclature | | - detailed expected actions with exact criteria and nomenclature |
| -- system response and other examiner cues | | -- system response and other examiner cues statements describing Important observations to be made by the applicant |
| * statements describing Important observations to be made by the applicant
| |
| - criteria for successful completion of the task | | - criteria for successful completion of the task |
| -
| |
| ~ tJ/' | | ~ tJ/' |
| identification of critical steps and their associated performance standards b. | | identification of critical steps and their associated performance standards b. |
Line 52: |
Line 48: |
| : 3. SIMULATOR CRITERIA I -- | | : 3. SIMULATOR CRITERIA I -- |
| I d) ~ | | I d) ~ |
| -- --
| |
| The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached. | | The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached. |
| 1 IOJ (Y | | 1 IOJ (Y |
Line 73: |
Line 68: |
| * The facility signature is not applicable for NRC-developed tests | | * The facility signature is not applicable for NRC-developed tests |
| # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence Is required. | | # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence Is required. |
| * ES-301, Page 24 of 27}}
| | ES-301, Page 24 of 27}} |
|
---|
Category:License-Operator
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22342B2602022-10-14014 October 2022 10 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments IR 05000416/20173022017-11-30030 November 2017 NRC Initial Operator Licensing Examination Approval 05000416/2017302 ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 2024-03-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2602022-10-14014 October 2022 10 Public Forms ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML16291A2602016-10-13013 October 2016 Notification of NRC Initial Operator Licensing Examination 05000416/2017301 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 GNRO-2016/00042, NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 12016-07-29029 July 2016 NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 1 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16019A3402015-12-14014 December 2015 2015-12 Post Exam Comments 2024-03-21
[Table view] |
Text
2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION PROPOSED EXAMINATION FILES 2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION PROPOSED EXAMINATION FORM ES-301-3
- ES-301 Facility: Clinton Operating Test Quality Checklist Date of Examination: 8119/13
- 1. GENERAL CRITERIA Form ES-301-3 Operating Test Number: 2Q13301 a
Initials b* c#
~ rJ! Jl-
- a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
~1 *v~ t uz...
- b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.
a (f
- c. The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a).
- d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. t ~
~~
" sz...
- e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
- 2. WALK-THROUGH CRITERIA -- -- --
- a. Each JPM includes the following, as applicable:
- references and tools, including associated procedures
- reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee
- operationally important specific performance criteria that include:
- detailed expected actions with exact criteria and nomenclature
-- system response and other examiner cues statements describing Important observations to be made by the applicant
- criteria for successful completion of the task
~ tJ/'
identification of critical steps and their associated performance standards b.
- restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through I
outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
- 3. SIMULATOR CRITERIA I --
I d) ~
The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
1 IOJ (Y
~~e I Sig~atuj Date
- a. Author T. Jenninas I ;.j i:sL 6126113
~d/.1{ h./.Jl '
~
- b. Facility Reviewer (*) C. Joseohl
- c. NRC Chief Examiner(#) '"'Da.S<~ P..e~J{~\..~ .l""'fU> o -~/
\jl
- d. NRC Supervisor /1' _4, lf:lrt/ll'f
~ JJ#, L.
,~,.,1...
~
//\/
.~ XL/',
..:2'Z ~ /f./. . '.:.
NOTE:
- The facility signature is not applicable for NRC-developed tests
- Independent NRC reviewer initial items in Column "c"; chief examiner concurrence Is required.
ES-301, Page 24 of 27